Laserfiche WebLink
■ <br /> N <br /> O <br /> N N <br /> M <br /> LO <br /> ccd <br /> 0 Professions�i Engineer Certification 40 CFR 112.3(d) <br /> CERTIFICATION-o TION- B, tt,e <br /> -00 requirements o f ans of this certification, 1 attest that [ <br /> o examined Provisions of 40 CFR Part 1 12, arrt ftuniliar with the <br /> � p the facice_,, that this SPCC Plan has been tprepareiitir�accordance with good <br /> = engiReeRn gnated agent have visited and <br /> d g Practices. including consideration of a <br /> requirements of this Part that procedures applicable industry standards,and with the <br /> established for required inspections and testing have been <br /> and that the Plan is adequate for dhe facility. <br /> "`The professional Engineer has signed and certified the SPCC Plan <br /> the"Plementation schedule would be adhered to and completed as proposed in s <br /> (a)(1)Conformancewith the expectation that <br /> N-6th 40 CFR Part 112.7. section 112.7 <br /> Engineer: <br /> Michael J. Zimmerman,P.E. <br /> Signature: <br /> Registration No.: CFF-3183 <br /> State: California <br /> Date: <br /> ll �yp <br /> QR�F�SIO� <br /> (Seal) <br /> w � No.CH51�3 m <br /> Cr � <br /> Management Approval 40 CFR 112.7 <br /> This Spill Prevention Control and Countermeasure(SPCC)Plan fully supported by the <br /> management of Owens-Brockway Glass Container Inc. (Owens-Brockway). Owens- <br /> Brockway will implement this Plan and amend it as needed due to discharge of oil, facility <br /> expansions,modifications, or improvements. <br /> U Rodney Detmer <br /> 0 Plant Manager Date <br /> 1` Owens-Brockway Glass Container Inc. <br /> _ Tracy, California Plant#22 <br /> LU <br /> U � <br /> -C X <br /> U <br /> U N <br /> o T 1 November 8,2004 CCU <br /> o <br /> — <br /> � <br /> o (13 <br /> vNv :,. <br /> v U) w <br />