My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0042255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COTTAGE
>
438
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0042255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:52:30 PM
Creation date
7/28/2021 2:39:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0042255
PE
4372
STREET_NUMBER
438
STREET_NAME
COTTAGE
STREET_TYPE
AVE
City
MANTECA
Zip
95336-
APN
20823063
ENTERED_DATE
7/8/2021 12:00:00 AM
SITE_LOCATION
438 COTTAGE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL ENGINEERING SERVICES PROPOSAL (Soils Report) <br />Geotechnical Report — New Single Family Residence <br />438 Cottage Ave, <br />Manteca, CA 95336 <br />June 22, 2021 Page 4 <br />for project development and will provide seismic loading criteria and seismic settlement potential for the <br />new structures. The laboratory budget includes performing tests for material gradations, plasticity, <br />expansion potential, and classification. The quantity and types of tests may vary depending upon soil <br />uniformity below the site. <br />Engineering and Geologic Evaluation ---------------------------------------------------------------------------- $1,734.00 <br />The final report will represent field and laboratory data, evaluation of the site geology and soil formation <br />properties. The report will evaluate for and will provide appropriate seismic loading parameters and <br />seismic settlement evaluations for the proposed building expansion. <br />Total Lump Sum Project Cost --------------------------------------------------------------------------------------- $3,645.00 <br />The cost proposal is based upon the above-mentioned scope of services and our understanding of the <br />project. Should any unforeseen conditions rise that would significantly affect the cost of the investigation, <br />the client will be notified within one working day. If any additional laboratory testing becomes necessary, <br />the client will be informed of any additional cost prior to performing the test. <br />Principal Engineer <br />$ 150.00/ hr. <br />Senior Engineer/Geologist <br />$ 140.00/ hr. <br />Project Engineer/Geologist <br />$ 130.00/ hr. <br />Staff Engineer/ Geologist <br />$ 110.00/ hr. <br />Soil Technician <br />$ 100.00/ hr. <br />We are available for conference calls, meetings, and to review earthwork and foundation related portions <br />of project drawings and specifications and to confer with the design team after submittal of our report. <br />Such follow-up services are beyond the scope of this proposal and would be charged at $165.00 per hour <br />for a Senior Geotechnical Engineer. We will obtain your specific written authorization prior to providing <br />any additional services <br />- _? GAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.