|
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Indoor LightingIndoor Lighting Indoor Lighting Ackk
<br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION moi/ NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION 10 NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION JMJEqW
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E
<br /> This document is used to demonstrate compliance with requirements in§110.9,§110.12(c),§130.0,§130.1,§140.6,and§141.0(b)2 for indoor lighting scopes using the Project Name: Raising Cane's Manteca,CA Report Page: Page 2 of 7 Project Name: Raising Cane's Manteca,CA Report Page: Page 3 of 7
<br /> prescriptive path. Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 IDate Prepared: 07/30/2020 Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 IDate Prepared: 07/30/2020
<br /> Project Name: Raising Cane's Manteca,CAReport Page: Page 1 of 7 -- H
<br /> Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 Date Prepared: 07/30/2020 Rated Power Reduction Compliance(See Table Q for Details) Not Applicable71 01 02 03 04 05 06 07 08 09 10 = lig
<br /> Name or Modular Small Aperture Watts per How Wattage is Total number Exempt per Field Inspector �e� � o
<br /> A.GENERAL INFORMATIONItem Ta D.EXCEPTIONAL CONDITIONS Complete Luminaire Description Design Watts 0 0
<br /> Tag (Track)Fixture&Color Change luminaireZ determined luminaires §140.6(a)3 Pass Fail s )
<br /> 01 Project Location(city) Manteca 04 Total Conditioned Floor Area(ft2) 3,455 This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. ti
<br /> 02 Climate Zone 12 05 Total Unconditioned Floor Area(ft2) P LED Tapelight ❑ ❑ 96 Mfr.SpecZ 1 ❑ 96 ❑ ❑ X N
<br /> No exceptional conditions apply to this project. Q/QE Enclosed Gasketed LED ❑ ❑ 27 Mfr.Spec' 7 ❑ 189 ❑ ❑ . ❑
<br /> 03 Occupancy Types Within Project(select all that apply): 06 #of Stories(Habitable Above Grade)
<br /> Total Designed Watts CONDITIONED SPACES: 2,416.16 Q �
<br /> E] Office ❑ Retail ❑ Warehouse ❑ Hotel/Motel ❑ School ❑ Support Areas Q � �
<br /> E.ADDITIONAL REMARKS +
<br /> ❑ Parking Garage ❑ High-Rise Residential ❑ Relocatable ❑ Healthcare ❑✓ Other(write in): Restaurant v cn cz o
<br /> This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. 'FOOTNOTE:Design Watts for small aperture and color changing luminaires which qualify per§140.6(a)4B is adjusted to be 75%of their rated wattage. Table F automatically �"� ) o
<br /> B. PROJECT SCOPE makes this adjustment,the permit applicant should enter full rated wattage in column 05. x n Q m
<br /> Table Instructions:Include any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined inLa
<br /> 'Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per§130.0(c)Wattage used must be the maximum rated for the c°
<br /> §140.6 or§141.0(b)2 for alterations. WARNING:Changing the Calculation Method in this table will result in the deletion of data previously input. If you need to change the luminaire,not the lamp. Er
<br /> m cv
<br /> calculation method,please open a new form or use"Save As". F. INDOOR LIGHTING FIXTURE SCHEDULE o ti
<br /> Scope of Work Conditioned Spaces Unconditioned Spaces c
<br /> Table Instructions:Include all permanent designed lighting and all portable lighting in offices. G.MODULAR LIGHTING SYSTEMS c-0 a;
<br /> 01 02 03 0405 Designed Wattage:Conditioned Spaces This Section Does Not Apply d D
<br /> My Project Consists of(check all that apply): Calculation Method Area(ft2) Calculation Method Area(ft2) 01 02 03 04 05 06 07 08 09 10
<br /> ❑✓ New Lighting System Complete Building 3,455 Complete Luminaire Description Design Watts H.INDOOR LIGHTING CONTROLS(Not Including PAFs)
<br /> Name or Modular Small Aperture Watts per How Wattage is Total number Exempt per Field Inspector
<br /> Item Tag (Track)Fixture&Color Change z luminaire determined luminaires §140.6(a)3 Pass Fail Table Instructions:Please include lighting controls for conditioned and unconditioned spaces in this table. When an option having a is selected,the notes section of this table
<br /> E] Altered Lighting System must be completed. The lighting controls section of the Compliance Summary Table on the first page will show"DOES NOT COMPLY"if the notes are left blank.
<br /> A1/1E 8"LED Cylinder-170OLM ❑ ❑ 15.82 Mfr.SpecZ 13 ❑ 205.66 ❑ ❑ Building Level Controls
<br /> Total Area of Work(ft2) 3,455 C 2"Square LED ❑ ❑ 11.5 Mfr.SpecZ 7 ❑ 80.5 ❑ ❑
<br /> 01 02 03
<br /> D Wall Sconce ❑ ❑ 16 Mfr.SpecZ 3 ❑ 48 ❑ ❑ Mandatory Demand Response Shut-Off Controls Field Inspector Store:
<br /> C.COMPLIANCE RESULTS F/FE 6"LED Down Light-1000LM ❑ ❑ 10.4 Mfr.SpecZ 26 ❑ 270.4 ❑ ❑ §110.12(c) §130.1(c) Pass Fail
<br /> Table Instructions:If any cell on this table says"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. F1/1E 6"Square LED-1000LM ❑ ❑ 12 Mfr.SpecZ 15 ❑ 180 ❑ ❑
<br /> ❑ ❑ Required>10,000 SF Whole Building Timeswitch
<br /> ❑ ❑ 1311 E. YOSEMITE AVE.
<br /> Allowed Lighting Power per§140.6(b)(Watts) Adjusted Lighting Power per§140.6(a)(Watts) Compliance Results F2 4" LED Can Light-600LM 11.2 Mfr.SpecZ
<br /> 8 ❑ 89.6 ❑ ❑ Area Level Controls
<br /> Lighting in 01 02 03 04 05 06 07 08 09 G 4' Square LED-1000LM 12 Mfr.S eCZ 8 96 MANTECA CA 95335
<br /> q ❑ ❑ p ❑ ❑ ❑ 04 05 06 07 08 09 10 11 12 , ,
<br /> conditioned and � L L
<br /> Adjustments H1 Pendant ❑ ❑ 60 Mfr.SpecZ 0 ❑ 0 ❑ ❑ Multi-Level Shut-Off Primar /Sk lit Secondary Interlocked
<br /> unconditioned Area Category y y y
<br /> spaces must not Complete Area Category Additional Tailored > Total PAF Control Total Adjusted J Mini Spotlight LED ❑ ❑ 6 Mfr.SpecZ 3 ❑ 18 ❑ ❑ Area Description Complete Building or Area Category Area Controls Controls Controls Daylighting Daylighting Systems Field Inspector �p� p n{ � . 9-
<br /> p p g g Y p ��r����l 115 ��C��J
<br /> Building §140.6(c)3 = Total Allowed Designed Credits = (Watts) 05 Must be>_08 Primary Function Area §130.1(a) §130.1 b
<br /> be combined for §140.6(c)2 §140.6(c)2G K/KE 4'LED Strip Light ❑ ❑ 33 Mfr.SpecZ 4 ❑ 132 ❑ ❑ �� §130.1(c) §130.1(d) §140.6(d) §140.6(a)1 Pass Fail
<br /> §140.6(c)1 (+) (Watts) (Watts) §140.6(a)2 *Includes 140.6
<br /> compliance per (+) L1/1E 2X4 LED Troffer ❑ ❑ 38 Mfr.SpecZ 13 ❑ 494 ❑ ❑ MManu I N q�to
<br /> §140.6(b)1. ( ) Adjustments Restaurant RBI?1 BCHan86iJddi®g Mani& F DDiYnTeer AytoTimetsft h ldolddddd lhr) Jdddd ❑✓ ❑ ❑ Professional of Record: NAME
<br /> (See Table I) (See Table I) (See Table J) (See Table K) (See Table F) (See Table P) L2/2E 2X4 LED Troffer ❑ ❑ 46 Mfr.SpecZ 9 ❑ 414 ❑ ❑ Imeswl c
<br /> Conditioned: 2,418.5 = 2,418.5 >_ 2,416.16 = 2,416.16 COMPLIES M Under Cabinet Light ❑ ❑ 10 Mfr.SpecZ 1 ❑ 10 ❑ ❑
<br /> Unconditioned: 4- _ >_ = N 2X2 LED Troffer ❑ ❑ 31 Mf,.SpecZ 3 ❑ 93 ❑ ❑
<br /> Controls Compliance(See Table H for Details) COMPLIES
<br /> Table Continued
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Indoor Lighting ; . Indoor Lighting Indoor Lighting ROBISON
<br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION � �` NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSIONAMU NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E CERTIFICATE OF COMPLIANCE NRCC-LTI-E
<br /> Project Name: Raising Cane's Manteca,CA Report Page: Page 4 of 7 Project Name: Raising Cane's Manteca,CA Report Page: Page 5 of 7 Project Name: Raising Cane's Manteca,CA Report Page: Page 6 of 7 ENGINEERING, ING
<br /> Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 Date Prepared: 07/30/2020 Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 Date Prepared: 07/30/2020 Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 Date Prepared: 07/30/2020 19401 40TH AVE W.,SUITE 302
<br /> LYNNWOOD,WA 98036
<br /> * * 13 O.ADDITIONAL LIGHTING ALLOWANCE:TAILORED VERY VALUABLE MERCHANDISE U. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE 206.364.3343 TEL
<br /> NOTES:Controls with a require a note in the space below explaining how compliance is achieved.
<br /> EX:Conference 1:Primary/Skylight Daylighting:Exempt because less than 120 watts of general lighting, Plan Sheet Showing Daylit Zones: This Section Does Not Apply Table Instructions:Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in
<br /> EXCEPTION 1 to§130.1(d)2 Table E.Additional Remarks. These documents must be provided to the building inspector during construction and an with "-A"in theform name must be completed through an REI# 424-1497
<br /> E2.2 p 9 p 9 Y f p 9
<br /> P. POWER ADJUSTMENT: LIGHTING CONTROL CREDIT(POWER ADJUSTMENT FACTOR(PAF)) Acceptance Test Technician Certification Provider(ATTCP).For more information visit:http://www.energy.cc.gov/title24/attcp/providers.html
<br /> This Section Does Not Apply Field Inspector
<br /> I. LIGHTING POWER ALLOWANCE:COMPLETE BUILDING OR AREA CATEGORY METHODS YES NO Form/Title
<br /> Table Instructions:Complete the table for each area complying using the Complete Building or Area Category Methods per§140.6(b). Indicate if additional lighting power Q.RATED POWER REDUCTION COMPLIANCE FOR ALTERATIONS Pass Fail
<br /> allowances per 140.6 c or adjustments er 140.6 a are bein used. (� NRCA-LTI-02-A-Must be submitted for occupancy sensors and automatic time switch controls. ❑ ❑
<br /> p § ( ) 1 P § ( ) 9 This Section Does Not Apply
<br /> Conditioned Spaces NRCA-LTI-03-A-Must be submitted for automatic daylight controls. ❑ ❑ ROFESS/0
<br /> 01 02 03 04 05 06 R.80%LIGHTING POWER FOR ALTERATIONS-CONTROLS EXCEPTIONS NRCA-LTI-04-A-Must be submitted for demand responsive lighting controls. ❑ ❑ Q Q A Y Nq�
<br /> Complete Building or Area Category
<br /> Allowed Area Allowed Additional Allowances/ This Section Does Not Apply Q (_9 NRCA-LTI-05-A-Must be submitted for institutional tuning power adjustment factor(PAF). ❑ ❑ ��� �S e'9ip F2
<br /> Area Description Density Wattage Adjustment (� (i NRCA ENV 03 F-Must be submitted for da II htin desi n ower ad adjustment factors PAF ❑ ❑ 7
<br /> Primary Function Area (ft2 claylighting g g p J ( ). Z
<br /> (W/ft2) (Watts) Area Category PAF S.DAYLIGHT DESIGN POWER ADJUSTMENT FACTOR(PAF) o. E-23059 m
<br /> Restaurant Restaurant Building 0.7 3,455 2,418.5 ❑ ❑ This Section Does Not Apply
<br /> 3- 1-22
<br /> TOTAL: 3,455 2,418.5 See Tables J or P for detail
<br /> T. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION
<br /> Table Instructions:Selections have been made based on information provided in previous tables of this document.If any selection needs to be changed,please explain why in qTF FC CAL�Fp�
<br /> J.ADDITIONAL LIGHTING ALLOWANCE:AREA CATEGORY METHOD QUALIFYING LIGHTING SYSTEM Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at https://ww2.energy.ca.gov/title24/
<br /> This Section Does Not Apply 2019standards/2019 compliance documents/Nonresidential Documents/NR
<br /> Field Inspector
<br /> K.TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE YES NO Form/Title
<br /> Pass Fail 08/07/20
<br /> This Section Does Not Apply
<br /> (� (� NRCI-LTI-01-E-Must be submitted for all buildings ❑ ❑
<br /> L.ADDITIONAL LIGHTING ALLOWANCE:TAILORED WALL DISPLAY NRCI-LTI-02-E-Must be submitted for a lighting control system,or for an Energy Management Control System(EMCS),to be Prototype: P4 EXTENDED- HV. SCHEME A
<br /> This Section Does Not Apply recognized for compliance. 171 71
<br /> NRCI-LTI-04-E-Must be submitted for two interlocked systems serving an auditorium,a convention center,a conference room, Prototype Issue Date: 6.29.2020
<br /> 1:1 1:1M.ADDITIONAL LIGHTING ALLOWANCE:TAILORED FLOOR AND TASK LIGHTING a multipurpose room,or a theater to be recognized for compliance. Design Bulletin Updates: INCLUDED
<br /> This Section Does Not Apply C' (9- NRCI-LTI-05-E-Must be submitted for a Power Adjustment Factor(PAF)to be recognized for compliance. ❑ ❑
<br /> Date Issued: Bulletin Number:
<br /> NRCI-LTI-06-E-Must be submitted for additional wattage installed in a video conferencing studio to be recognized for
<br /> N.ADDITIONAL LIGHTING ALLOWANCE:TAILORED ORNAMENTAL/SPECIAL EFFECTS compliance. 171 1-1 NOV. 2018 1 & 2
<br /> This Section Does Not Apply
<br /> 1St Building Submittal
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020
<br /> STATE OF CALIFORNIA
<br /> Indoor Lighting
<br /> NRCC-LTI-E(Created 01/20) CALIFORNIA ENERGY COMMISSION `
<br /> CERTIFICATE OF COMPLIANCE NRCC-LTI-E
<br /> Project Name: Raising Cane's Manteca,CA IReport Page: Page 7 of 7
<br /> Project Address: 1311 Yosemite Avenue,Manteca,CA 95336 IDate Prepared: 07/30/2020 REVISIONS:
<br /> DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br /> 1 08-07-20 1st. Bldg. Submittal
<br /> I certify that this Certificate of Compliance documentation is accurate and complete 2
<br /> Documentation Author Name: James A.Ybarra,P.E. Documentation Author Signature: 4
<br /> 4
<br /> Company: Robison Engineering,Inc. Signature Date: 07/30/2 5
<br /> Address: 1940140th Ave W Suite 302 CEA/HERS Certification Identification(if applicable): 6
<br /> City/State/Zip: Lynnwood,WA 98036 Phone: 206 364 3343 7
<br /> RESPONSIBLE PERSON'S DECLARATION STATEMENT 8
<br /> 1 certify the following under penalty of perjury,under the laws of the State of California: 9
<br /> 1. The information provided on this Certificate of Compliance is true and correct.
<br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of
<br /> Compliance(responsible designer)
<br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this
<br /> Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Regulations. Sheet Title:
<br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable ENERGY C 0 D E
<br /> compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br /> S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available
<br /> to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the COMPLIANCE FORMS
<br /> documentation the builder provides to the building owner at occupancy.
<br /> Responsible Designer Name: James A.Ybarra,P.E. Responsible Designer Signature:
<br /> Date: 08.07 2020
<br /> Company: Robison Engineering,Inc. Date Signed: 07/30 20
<br /> Address: 1940140th Ave W Suite 302 License: E-23059 Project Number: RAC19024.0
<br /> City/State/Zip: Lynnwood,WA 98036 Phone: 206 364 3343
<br /> Drawn By: X)0(/XXX
<br /> Sheet Number:
<br /> E4 . 3A
<br /> Q
<br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020
<br /> m
<br /> COPYRIGHT 2020, ROBISON ENGINEERING, INC.
<br /> JESCALONA F.\-PEDRO+MGCRACKEN\-RAISING CANES\424-1497 MANTECA, CA\DWG\E43AP4.DWG 07-31-2020 11:25
<br />
|