Laserfiche WebLink
FIRE DEPT. NOTES BID NOTES GENERAL PROJECT NOTES <br /> H <br /> 1. FIRE HYDRANT AND UNDERGROUND WATER SUPPLY LINES: WHEN REQUIRED, SUBMIT 1. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OF PLANS 1. ALL WORK AND MATERIALS SHALL BE IN COMPLIANCE WITH 12. THE INTENT OF DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL 94 T <br /> 0 <br /> ENGINEERED PLANS COMPANY. CONTACTTTOCITY OF CALI CALIFOTECA AND RNIA ER SERVICESORNIA CO PANYEWATERER R RESOURCES CES FOR BID PURPOSES PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. APPLIREGULAABLE FEDERAL, STATE TIONS,TIIONS, ORD NANCES ANDD LOCAL STANDARDSLDING INCLUDING ADA AND OFBALL WORK( SHOWN, DESCRIBCES NECESSARY FOR THE ED, OR REASONABLY IMPLIED, BUTTON DIMENSION NOTES. x <br /> AT (661) 326-3000 FOR THE UNDERGROUND WATER SYSTEM INSPECTIONS. NOTE: 2. THE INTENT OF THESE DOCUMENTS IS TO INCLUDE ALL LABORS, MATERIALS AND OR OTHER ACCESSIBILITY CODES. NOT LIMITED TO THAT EXPLICITLY INDICATED IN THE CONTRACT 1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS w U � N <br /> DO NOT START BUILDING CONSTRUCTION UNTIL INSPECTED. EQUIPMENT, AND TRANSPORTATION NECESSARY FOR COMPLETE AND PROPER DOCUMENTS. o ti <br /> EXECUTION OF THE WORK. 2. THE CONSTRUCTION DRAWINGS INCLUDING SPECIFICATIONS, ADDENDA, SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF STUD xo rn <br /> OR CENTERLINE OF GRIDS. o C x <br /> 2. FIRE SPRINKLERS: PROVIDE AN APPROVED AUTOMATIC FIRE SPRINKLER SYSTEM IN BULLETINS, ETC., ARE PROVIDED TO ILLUSTRATE THE DESIGN AND 13. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN W Q E <br /> ACCORDANCE WITH NFPA 13. PLANS FOR THE INSTALLATION OR MODIFICATION OF 3. AN GENERAL CONTRACTOR AND HIS SUB-CONTRACTORS SHALL THOROUGHLY GENERAL TYPE OF CONSTRUCTION DESIRED AND ARE INTENDED TO STRICT ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, 2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, UNLESS OTHERWISE v coo <br /> THE SPRINKLER SYSTEM SHALL BE TO SCALE USING CORRECT SYMBOLS. PLANS FAMILIARIZE THEMSELVES WITH THESE CONTRACT DOCUMENTS AND SHALL VERIFY IMPLY THE FINEST QUALITY OF CONSTRUCTION MATERIAL AND UNLESS NOTED OTHERWISE. NOTED. "" o 0 <br /> SHALL INCLUDE OCCUPANCY CLASS OF EACH AREA WITHIN THE BUILDING, THE EXISTING SITE AND CONDITIONS PRIOR TO SUBMITTING A BID. ALL WORKMANSHIP THROUGHOUT. ''�. I <br /> LOCATION AND SIZE OF CONCEALED SPACES, CLOSETS AND BATHROOMS. PLANS SUB-CONTRACTORS SHALL PROVIDE ALL LABOR, SUPERVISION, AND MATERIALS OF 14. ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION 3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED O �, <br /> SHALL BE SUBMITTED FOR APPROVAL TO THE MANTECA FIRE DEPARTMENT PRIOR EVERY TYPE WHICH MAY BE NECESSARY FOR A SUCCESSFUL COMPLETION OF ALL 3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF DRAWINGS, WITHOUT THE PRIOR APPROVAL OF THE OWNER AND THE FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER m N <br /> TO INSTALLATION. 2016 CFC 903 WORK TO BE PERFORMED IN A GOOD AND WORKMANLIKE MANNER ACCORDING TO WITH THE EXISTING CONDITIONS AND REVIEW AND UNDERSTAND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. SMALLER SCALE DRAWINGS. DO NOT SCALE DRAWINGS. o ~ <br /> THE TRUE INTENT AND MEANING OF DRAWINGS AND SPECIFICATIONS. REQUIREMENTS OF THE CONTRACT DOCUMENTS. CONTRACTOR � 6' <br /> 3. FIRE ALARM: PROVIDE A DRAWING WITH A SCOPE OF WORK FOR THE ENTIRE SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS PRIOR 15. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT 4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO o <br /> BUILDING. DRAWINGS SHALL BE TO SCALE USING CORRECT SYMBOLS AS 4. THIS ARCHITECT AND HIS PROFESSIONAL CONSULTANTS WILL NOT HAVE CONTROL TO BEGINNING ANY WORK AND SHALL NOTIFY THE ARCHITECT OF IMMEDIATELY OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ACCURATELY LOCATE FINISHES IN THE SAME PLANE. <br /> ADDRESSED IN NFPA 170. PLANS SHALL PROVIDE ELECTRICAL CALCULATIONS. A OF AND WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, ANY DISCREPANCIES. DO NOT SCALE DRAWINGS, CONTRACTOR ARE EITHER UNAVAILABLE OR THAT WILL CAUSE A DELAY IN THE <br /> PRETEST FORM SHALL BE COMPLETED AND DELIVERED TO THE INSPECTOR PRIOR TECHNIQUES, SEQUENCES, PROCEDURES, OR SAFETY PRECAUTIONS AND PROGRAMS SHALL BE RESPONSIBLE FOR ALL CORRECTIONS AND REPAIRS CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR SHALL 5. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS <br /> TO FINAL ACCEPTANCE TEST AS PER NFPA 72 2016 EDITION. IN CONNECTION WITH THE WORK ON THIS PROJECT OR FOR ACTS OR OMISSIONS OF REQUIRED DUE TO HIS FAILURE TO DO SO. SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, <br /> THE CONTRACTOR, SUB-CONTRACTOR, OR ANY OTHER PERSONS PERFORMING ANY MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES. <br /> 4. COMMERCIAL FIRE EXTINGUISHING SYSTEM: PROVIDE PLANS WHICH SHALL INCLUDE OF THE WORK ON THIS SITE, NOR FOR THE FAILURE OF ANY OF THEM TO CARRY 4. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY UNLESS NOTED OTHERWISE. <br /> DETAILED DRAWINGS THAT INCLUDE: THE FLOOR PLAN OF THE KITCHEN, HOOD, OUT THE WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT AND FOR JOB SITE CONDITIONS AND COMPLY WITH SAFETY REGULATIONS 16. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE » <br /> REMOTE PULL STATION, GAS VALVE, SYSTEM TANK(S) LOCATIONS, ALL APPLIANCES, CONSTRUCTION DOCUMENTS. AND RESTRICTIONS AS REQUIRED FOR WORKERS AND PEDESTRIAN SUBMITTED IN WRITING AND WILL BE CONSIDERED ONLY IF BETTER 6. DETAILS ARE USUALLY KEYED AND NOTED TYPICAL ONLY ONCE, WHEN THEY <br /> NOZZLE AN FUSIBLE LINK LOCATION AND HEIGHT AND FLOW POINT CALCULATIONS. PROTECTION DURING THE COURSE OF CONSTRUCTION ON THIS SERVICE FACILITIES, A MORE ADVANTAGEOUS DELIVERY DATE, OR A FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS Store: <br /> PLANS SHALL BE SUBMITTED TO THE BAKERSFIELD FIRE DEPARTMENT AND OBTAIN 5. CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND/OR SHORING TO INSURE PROJECT. PROVIDE PROTECTION AS REQUIRED TO PREVENT ANY LOWER PRICE WITH CREDIT TO THE OWNER / TENANT WILL BE THROUGHOUT, UNLESS NOTED OTHERWISE. 1311 E. YOSEMITE AVE. <br /> APPROVAL PRIOR TO INSTALLATION. 2016 CFC 904.11; NFPA 17A 2009 EDITION & STRUCTURAL STABILITY OF THE BUILDING AND ALL RELATED COMPONENTS IE: DAMAGE TO EXISTING CONSTRUCTION WITHIN AND ADJACENT TO JOB PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, AND <br /> NFPA 96. STRUCTURAL WALLS, INTERIOR WALL ASSEMBLIES, ETC. DURING THE CONSTRUCTION SITE. WHERE DAMAGE OCCURS, THE CONTRACTOR SHALL REPAIR OR FUNCTION. UNDER NO CIRCUMSTANCES WILL THE ARCHITECT BE 7. COLUMN CENTERLINES (GRID LINES) ARE SHOWN FOR DIMENSIONING PURPOSES.PHASE OF THIS PROJECT. REPLACE DAMAGED AREA AND/OR MATERIAL AS REQUIRED TO THE REQUIRED TO PROVE THAT A PRODUCT PROPOSED FOR MANTECA, CA 95336 <br /> 5. BUILDING ADDRESS: NEW AND EXISTING BUILDINGS SHALL HAVE APPROVED OWNERS APPROVAL AT NO ADDITIONAL COST. THIS REQUIREMENT SUBSTITUTION IS OR IS NOT OF EQUAL QUALITY TO THE PRODUCT INTERIOR / EXTERIOR NOTES. <br /> ADDRESS AND/OR BUILDING NUMBERS THAT ARE PLAINLY LEGIBLE AND VISIBLE 6. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL WORK WITH ALL SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL SPECIFIED. Restaurant #RC529 <br /> FROM THE STREET FRONTING THE PROPERTY. THESE BUILDING NUMBERS SHALL BE TRADES IN ORDER TO AVOID INTERFERENCE AND OMISSIONS. WORKING HOURS. <br /> OF CONTRASTING COLORS WITH A MINIMUM SIZE OF 4 INCHES. 2016 CRC 505. 17. PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS 1. WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS, <br /> 7. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT IN 5. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND - SUBSTITUTIONS FOR SPECIFIED MATERIALS REQUIRE THE WRITTEN DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS, Professional of Record: NAME <br /> 6. KEY BOXES: A KEY BOX IS REQUIRED FOR THE USE OF EMERGENCY RESPONDERS WRITING OF ANY CONFLICTS, ERRORS, AMBIGUITIES, OR DISCREPANCIES THAT THE SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, APPROVAL FROM THE ARCHITECT. SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS <br /> AFTER CLOSING HOURS. CONTACT THE MANTECA FIRE DEPARTMENT FOR CONTRACTOR HAS DISCOVERED IN THE CONTRACT DOCUMENTS OR SITE CONDITIONS. TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE <br /> REQUIREMENTS. 2016 CFC 506. THE ARCHITECT WILL ISSUE A WRITTEN RESPONSE. PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, ALL 18. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS, THE FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS <br /> OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR SHALL SUBMIT ONE (1) SET OF SHOP DRAWINGS. WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF <br /> 7. FIRE EXTINGUISHERS: MINIMUM OF 2-A:10-B:C FIRE EXTINGUISHERS SHALL BE 8. GENERAL CONTRACTOR SHALL AMEND AND MAKE GOOD AT HIS OWN COST ANY CONTRACTOR. SHOP DRAWINGS SHOULD INCLUDE DETAILED, FABRICATION AND STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR FvAA <br /> INSTALLED PER TITLE 19. THE MINIMUM DISTANCE FOR FIRE EXTINGUISHER DEFECTS OR OTHER FAULTS IN HIS SUB-CONTRACTOR WORKMANSHIP AND/OR ERECTION DRAWINGS, SETTING DRAWINGS, DIAGRAMMATIC DRAWINGS, DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE <br /> PLACEMENT IS SEVENTY-FIVE (75) FEET TRAVEL DISTANCE FROM ANY POINT IN SUPPLIED MATERIALS. 6. THE DESIGN ADEQUACY, AND SAFETY OF ERECTION BRACING, AND MATERIAL SCHEDULES. LOCATION AND ORIENTATION OF ALL ARCHITECT'S ATTENTION FOR CLARIFICATION. DESIGN <br /> THE BUILDING OR AS DETERMINED BY THE FIRE DEPARTMENT INSPECTOR. 2016 CFC SHORING, TEMPORARY SUPPORTS, ETC. DURING DEMOLITION AND/OR ITEMS SHOULD BE CLEARLY INDICATED. BEGIN FABRICATION OF <br /> 906.3 9. EACH BIDDER REPRESENTS THAT HE HAS VISITED THE SITE, PERFORMED CONSTRUCTION IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR, SHOP ITEMS AFTER RECEIVING ARCHITECT'S OR DESIGNER'S 2. CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND <br /> INVESTIGATIONS AND VERIFICATIONS AS HE DEEMS NECESSARY AND FAMILIARIZE AND HAS NOT BEEN CONSIDERED BY THE STRUCTURAL ENGINEER APPROVAL OF SHOP DRAWINGS. LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED A r c h i t e c t u r a <br /> 8. INSPECTIONS: CONTACT THE FIRE PREVENTION SERVICES OFFICE FOR INSPECTIONS HIMSELF WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE OR ARCHITECT. TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL Solutions Gro u <br /> AT (209) 456-8300. A MINIMUM OF 48 HOURS ADVANCED NOTICE IS REQUIRED. PERFORMED AND WILL BE RESPONSIBLE FOR ANY AND ALL ERRORS IN HIS 19. THE ARCHITECT'S REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL p <br /> 38 EXECUTIVE PARK, <br /> PROPOSAL RESULTING FROM HIS FAILURE TO DO SO. 7. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE THE GENERAL CONTRACTOR OR SUBCONTRACTOR FROM LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. <br /> 9. NO SMOKING SIGNS ARE REQUIRED PER CALIFORNIA STATE LABOR CODE SECTION ACCOMPLISHED BY A CONTRACTOR OTHER THAN THE GENERAL RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS OR SUITE 310 <br /> IRVINE, CA 92614 <br /> 6404.5 10. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION. CONTRACTOR AND IS NOT TO BE PART OF THE CONSTRUCTION <br /> SPECIFICATIONS UNLESS HE HAS, IN WRITING, AND BROUGHT TO THE 3. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN CONTACT: JEFF LIEDERMAN <br /> AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ATTENTION OF THE ARCHITECT SUCH DEVIATIONS AT THE TIME OF RATING. <br /> 10. THE FIRE SPRINKLER SYSTEM SHALL BE MONITORED BY AN APPROVED CENTRAL 11. BID SHALL INCLUDE ALL MATERIALS, PRODUCTS, ETC. INDICATED IN THESE "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY OWNER THE SUBMISSION, NOR SHALL IT RELIEVE HIM GENERAL (949) 4 <br /> CONTRACT DOCUMENTS. SUBSTITUTIONS OF ANY MATERIAL, PRODUCT, ETC. IS NOT ( JLIEDERMAN@PMDGI1 <br /> DGINC.COM <br /> STATION, REMOTE STATION, OR PROPRIETARY SUPERVISING STATION IN ALL ACCEPTABLE WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT AND COULD BE AND TENANT. CONTRACTOR) FROM RESPONSIBILITY FOR ERRORS OF ANY SORT IN <br /> OCCUPANCIES NOT NORMALLY OCCUPIED 24-HOURS A DAY, OR PROVIDED WITH SUBJECTTO BID DISQUALIFICATION. REFER TO SPECIFICATIONS FOR SUBSTITUTION THE SHOP DRAWINGS. 4. INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & <br /> 24-HOUR GUARD SERVICE. CFC 903.4 8. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE <br /> PROCEDURE. RESPONSIBLE FOR EXAMINING CONTRACT DOCUMENTS, FIELD 20. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING DENSITY RATINGS FOR FINISH MATERIALS. <br /> 11. EVERY ROOM OR SPACE THAT IS AN ASSEMBLY OCCUPANCY SHALL HAVE THE CONDITIONS, AND CONFIRMING THAT WORK IS BUILDABLE AS SHOWN ALL REQUIRED BUILDING PERMITS PRIOR TO STARTING <br /> OCCUPANT LOAD OF THE ROOM OR SPACE POSTED IN A CONSPICUOUS PLACE, 12. IN ORDER TO INSTALL SOME OF THE NEW WORK (INCLUDING, BUT NOT LIMITED TO BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY CONSTRUCTION. 5. WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION <br /> NEAR THE MAIN THE EXIT ACCESS DOORWAY FROM THE ROOM OF SPACE. POSTED MECHANICAL, PLUMBING OR ELECTRICAL) IT WILL BE NECESSARY FOR THE QUESTIONS REGARDING THESE OR OTHER COORDINATION ITEMS, THE BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE <br /> SIGNS SHALL BE OF AN APPROVED LEGIBLE PERMANENT DESIGN AND SHALL BE CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE (OR REFINISH) CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM 21. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT OZONE DEPLETING COMPOUNDS. <br /> MAINTAINED BY THE OWNER OR AUTHORIZED AGENT. CFC, CHAPTER 10. EXISTING WALLS, FLOORS, OR CEILING IN THE AREAS OF THE BUILDING NOT SHOWN THE ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTION OR SHALL HAVE EVIDENCE OF CURRENT WORKMAN'S COMPENSATION <br /> ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED COST IN HIS RELATED WORK. INSURANCE COVERAGE ON 6. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS-FREE. <br /> 12. MEANS OF EGRESS ILLUMINATION SHALL COMPLY IN ACCORDANCE WITH CFC BASE BID, WHETHER SHOWN ON THE PLANS OR NOT. FILE WITH THE STATE LABOR DEPARTMENT IN COMPLIANCE WITH <br /> SECTION 1008. 9. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CURRENT LABOR CODES. 7. ALL JOINTS, PENETRATIONS AND OTHER OPENINGS IN THE BUILDING ENVELOPE <br /> 13. EXISTING CONCEALED CONDITIONS AND CONNECTIONS OF BLDG. COMPONENTS ARE CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL SHALL BE SEALED TO LIMIT INFILTRATION AND EXFILTRATION RC T <br /> 13. INTERIOR FINISHES AND COMBUSTIBLE DECORATIVE MATERIALS SHALL COMPLY WITH BASED ON INFORMATION TAKEN FROM LIMITED FIELD INVESTIGATIONS WHICH HAVE PROVIDE SAID DOCUMENTATION TO THE ARCHITECT & OWNER UPON 22• PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN STATE AND <br /> CFC 801. NOT BEEN VISUALLY VERIFIED AND MAY NOT BE INDICATED IN THESE DOCUMENTS. COMPLETION OF CONSTRUCTION - NO EXCEPTION ALLOWED. LOCAL CODES AND PER CONTRACT DOCUMENTS AS NEEDED. JOB SITE NOTES. ��ERMPN <br /> CONTRACTOR SHALL INCLUDE IN BID ALLOWANCE TO MAKE REQUIRED ADJUSTMENTS <br /> 14. THE STORAGE, USE AND DISPENSING OF HAZARDOUS MATERIALS SHALL NOT TO BLDG. COMPONENTS AS NECESSITATED FROM EXISTING CONCEALED CONDITIONS 10. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO9534 <br /> 23. PRIOR TO THE ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY C-Z <br /> EXCEED THE MAXIMUM ALLOWABLE QUANTITIES AS SET FORTH IN TABLES 307.1(1) AND CONNECTIONS. COORDINATE WITH ALL SUBCONTRACTORS PER REQUIREMENTS FOR THIS PROJECT, THE GENERAL CONTRACTOR SHALL SUBMIT A 1. WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT, <br /> AND (2) OF THE CBC. ESTABLISHED BY OWNER, TENANT, OR BOTH, WHICH ARE UNDER 3p <br /> SIGNED CERTIFICATE TO THE DEPARTMENT OF BUILDING AND SAFETY THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREME NOISE pR• oA _ <br /> SEPARATE CONTRACT WITH THE OWNER, OR TENANT, OR BOTH. STATING THAT ALL WORK HAS BEEN PERFORMED AND MATERIALS CONSTRUCTION SHALL OCCUR AT NON-TYPICAL BUSINESS HOURS. CONTRACTOR PRENEWP� <br /> 15. THE STORAGE, USE OR DISPENSING OF HAZARDOUS MATERIALS, AS DEFINED BY INSTALLED ACCORDING TO THE PLANS AND SPECIFICATIONS SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN 9TF OF pP�\ <br /> THE FIRE CODE, SHALL COMPLY WITH CFC CHAPTER 50. 11. THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, OTHER AFFECTING NON-RESIDENTIAL ENERGY. ADVANCE PRIOR TO WORK. <br /> DRAWINGS, AND JOB SPECIFICATIONS ARE SUPPLEMENTARY TO <br /> 16. THE BEVERAGE DISPENSING SYSTEM SHALL COMPLY WITH CFC SECTION 5307, 2016 ARCHITECTURAL CONSTRUCTION DRAWINGS. ANY DISCREPANCY 2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND Prototype : P4 EXTENDED- HV, SCHEME A <br /> EDITION. BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN <br /> THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND Prototype Issue Date: 6.29.2020 <br /> 17. THE MEANS OF EGRESS ILLUMINATION INCLUDING THE EXIT DISCHARGE SHALL BE REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. <br /> ILLUMINATED AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF Design Bulletin Updates: INCLUDED <br /> EGRESS IS OCCUPIED. CFC, CHAPTER 10 AND CBC CHAPTER 10. 3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE <br /> Date Issued: Bulletin Number: <br /> SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE <br /> 18. SMOKE DETECTION FOR THE DUCT SYSTEM WHERE REQUIRED BY THE MECHANICAL LOCATION OF DISPOSAL SITES. NOV. 2018 1 & 2 <br /> CODE SHALL BE DESIGNED AND INSTALLED PER THE REQUIREMENTS SET FORTH IN <br /> NFPA 72. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB <br /> AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT 1ST BLDG. SUBMITTAL <br /> 19. WHERE IN DUCT SMOKE DETECTORS ARE INSTALLED MORE THAN 10 FEET ABOVE NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE <br /> THE FINISHED FLOOR OR IN ARRAGEMENTS WHERE THE DETECTOR'S ALARM OR PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND <br /> SUPERVISORY INDICATOR IS NOT VISIBLE TO RESPONDING PERSONNEL, THE CORRIDOR CARPETS. <br /> DETECTORS SHALL BE PROVIDED WITH REMOTE ALARM OR SUPERVISORY INDICATION <br /> IN A LOCATION ACCEPTABLE TO THE AHJ. PER NFPA 72. 5. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED <br /> PER STATE AND LOCAL CODES. <br /> 6. IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN <br /> ISSUANCE OF A BUILDING OR GRADING PERMIT. <br /> 7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING <br /> WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & REVISIONS: <br /> COUNTY REQUIREMENTS. QUANTITIES SHALL NOT EXCEED TABLE 307.1 (1 & 2) 1 08-07-20 1st. Bldg. Submittal <br /> CBC 2016 2 <br /> 8. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN 3 <br /> AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING 4 <br /> AIR DISTRIBUTION SYSTEMS. 5 <br /> 9. BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE 6 <br /> DONE SO IN ACCORDANCE WITH STATE & LOCAL CODES. 7 <br /> 8 <br /> 9 <br /> Sheet Title: <br /> GENERAL, BID & <br /> FIRE DEPT. NOTES <br /> Date: 08.07.2020 <br /> Project Number: RAC19024.0 <br /> Drawn By: XXX/XXX <br /> Sheet Number: <br /> GN1 . 0N <br /> J <br /> Q <br /> H <br /> H <br /> L <br /> Co <br /> V)V) <br />