|
J.1 J
<br /> _ — H
<br /> W o
<br /> 0 N m
<br /> x co
<br /> w N
<br /> • W QU_
<br /> L3 cn o
<br /> V � C-0
<br /> M N
<br /> O ti
<br /> O O�
<br /> CO �
<br /> CD
<br /> AF ~
<br /> F-4 3 A-52,54,56 El CU-2 0
<br /> A-31 1/4HP,120V1 P2W #10 4.04KVA,208V3P4W
<br /> A-45,47,49 Store:
<br /> A-20,22,24 3/4"C,3#1 0,#1 0N,#1 OG 1311 E. YOSEMITE AVE.
<br /> WP A-46,48,50WWP MANTECA, CA 95336
<br /> FREEZER COMPRESSOR 30/3/NP 1 10
<br /> 5.04KVA,208V3P3W ` rl��t �� �tri152
<br /> A-39,41,43
<br /> A-26,28,30 CU-3 Professional of Record: NAME
<br /> CU-1 1.75KVA,208V3P4W
<br /> 5.22KVA,208V3P4W
<br /> O
<br /> COOLER COMPRESSOR 030/3/NP �r
<br /> WP � ,moi
<br /> 5.04KVA,208V3P3W MUA-2
<br /> P 2HP,208V3P3W 1
<br /> F-3
<br /> 1.5HP,208V3P3W
<br /> A-8,10,12 ROBISON
<br /> MUA-1 A-40,42,44
<br /> 1 1.5HP,208V3P3W #10 RTU,1 208V3P4W 2 4 ENGINEERING, INC
<br /> WP 3H P,13K VA, i 9401 40TH AVE W.,SUITE 302
<br /> h A-14,16,18 ❑ A-7,9,11 L 206.964-3343 TEL
<br /> V A/ A-13,15,17 1"C,3#6,#6N,#10G
<br /> 5 \ z :� d 1-1/4"C,3#2,#2N,#8G F-2 A-33,35,37 \ REI# 424-1497
<br /> \� 1.5HP,208V3P3W
<br /> \ W b<\�p F 7
<br /> 4 2 RTU-2 z���I O O
<br /> 5HP,19.7KVA,208V3P4W - WP
<br /> 6
<br /> F-1 QROF ESS/ON
<br /> ZN
<br /> 1.5HP,208V3P3W ZN(�WPCI
<br /> 2
<br /> B-4
<br /> OWP o. E-23059 rn
<br /> O® O � ' 30/2 OWP m
<br /> WP
<br /> 30/2(D- 30/2 � EXP. 3- 1-22 �
<br /> Ll
<br /> C - O
<br /> l <EC \
<br /> Li L1 L1 Li Ll F CAS\FO
<br /> OO
<br /> O � H
<br /> i
<br /> 08/07/20
<br /> Prototype: P4 EXTENDED- HV. SCHEME A
<br /> LzJ 0 Prototype Issue Date: 6.29.2020
<br /> 11
<br /> O O Design Bulletin Updates: INCLUDED
<br /> POWER ROOF PLAN Date Issued: Bulletin Number:
<br /> 1/4"= V-0" NOV. 2018 1 & 2
<br /> I I I I � __
<br /> 1st Building Submittal
<br /> O O O O 0 C8 J.1 J3
<br /> KEYNOTES
<br /> REVISIONS:
<br /> OPROVIDE 3#12, 1#12G, 1/2"C FROM SUPPLY FAN TERMINAL BLOCK ON HOOD PRE-WIRED 1 08-07-20 1st. Bldg. Submittal2
<br /> CONTROL CABINET TO MAKE-UP AIR PACKAGE ON ROOF.
<br /> 3
<br /> OPROVIDE WIRE AND CONDUIT AS REQUIRED FOR FACTORY PROVIDED/CONTRACTOR 4
<br /> INSTALLED MOTORIZED DAMPER ASSOCIATED WITH THE ROOFTOP UNIT. 5
<br /> OCONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT. 6
<br /> INTERLOCK CONTROLS WITH RTU-1 CONTROLS. PROVIDE BOX AND CONDUIT AS REQUIRED. 7
<br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL 8
<br /> NOT PROVIDE A SEPARATE ROOF PENETRATION. 9
<br /> O4 CONNECT CIRCUIT TO FACTORY PROVIDED/CONTRACTOR INSTALLED DISCONNECT SWITCH.
<br /> IF NAMEPLATE DOES NOT LIST AN HVAC BREAKER RATING, PROVIDE A FUSIBLE
<br /> DISCONNECT SWITCH WITH FUSES SIZED PER NAMEPLATE RATING. CONDUIT SHALL BE
<br /> RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL NOT PROVIDE A
<br /> SEPARATE ROOF PENETRATION. Sheet Title:
<br /> OCONTRACTOR TO PROVIDE WEATHERPROOF, GROUND FAULT INTERRUPTING RECEPTACLE POWER ROOF
<br /> MOUNTED ON PARAPET WITHIN 25 OF EACH RTU UNIT. SEAL ON BOTH INTERIORAND
<br /> EXTERIOR EDGE OF THE PARAPET. INSTALL SEAL SUCH THAT IT IS WATER TIGHT. PLAN
<br /> CONDUIT SHALL BE RUN TO ROOF BETWEEN DUCT AND ROOF CURB. CONTRACTOR SHALL
<br /> NOT PROVIDE A SEPARATE ROOF PENETRATION. Date: 08.07 2020
<br /> O CONNECT THE CONDENSER AND CONDENSER DISCONNECT TO THE OUT GOING CONDENSER
<br /> CONNECTION FROM THE ICE MACHINE WHICH IT SERVES. PROVIDE LIKE WIRE/CONDUIT AS Project Number: RAC19024.0
<br /> THAT WHICH IT FEEDS THE ICE MACHINE IT SERVES.
<br /> SEAL THE PENETRATION TO THE ROOF SUCH TO DETERMINE A WATERPROOF SEAL. Drawn By: XXX/XXX
<br /> Sheet Number:
<br /> E2 . 3
<br /> J
<br /> Q
<br /> H
<br /> H
<br /> L
<br /> co
<br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC.
<br /> JESCALONA F:\_PEDRO+MCCRACKEN\_RAISING CANES\424-1497 MANTECA, CA\DWG\E23P4.DWG 07-22-2020 15:44
<br />
|