My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
38
>
1200 - Lead Program
>
PR0529468
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2021 10:00:36 AM
Creation date
8/10/2021 9:02:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1200 - Lead Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0529468
PE
1201
FACILITY_ID
FA0019562
FACILITY_NAME
KING, PETER R
STREET_NUMBER
38
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
15121052
CURRENT_STATUS
02
SITE_LOCATION
38 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6.1 Standard Reevaluation Schedules <br /> pActlan Taken Reevaluation Visual Sunray(by <br /> Schedule Evaluation Results Frequency owner or owner's <br /> and Duration representative) <br /> 1 Combination risk ass essmentrnspection finds None. <br /> None. None. <br /> no leaded dust or soil and no lead-based paint. <br /> 3Years. Annually and whenever <br /> 2 No lead-based paint hazards round during risk None. information Indicates <br /> assessment conducted before hazard control a possible problem, <br /> or at clearance(hazards include dust and soil). <br /> 3 The average of leaded dust levels on all floors, A. Interim controls and/or haz- t Year,2 Years. except for ncu su as Schede2 <br /> interior window sills, or window troughs sampled and abatement(or mixture of (ants.The first visual <br /> exceeds the applicable standard, but by less than the two),Including,but not survey of <br /> a tactor of 10. necessarily limited to,dust Y encs <br /> su- <br /> p f 1 <br /> removal.This schedule does lants should be done ti <br /> not include window replace- one month after clear- -a <br /> ment. ante;the second r+ <br /> CD <br /> should be done 6 <br /> B. Treatments specified in sec- 1 Year, months later and <br /> tion A plus replacement of all annually thereafter. O <br /> windows with lead hazards. <br /> Same as Schedule 3 <br /> C. Abatement of all lead-based None. Q <br /> paint using encapsulation or above. 3 <br /> enclosure. <br /> D. Removal of all lead-based None. None. p <br /> paint. <br /> 4 The average of leaded dust levels on all floors, A. Interim controls and/or hazard 6 Months,1 Year, Same as Schedule 3. <br /> 1. <br /> 4 <br /> interior window sills,or window troughs sampled abatement(or mixture of the 2Years. 3 <br /> exceeds the applicable standard by a factor of 10 two),Including,but not neces- to <br /> or more, sarlly limited to dust removal. <br /> This schedule does not In- <br /> clude window replacement. <br /> B. Treatments specified in sec- 6 Months,2 Years. Same as Schedule 3. <br /> tion A plus replacement of all <br /> windows with lead hazards. <br /> C. Abatement of all lead-based None. Same as Schedule 3. <br /> paint using encapsulation and <br /> enclosure. <br /> D. Removal of all lead-based None. None. <br /> paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.