Laserfiche WebLink
A C E G.2 C J L G. J L JL n nlic <br /> J.1 J.2 J.3 <br /> . H <br /> I I I I I o <br /> C1_J coCD C4,� r,- � <br /> ik = � N <br /> CD _ti <br /> CD <br /> w C� <br /> ct CI_ � <br /> II <br /> x CST <br /> o � � � <br /> � oM <br /> CD <br /> O O O O m N <br /> — — — <br /> 2 CO 4"CO 0 <br /> 0 <br /> 4„ 0� <br /> 2,rV co a� <br /> I o 0 0 co <br /> 3 V 2"V <br /> 0 0 0 <br /> CO CO ® 0 0 0 <br /> 3 — — O "V <br /> CD O 111 11 0 1 111 o0 ❑ WCO F � FD I F I <br /> 0000 00 00 3"FD-1 ® JV 2442 u0 3"FD-1° ° ° o000 ° ° ° 2"V Store: <br /> Nuuuuuuuuuu 0000 <br /> puUupuUupu M ° ° ° 0 0 0 0 ° ° ° 3„v WC-2 <br /> ° ° ° ° ° ° T — ❑ 1311 E. YOSEMITE AVE. <br /> ❑ —� <br /> �FYVTRMANTECA, CA 95336 <br /> 0cg ° ° ° ° ° ° 3„F2„VOII ° \\\ <br /> 0 0 I HS-2 HS-2 LLQ 0 \\\ <br /> pupup 2442 M <br /> . 0 Restaurant #RC529 <br /> tl wco wco 2,>v 111 ❑ <br /> pppppppp 2430 1-1/2"V 3 FD-1 3"FD-1 — II <br /> uuuuuuuuuu ° ° ° ° ° ° 3—COMP � 4"FD-1 C� — IF] 11 <br /> pppppppppp ° ° ° ° ° ° Professional of Record: <br /> O FS 3"FD-1 3r,V WC-2 T — — — — 1 WC-2 3»V III <br /> 2"V <br /> I I # <br /> 4"FD-2 2"V FS 1 2"CD (��) La tY I I I <br /> 2"V — — 2rrV I I <br /> Ll [I <br /> i z 00 00 — <br /> 00 00 / 'z c9c9 oo <br /> 00 4„S \ SI 4S <br /> 4"FCO o III # <br /> N <br /> CO2 4„FCO ee ee I <br /> 7S-1 <br /> 2„V 9 <br /> 0 0 <br /> 4"WG 4"WG 4„F 6 \ I J — � ' I ROBISON <br /> 10 COOKING 01 O 4"FCO r I I 3"FD-1 I ` �— r� \ I I II ❑ ENGINEERING, INC <br /> COLLECTION I I I — I I 11 19401 40TH AVE W.,SUITE 302 <br /> SYSJEM <br /> BREADING LYOD WA 98036 <br /> 3"FD-1 4"FD-1 3D— L 20636443 <br /> O J STATION11 <br /> 5 — ppppp 243 ppppp 243 FS — — — / — — O — — I Ll ❑ REI# 424-1497 <br /> uuuuuuuu uuuuuuuu L `° 1- <br /> - — o o ° 1 ❑ <br /> pupupupupu uuuuuuuuuu I <br /> 2436 2442 pppppppppp 0000 00000 <br /> 2"V PRE—WASHINGI 3 <br /> 2"V SINK 2rrV <br /> ppppp 243 36 FSLl [I <br /> TDICE MACHINE <br /> uuuuuuuu 't I Ll 11 <br /> uuuuuuuuuu / a <br /> uuuuuuuuuu HS-1 I I 2"V / ` C WCO <br /> 3"FD-1 u 124x36 / L — 1 i i HS-1 2"V QROFESS/pN <br /> 0. q <br /> 2„v 2 V - - °° L - - J 2 v ROBis, F <br /> 0 IL <br /> .01 hill / � M 2871 <br /> 2'v 4„WG / \\ <br /> �/ 4'FCO J ® 4"FD-1 I � / I ®C 2 V EXP 0-21 <br /> 3"FD-1 FSZ� _ <br /> 2„V 4 FD-1 3"FD-1 I • J'J9 'tlF O <br /> � <br /> ibi 4»FCO I � � I � - - - - - - - - - - - — T OF cA��F � <br /> 71 ��b _F F777 — = II II <br /> 8 — o F— ^� 2"V ° POT BOWL FAUCET FI �Q ° ° 0 El <br /> �/I III O O <br /> Fs I ❑ 4"FCO 2»v XIII II <br /> E — — I O FS III 08/07/20 <br /> o 0 0 3660 FS <br /> ❑ 2"V Prototype: P4 EXTENDED- HV, SCHEME A <br /> - -1 — � <br /> gILI I Prototype Issue Date: 6.29.2020 <br /> 11 Design Bulletin Updates: INCLUDED <br /> N 1 3 <br /> Date Issued: Bulletin Number: <br /> PLUMBING FLOOR PLAN NOV. 2018 1 & 2 <br /> SCALE: 1/4"= 1'-0" <br /> 1ST BLDG. SUBMITTAL <br /> 21 KEYNOTES 31 GENERAL NOTES <br /> O ICE MACHINE CONDENSERS TO BE LOCATED ON ROOF. 1. DRAIN LINES REQUIRING AN INDIRECT CONNECTION TO THE GREASE WASTE OR SANITARY SYSTEM SUCH AS FROM 3—COMPARTMENT SINKS, PREP <br /> SINKS, ICE MACHINES, ICE BINS, CONDENSATE LINES FROM WALK—IN COOLERS AND SIMILAR FOOD STORAGE EQUIPMENT SHALL BE INDIRECTLY <br /> O RE: CIVIL DRAWINGS FOR SITE ROUTING. CONNECTED TO ITS RESPECTIVE SYSTEM BY MEANS OF A 2" AIR GAP. REVISIONS: <br /> O <br /> ROUTE DRAIN LINES FULL SIZE FROM ICE BIN DRAIN CONNECTION AND ICE MACHINE <br /> 2. PLUMBING CONTRACTOR SHALL COORDINATE FIXTURE LOCATIONS WITH EQUIPMENT DRAWINGS AND MILLWORK. 1 08-07-20 1st. Bldg. Submittal <br /> CONNECTION TO FLOOR SINK. 3. ALL EXPOSED COPPER WASTE LINES IN KITCHEN AND WASH AREA SHALL BE PAINTED. ALL SURFACES SHALL BE CLEAN AND DRY WHEN PAINT IS 2 <br /> O 3" GAS UP TO ROOF, RE: 1P2.1 FOR CONTINUATION. GAS METER AND REGULATOR(IF APPLIED. COORDINATE COLOR(S) WITH OWNER. 3 <br /> REQUIRED) SHALL BE PROVIDED AT CONTRACTOR'S EXPENSE. 4. NO GARBAGE GRINDERS SHALL BE INSTALLED. 4 <br /> 5 <br /> OROUTE ROOFTOP A/C UNIT CONDENSATE DRAIN FROM ROOF THROUGH CEILING TRUSSES 5. REFER TO CIVIL DRAWINGS FOR FINISHED FLOOR ELEVATION. 6 <br /> TO 4” FS. <br /> ROUTE DRAIN LINE FROM BATTER CART TO 3"FS. <br /> 6. REFER TO FOOD SERVICE FLOOR PLANS AND ELEVATIONS FOR ALL ROUGH—IN REQUIREMENTS. 7 <br /> © <br /> 7. TRAP PRIMERS ARE REQUIRED TO BE USED FOR ALL INFREQUENT FLOOR DRAINS. CPC 1007.0 8 <br /> O RE: CIVIL DRAWINGS FOR SITE GAS ROUTING. <br /> 9 <br /> O 3/4" GALVANIZED STEEL PIPE WITH THREADED JOINTS ROUTED ABOVE CEILING <br /> FROM FRYERS TO GREASE COLLECTION TANK. SLOPE PIPE AT NO LESS THAN 1/4" <br /> PER FOOT TOWARDS TANK. PIPING INSTALLED OUTDOORS SHALL BE HEAT TRACED <br /> USING SELF—REGULATING HEAT TRACE CABLE RATED FOR 5 WATTS/FOOT AT 120V. Sheet Title: <br /> INSULATE OUTDOOR PIPING WITH 1" THICK ELASTOMERIC FOAM INSULATION COVERED WASTE & GREASE <br /> WITH ROLLED ALUMINUM SHEET JACKETING AND MATCHING FITTING COVERS <br /> SECURED WITH STAINLESS STEEL BANDS PLUMBING PLAN <br /> O 3/4” GREASE COLLECTION LINE ROUTED EXPOSED ON WALL BEHIND COOKING <br /> EQUIPMENT. SECURE TO WALL WITH STAINLESS STEEL CONDUIT CLAMPS. PROVIDE <br /> TWO OR THREE 3/4” STUB—OUTS 24" AFF CENTERED ON EACH FRYER BANK FOR Date: 08.07.2020 <br /> GREASE COLLECTION SYSTEM. FINAL CONNECTION TO FRYERS BY OTHERS. RE: <br /> FOOD SERVICE ELEVATIONSI LOCATION <br /> Project Number: RAC19024.0 <br /> 10 EVACUATION LINE FROM GREASE TANK TO PUMP—OUT CONNECTION BY OTHERS. <br /> Drawn By: XXX/XXX <br /> 11 3" VENTS FROM GREASE INTERCEPTOR TO BUILDING ROOF <br /> 12 ROUTE 3/4" DRAIN LINES FROM COOLER/FREEZER EVAPORATOR UNITS TO 4" FS. <br /> PROVIDE UNION AT PAN CONNECTIONS TO ALLOW FOR MAINTENANCE OF PAN. Sheet Number: <br /> P1 2 <br /> J <br /> Q <br /> 1= <br /> G <br /> CD <br /> fn <br />