Laserfiche WebLink
.,. +W <br /> r _ _ <br /> Table L!!JRandard Reevaluation Schedules:(continued) <br /> - . _._.__ <br /> Schedule Evaluation Results Action Taken' Reevaluation Visual Survey(by. <br /> Frequency owner or owner's <br /> and Duration representative) <br /> tNo leaded dust or leaded soil hazards identified;but g JAS Interim controls or mixture( 2 Years 4 ISame as$chedule„ _3? <br /> ILflead based paint oread based paint hazards are of interim controls and a <br /> aurid - abatement(not including <br /> --dr_eplacement) <br /> B. Mixture of interim controls 3Years. Same as Schedule 3. <br /> and abatement,including <br /> window replacement. <br /> C. Abatement of all lead-based 4 Years. Same as Schedule 3. i? <br /> paint hazards,but not all 21 <br /> lead-based paint:D. Abatement of all lead-based None-, Same as Schedule 3. � <br /> paint using encapsulation or " <br /> enclosure, <br /> E. Removal of all lead-based None. None. L4 <br /> i <br /> paint. � <br /> 6 bare-I�ed soil.exceeds standard,but fess thari Interim.controis. N e. �ThreQ months to check ; � <br /> 5,QQ0.µ9/g <br /> new ground coover then <br /> annuaity to Identity <br /> new bare spots.Vo <br /> r+ <br /> 011 <br /> 7 Bare leaded soli greater than or equal to 5,000µg/g. Abatement(paving or remoral). None. None for removal,an2. <br /> - <br /> ,. nually to Identify new :3 <br /> ,{ bare spots or deteri- / <br /> oration of paving. <br /> w <br /> p <br /> } <br /> i . <br /> -F' <br />