Laserfiche WebLink
31S .I000 , Inc . <br /> S J C O G, Inc. <br /> San Joaquin County Multi-Species.Habitat Conservation &Open Space Plait <br /> 555 East Weber Avenue•Stockton,CA 95202• (209)235-0600• FAX(209)235-0438 <br /> • SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, <br /> Building Department, Engineering Department, Survey Department, Transportation <br /> Department, <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County <br /> Multi-Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that <br /> agreement, the Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by <br /> the project applicant prior to any ground disturbance but no later than six(6)months from receipt of <br /> the ITMMs. If ITMMs are not signed within six months,the applicant must reapply for SJMSCP <br /> Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the <br /> ITMMs. This is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the <br /> ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant <br /> must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project <br /> acreage being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever <br /> occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> F <br /> Project Title: PA-2100146 (MS) Re-Referral <br /> Landowner: Williams, Webster Applicant: Dillon & Murphy <br /> Assessor Parcel#s: 065-100-44,-45 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Kelsey Gunter <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored <br /> and that appropriate fees are paid in compliance with the SJMSCP. <br />