My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2800 - Aboveground Petroleum Storage Program
>
PR0536557
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 11:17:51 AM
Creation date
7/23/2021 4:53:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0536557
PE
2832
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A NJ O A Q U l N Environmental Health Department <br /> COUNTY— <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TRACY TRUCK AND AUTO STOP 3940 N TRACY BLVD,TRACY July 19, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan reviewed at the time of <br /> inspection,dated 9/20/2017, did not follow the order or requirements of 40 CFR Part 112.7.The SPCC Plan doesn't <br /> follow the required SPCC rule sequence and doesn't include an adequate cross-reference section. The <br /> table of contents and cross reference section had conflicting page numbers. Pages in the SPCC Plan were not <br /> numbered. <br /> REGULATION GUIDANCE: If you are the owner or operator of a facility subject to this part you must prepare a Plan <br /> in accordance with good engineering practices.The Plan must have the full approval of management at a level of <br /> authority to commit the necessary resources to fully implement the Plan.You must prepare the Plan in writing. If you <br /> do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan acceptable to <br /> the Regional Administrator that meets all of the applicable requirements listed in this part, and you must supplement <br /> it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in <br /> the other prevention plan. If the Plan calls for additional facilities or procedures, methods, or equipment not yet fully <br /> operational, you must discuss these items in separate paragraphs and must explain separately the details of <br /> installation and operational start-up. <br /> CORRECTIVE ACTION: Ensure that your SPCC Plan follows the required SPCC rule sequence or includes an <br /> adequate cross-reference. Provide proof of correction to the EHD. <br /> This is a repeat violation, Class II. <br /> 603 CFR 112.7(a)(3)Failed to adequately describe the physical layout of the facility in the Plan. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan failed to adequately describe the <br /> physical layout of the facility. Piping and transfer areas were missing on the facility diagram. <br /> REGULATION GUIDANCE: (3) Describe in your Plan the physical layout of the facility and include a facility diagram, <br /> which must mark the location and contents of each fixed oil storage container and the storage area where mobile or <br /> portable containers are located.The facility diagram must identify the location of and mark as"exempt" underground <br /> tanks that are otherwise exempted from the requirements of this part under§ 112.1(d)(4).The facility diagram must <br /> also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise <br /> exempted from the requirements of this part under§ 112.1(d)(11).You must also address in your Plan: <br /> (i)The type of oil in each fixed container and its storage capacity. For mobile or portable containers, either provide <br /> the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or <br /> portable containers,the types of oil, and anticipated storage capacities; <br /> CORRECTIVE ACTION: The SPCC Plan shall include a facility diagram that must identify the location and contents <br /> of each fixed storage container and the storage area where mobile or portable containers are located. It must <br /> identify the location of and mark as"exempt"all underground storage tanks. It must also include all transfer stations <br /> and connecting pipes, including intra-facility gathering lines. Immediately ensure the SPCC plan adequately and <br /> accurately describes the physical layout of the facility; submit proof of correction to the EHD. <br /> This is a repeat violation, Class ll. <br /> FA0008057 PR0536557 SCO01 07/19/2021 <br /> EHD 28-01 Rev.9/16/2020 Page 6 of 9 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.