Laserfiche WebLink
dedicated secondary containment for each of the tanks(see Proposed Schedule of 01 <br /> Modifications at the front of this Plan.) <br /> Two Biosol Mixing Tanks <br /> There is no dedicated secondary containment provided for each of the Biosol mixing tanks <br /> (100 and 200 gallons each). The Biosol mixing tanks are located indoors. The building <br /> provides secondary containment for each AST, and the tanks are located downgradient of the <br /> property fenceline and at a distance that a release of the entire tank's contents should not be <br /> able to discharge offsite to a surface water body. <br /> The facility elected to provide dedicated secondary containment for the tanks(see Proposed <br /> Schedule of Modifications at the front of this Plan.) <br /> Curbing,n-112.7(c)(1)(ii) <br /> Curbing is not utilized as a containment or diversionary structure for oil storage at this <br /> facility except as noted in Table 2. <br /> Culverts, Gutters, or Other Drainage- 112.7(c)(1)(iii) <br /> Drainage within the lower level of the manufacturing portion of the building is engineered so <br /> that the drainage flows into an oil/water separator located in this area of the facility. Minor <br /> spills on the upper and lower levels of the manufacturing area would be cleaned up or flow to <br /> and be contained by the oil/water separator system. <br /> Weirs, Booms, or Other Barriers-112.7(c)(I)(iv) <br /> The following equipment is maintained at the facility for response to and containment in the <br /> event of a release: forklifts, fire extinguishers, barricades, portable generator and lights, <br /> portable sump, shovels and brooms,two-way radios, front-end loaders, and booms. <br /> Spill Diversion Ponds-112.7(c)(1)(v) <br /> Spill diversion ponds are not utilized at the facility as containment or diversionary structures. <br /> Retention Ponds- 112.7 0(1)(00 <br /> The facility maintains retention ponds for storm water management onsite. The retention <br /> ponds are not devoted to providing secondary containment for the oil ASTs. <br /> 24 May 2017 <br />