Laserfiche WebLink
In <br /> - wED <br /> N C'7 <br /> CDx <br /> O ti <br /> x 0) <br /> i< <br /> Q c13 <br /> L3_ `° o <br /> V C Q <br /> C=, o o� <br /> cfl <br /> �CD <br /> m N <br /> Oti <br /> O OD <br /> O <br /> -® N <br /> Store: <br /> 1311 E. YOSEMITE AVE. <br /> MANTECA, CA 95336 <br /> Restaurant #RC529 <br /> Professional of Record: NAME <br /> A P <br /> MANROBISON <br /> _ <br /> ENGINEERING, INC <br /> ROOM VOLTS 208Y/1 20V 3P 4W AIC 65,000 19401 40TH AVE W.SUITE 302 <br /> FED FROM UTILITY BUS AMPS 600 MAIN BKR 600 LYNNWOOD,WA9803E <br /> 206-3643343 TEL <br /> NEUTRAL 100% LUGS STANDARD <br /> NOTE REI# 424-1497 <br /> CKT BREAKER LOAD KVA <br /> # TRIP/POLES CIRCUIT DESCRIPTION A B C FEEDER RACEWAY AND CONDUCTORS <br /> FAULT CURRENT SCHEDULE 1 600/3 PANEL A 62.5 58.1 54.2 (2)4"C,3#350kcmil,#350kcmil N,#2/OG,#2/OIG FEEDER SCHEDULE <br /> DEVICE FAULT AIC L—N FED FEEDERID FEEDER CONDUIT AND FEEDER FEEDING Q�OFESS7pN <br /> RATING VOLTS FROM SIZE LENGTH TOTAL CONNECTED KVA BY PHASE 62.5 58.1 54.2 AMPS THESE <br /> HECES ``���0 �S A Ye 'A��c� <br /> DEVICE CONN KVA CALC KVA CONN KVA CALC KVA o. E-23059 m <br /> UTILITY 65,000 --- 120V LIGHTING 16.7 20.9 (125%) CONTINUOUS 0.7 0.875 (125%) 0 200 2 C,3#3/0,#3/ON,#6G C, D � <br /> LARGEST MOTOR 6.32 7.9 125% HEATING 1.2 0 0 2 200 2"C,3#3/0,#3/ON,#6G,#6IG g EXP. 3— 1-22 <br /> MAIN 35,602 65,000 120V UTILITY (2)#350kcmil 61' � � � %� 0 <br /> OTHER MOTORS 30.5 30.5 (100%) COOLING 4.59 4.59 (100%) O3 600 (2)4"C,3#350kcmil,#350kcmil N MAIN qT QFC R� <br /> A 27,243 42,000 120V MAIN (2)#350kcmil 40' RECEPTACLES 19.2 14.6 (50%>10) NONCONTINUOUS 46.1 46.1 (100%) F CA��F� <br /> B 18,982 42,000 120V A #3/0 24' KITCHEN EQUIP 49.5 32.2 (65%) DIVERSE 0 0 (N/A) ® 600 (2)4"C,3#350kcmil,#350kcmil A <br /> C 21,495 42,000 120V A #3/0 15' METERBANK 0 0 (0%) METERED DEMAND 0 0 (125%) N,#2/OG,#2/OIG <br /> TOTAL KVA 175 158 SIZING METHOD: COPPER, 60°C #12 THROUGH #1, 75°C 1/0 AND ABOVE 08/07/20 <br /> D 17,298 42,000 120V A #3/0 32' BALANCED 3—PHASE AMPS 437 <br /> MAXIMUM FAULT AT UTILITY TRANSFORMER IS TAKEN AT WORST CASE SCENARIO OF Prototype : P4 EXTENDED- HV. SCHEME A <br /> 65,000A, INCLUDING MOTOR LOAD CONTRIBUTIONS. EC TO OBTAIN FINAL FAULT CURRENT <br /> LETTER FOR TRANSFORMER FROM UTILITIES AND UPDATE FINAL FAULT CURRENT AND AIC Prototype Issue Date: 6 29 2020 <br /> RATINGS OF NEW PANELS PRIOR TO ORDERING. Design Bulletin Updates: INCLUDED <br /> FEEDER LENGTH APPROXIMATED FOR FAULT CURRENT CALCULATIONS PURPOSES ONLY. EC Date Issued: Bulletin Number: <br /> TO VERIFY ACTUAL LENGTH OF FEEDER AND REPORT ANY MAJOR DISCREPANCY TO ENGINEER PANEL SCHEDULES <br /> IMMEDIATELY. 2 NOV. 2018 1 & 2 <br /> 1st Building Submittal <br /> EC TO COORDINATE WITH INDEPENDENT ELECTRIC <br /> AT 916 924 4848 TO PROVIDE AN ELECTRICAL <br /> SUBMITTAL FOR PANEL A. PANEL A MUST HAVE <br /> 6" DEPTH DIMENSION IN ORDER TO BE RECESSED <br /> SERVICE ENTRANCE EUSERC RATED NEMA 3R INTO WALL. <br /> AND VANDAL PROOF WITH LOCKABLE COVER EXTERIOR INTERIOR EC TO REFER TO POWER UTILITY <br /> PHASE CONDUCTORS600A METER/MAIN SWITCHBOARD. COORDINATE SERVICE SET UP MANUAL AND CEC <br /> r �——— ———— ———— —— �l ) FINAL LOCATION AND REQUIREMENTS WITH REQUIREMENTS FOR A COMPLETE <br /> GROUNDING I I ( �l I I UTILITY COMPANY NO MORE THAN TWO WEEKS F 4� LOCAL/NATIONAL CODE COMPLIANT <br /> CONDUCTOR I I ISOLATED I I I AFTER AWARDED CONTRACT I SERVICE SET UP. REVISIONS: <br /> GROUNDING <br /> / \ CONDUCTOR I PANEL 600 AMP METER SOCKET. I �'`— — — ———— ———— ———— ———— ———— 2 08-07-20 1st. Bldg. Submittal <br /> NEUTRAL CONDUCTOR / I \ I 3POA <br /> CONDUIT OR CABLE TO SERVICE I 3 <br /> �_-----DOWNSTREAM DEVICES I DISCONNECT) ISOLATED I UNDERGROUND —— — I 200A — `--� 4 <br /> — ) GROUND PULLSECTION i i I 3P 5 <br /> SUPPLY CONDUIT I I BUS — <br /> OR CABLE INSULATED EQUIPMENT / ' I 1 I — — 1 <br /> GROUNDING CONDUCTOR SERVICE GROUND-4/� 1�\ I 6 <br /> IG I I rOOA <br /> BOND NEUTRAL TO I I 3P 7 <br /> INSULATED EQUIPMENT I METAL GROUNDING I I I I 8 <br /> GROUNDING CONDUCTORMETALLIC OUTLET I GEC CONDUCTOR SYSTEM GROUND i I i I 9 <br /> BOX, RECESSED OR SERVICE— — i I <br /> NEUTRAL TERMINAL ON SURFACE CONDUCTORS J TO BUILDING STEEL I I 600A <br /> APPROVED WIRING DEVICE WITH WI NUT \ 3P I PANEL "A" <br /> RE EC TO COORDINATE <br /> PRESSURE PLATE/COVER TO METAL UNDERGROUND Q I I I Sheet Title: <br /> SCREW ARRANGEMENT 10'-0" OF METALWITH UTILITY I I I � —#2/0IG <br /> COMPANY FOR FINAL <br /> BURIED PIPE MINIMUM. IL-- — J I I RISERS SCHEDULES <br /> GROUND RODS CONDUIT/FEEDER SIZE I I I PANEL "C" � <br /> AND QUANTITY <br /> REQUIRED FOR I I PANEL "B" (TWO I AND DETAILS <br /> DUAL INSULATED SOLID <br /> GROUNDING PIGTAIL FASTENED LISTED GREEN WIRE NUT SECONDARY SERVICE I I __————J I SECTIONAL) <br /> TO THE BOX WITH A UL LISTED FOR GROUNDING PRIOR TO BID & ———— I PANEL "D" I Date: 08 07 2020 <br /> GREEN GROUNDING SCREW. CONNECTION INSTALLATION — 3 — —— _ L— ———— ———— —— ———— —J <br /> Project Number: RAC19024.0 <br /> 10'-0" APART, MIN. SEE SHEET E1.1 FOR #41G <br /> #2/0 CU TO <br /> WRAP SOLID WIRE END GROUNDING ELECTRODE SHALL BE INFORMATION RELATED GROUND ROD Drawn By: XXX/XXX <br /> ON GROUNDING ENCASED BY 2 IN OF CONCRETE. TO THE CONNECTION LOADS ARE ARRANGED <br /> � TERMINAL OF WIRING TO THE SITE SERVICE SEE DETAIL 2 <br /> 1� DEVICE SERVICE GROUNDING DETAIL LATERAL. BELOW WITH INTENTION TO <br /> DESIGN IS INTENDED FOR A FULLY COMPLY WITH CEC <br /> 31 N.T.S. RATED ELECTRICAL EQUIPMENT. 130.5(b) SEPARATION OF <br /> NOTES: EC TO COORDINATE WITH ALL BRANCH CIRCUIT BREAKERS ELECTRICAL CIRCUITS Sheet Number: <br /> FRONT INTERIOR ELEVATION <br /> 1. COORDINATE THE CONNECTION TO METAL UNDERGROUND WATER PIPE, TELEPHONE AND POWER UTILITY SHALL MATCH THE AIC RATING OF <br /> TYP. WIRING DEVICE GROUNDING DETAIL METAL FRAME OF BUILDING AND ALL OTHER ELECTRODES WITH OTHER COMPANY FOR ALL THE PANEL ISOLATED GROUND SHALL BE <br /> TRADES TO ENSURE THE GROUNDING ELECTRODES SYSTEM IS PROPERLY RESPONSIBILITIES, AND CONTACT ROUTED THROUGH THE SAME <br /> N.T.S. GROUNDED. ENGINEER IMMEDIATELY IF THERE RACEWAY AS THE PHASE <br /> ARE ANY DISCREPANCIES SHOWN CONDUCTORS, ALL THE WAY BACK <br /> 1 A <br /> 2. PROVIDE NEW GROUNDING TO EXISTING SYSTEM SUCH THAT THE ABOVE ON PLANS. POWER RISER DIAGRAM TO THE SERVICE GROUNDING. ■ <br /> REQUIREMENTS ARE MET. Q <br /> N.T.S. <br /> CO <br /> CO <br /> V) <br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC. <br /> JESCALONA F:\-PEDRO+MCGRACKEN\-RASING CANES\424-1497 MANTECA, CA\DWG\E31AP4.DWG 07-30-2020 13:42 <br />