My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2800 - Aboveground Petroleum Storage Program
>
PR0516327
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 6:08:55 PM
Creation date
8/19/2021 8:45:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516327
PE
2832
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14700 W Schulte Rd. Tracy. CA Record ID PR0516327 <br /> 4-14-2016 PHOTO # 3 <br /> lowing materials are maintained art the f�ac;ilit fior Fresponse t0 and c;()ntainM r1t in Lr�� <br /> went cif a re:lerasc: h()()r11s. floor dry, ahsonccnt socks. sponge part.icuat.e, ahsonccrnt p)ll()Ws, <br /> plastic sheets to cover catch basins, and socia ash and sand. 'I he inventories are chec,kc.a <br /> monthly to replenish used materials. Adequate materials arc resent. at the facility and Spill <br /> J p <br /> kits will he 1Ocated in theist areas where releases arc likely to Occur. <br /> Demonstration of* Practicability-40 CTR fart 1 12.7((1) <br /> Owens-BroLk%,ttaN 's manaVemcnt has determined that the use Of tlhe containment and ,ed <br /> di\ crsiOnary struc.:tures, and the use of readily available spill c( iprnc;nt to prevent dischar� <br /> ()il fron) reaching navig ahle water, is practical and effective at this facility. 'lhcref"c�re� an 011 <br /> spill contingcncy plan as descr '}'It <br /> ihcd in 40 ( 109 is not required Or included in this �1 <br /> flat). and 40 ( '1- K 1 12.7(d) since the: facility has adequate dedicated or general sec(�ndary <br /> containment fi)r the Oil h.rndlcd Onsitc. <br /> Inspections and Records-40 ('FR fart 112.7(c) <br /> }Monthly visual inspections consist of a complete walk-through Of the facility to check the <br /> ('))lowing: piping, equipment and tanks fear leakage, soils fOr staining and discoloring, <br /> excessive accumulation of'rainwater in outdoor dike tail handling areas, verification that dike <br /> drain valves arc closed. <br /> 21 June 2014 <br /> t)pcC Ra n <br /> Elena Manzo, REHS Page 3 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.