<br /> 47)All improvements shall comply with the City of Manteca Standard Plans and 53)Joint trench utility installation shall be in accordance with Manteca Municipal Code 70) Existing service connections to the City's water mains which will not be used by this W o
<br /> Specifications. Improvement plans shall be submitted to the City Engineer for approval. Chapter 13.34 and City Standards. project shall be abandoned, as directed by the City of Manteca. ` x o
<br /> An encroachment permit is required for all work within the public right-of-way. 54)All address numbers shall be plainly visible from the street fronting the property. Said Storm Drainage wLO
<br /> L
<br /> CZ
<br /> numbers/letters shall contrast with background. o ti
<br /> 48) Developer shall provide easements, requested by the respective utility companies. Any 71) Improvements shall be constructed in conformance with the latest edition of the Storm
<br /> CZ
<br /> existing facilities within or adjacent to the Project that are affected by this Project shall be 55)Applicant shall grant reciprocal access to the adjacent properties, across the southern Drain Master Plan and City Standards. W Q E
<br /> relocated or laced underground at the Developer's expense. drive aisle. This shall be recorded and the recorded document shall be submitted to the �C Q "
<br /> p g p p Cit Engineer as a condition of the final inspection of the restaurant building. 72)Storm drain flows that leave this project site shall be directed to the existing storm drain v cn o 0
<br /> 49) Developer shall dedicate ten-foot (10') wide public utility easements on all street y g p g storage system north of this parcel. Connection to the existing system shall be the sole X Q m
<br /> Site responsibility of the developer. o M
<br /> frontages for underground facilities and appurtenances. O
<br /> 56)On-site parking area pavement surface drainage slope shall be as follows: Minimum 73)A preliminary storm drainage plan shall be submitted to the City Engineer for approval m N
<br /> 50) During all construction phases, Developer shall comply with City Laws regarding dust cross-slope on asphalt concrete is 2% or concrete is 1 % with a maximum of 5%. prior to final improvement plan submittal. The plan shall be accompanied by calculations o rn
<br /> control. Developer shall also comply with San Joaquin Valley Unified Air Pollution Concrete valley or curb gutters shall have a minimum slope of 0.25%. The pavement for peak flows, total runoff, pipe sizes, detention basin volume and evidence ofco
<br /> Control District Regulation VIII (Fugitive Dust Prohibitions) in an effort to reduce the slope in ADA areas shall be 1.5% minimum to 2% maximum. groundwater depth.
<br /> amount of fine particulate matter (PM10) entrained into the ambient air from man-made 57) Provide City Standard Refuse/Recycling Enclosures on-site at the locations shown on 74)All drain inlets shall be marked "No Dumping - Drains to River". Drain markers shall be
<br /> sources. the site plan, in accordance with City Standards. purchased from the City of Manteca at cost plus 15% administrative charge, and
<br /> 51)Prior to the start of construction, all survey monuments that have the possibility of being 58)On-site curbing shall conform to City of Manteca Standard ST-35, "Parking Area Curbs". installed by the Developer prior to acceptance of the improvements.
<br /> damaged, destroyed or covered over during the course of construction for this project, 59) Developer shall ensure no buildings are constructed across property lines. 75) Project applicant shall incorporate appropriate site design measure(s) and submit the
<br /> shall be located and referenced by a licensed land surveyor and a corner record or results of the Post-Construction Runoff Standards Manual. The City of Manteca approval
<br /> record of survey shall be filed with the county surveyor. Survey monuments which are 60) Existing driveways which are not to be used by this project shall be removed and of the proposed measures is precedent to issuance of any building, grading or Store:
<br /> damaged, destroyed or covered over during the course of construction must be re-set at replaced with sidewalk, vertical curb and gutter. construction permits.
<br /> the original location with a new monument and monument box and another corner 61)Applicant shall remove and replace the sidewalk, curb, gutter and accessible ramps, if 76)Project applicant shall develop and submit a Project Stormwater Plan that identifies the 1311 E. YOSEMITE AVE.
<br /> record or record of survey shall be filed with the county surveyor. All work in this any, along the frontage of this project. methods to be employed to reduce or eliminate stormwater pollutant discharges through
<br /> condition shall be done by a licensed land surveyor. 62)Side walk curb and gutter will be inspected prior to final inspection, damages caused the construction, operation and maintenance of source control measures, low impact MANTECA, CA 95336
<br /> due to construction activities will have to be repaired or replaced to the City's
<br /> 52)Prior to or with the Building Permit plan set the following shall be submitted. Review and development design, site design measures, stormwater treatment control measures, and
<br /> approval of these items by the Community Development Department must occur prior to hydromodification control measures. Design and sizing requirements shall comply with Restaurant #R 529
<br /> or with the issuance of the first building permit associated with this project. satisfaction. the 2015 Post- Construction Stormwater Standards Manual. City of Manteca approval of
<br /> 63)A grease interceptor, in accordance with City Standard M-1, shall be installed as part of the Project Stormwater Plan is precedent to issuance of any building, grading, or
<br /> a. On-site grading and drainage plan, the private sanitary sewer system. construction permits. Two paper copies and an electronic copy of the Project Stormwater Professional of Record: NAME
<br /> b. On-site utility (sanitary sewer, water and storm drain) plan, 64) Landscape planting at driveway entrances/exits shall be maintained to a maximum Plan shall be provided to the City of Manteca
<br /> c. Off-site improvement plan, height of three and one-half feet (35). 77) Project applicant shall develop a hydromodification management plan to ensure the
<br /> d. Erosion control plans, 65) Developer shall sign and stripe both sides of the drive aisle as No Parking. post-project stormwater runoff flow rate shall not exceed estimated pre-project flow rate FAR
<br /> for the 2-year, 24-hour storm. The hydromodification management plan shall be
<br /> e. Stormwater Pollution Prevention Plan (SWPPP), and Water incorporated into the Project Stormwater Plan. DESIGN
<br /> f. Documentation, as required in the Post-Construction Stormwater Standards 66) Improvements shall be constructed in conformance with the latest version of the City 78)Project applicant shall develop and submit an Operations and Maintenance Plan that
<br /> Manual, showing compliance with WQO NPDES 2013-0001-DWQ. Water Master Plan. identifies the operations, maintenance, and inspection requirements of all stormwater A r c h i t e c t u r a
<br /> g. Joint Trench Intent plans, and 67)Any existing well(s) on the property, which will not be approved by the City and the State treatment and baseline hydromodification control measures identified in the approved
<br /> Solutions Group
<br /> Department of Health for use of any type shall be abandoned in accordance with San Project Stormwater Plan. City of Manteca approval of the preliminary Operations and p
<br /> h. Dedication of required rights-of-way and easements to the City. Maintenance Plan is precedent to issuance of any building, grading, or construction 38 EXECUTIVE PARK,
<br /> Joaquin County Public Health Services requirements.
<br /> permits. Two paper copies and an electronic copy of the Maintenance Plan shall be SUITE 310
<br /> 68) Fire hydrant locations shall be as approved by the Fire Department. Developer shall provided to the City of Manteca. IRVINE, CA 92614
<br /> The plans specified in (a), (b), (c) and (f) above shall be prepared by a Registered Civil provide and install fire hydrant "blue dot" reflective markers prior to issuance of the first CONTACT: JEFF LIEDERMAN
<br /> Engineer. building permit. 79)City of Manteca approval of the final Operations and Maintenance Plan and recordation (949) 430-7051
<br /> of the Maintenance Access Agreement is precedent to first building final inspection for JLIEDERMAN@PMDGINC.COM
<br /> The plan in (d) and the SWPPP in (e) above shall be prepared by a Qualified SWPPP 69)Water meters for this project shall be placed immediately adjacent to existing City right- this project. Two paper copies and an electronic copy of the final Operations and
<br /> Developer (QSD). of-way. Maintenance Plan shall be provided to the City of Manteca.
<br /> Conditions of Approval Page 7 of 16 Conditions of Approval Page 8 of 16 Conditions of Approval Page 9 of 16
<br /> RC T
<br /> F
<br /> S• cT
<br /> o C,2g534
<br /> � N 0 202
<br /> PPR' WPB°A5�
<br /> Exhibit A Exhibit A Exhibit A 9TF O F 0 Pte\
<br /> SPC 20-14& UPN 20-15 SPC 20-14& UPN 20-15 SPC 20-14&UPN 20-15
<br /> Raising Cane's Restaurant Raising Cane's Restaurant Raising Cane's Restaurant Prototype : P4 EXTENDED- HV, SCHEME A
<br /> May 12, 2020 May 12, 2020 May 12, 2020
<br /> 80) Post-Construction Management Practices shall conform to the City's adopted Multi- Sanitary Sewer Prototype Issue Date: 6.29.2020
<br /> Agency Post Construction Stormwater Standards Manual. 86) Improvements shall be constructed in conformance with the latest version of the City iv. Provide 15 feet of clearance on either side of fire hydrant from stopped or Design Bulletin Updates: INCLUDED
<br /> arked vehicles.
<br /> 81)Where conflict between standards arises, the standard most-protective to water quality, Wastewater Collection System Master Plan and City Standards. pDate Issued: Bulletin Number:
<br /> to public health and safety, and against flooding shall be utilized. 87)A cleanout shall be located at the back of the sidewalk, adjacent to City right-of-way, v. Additional fire hydrants may be required to meet the minimum spacing NOV. 2018 1 & 2
<br /> 82)Prior to any land disturbing construction activities occurring on a project, Developer shall where the sanitary sewer main enters the development. This cleanout shall be the end of requirement of hydrants within 90 feet of Fire Department Connections,
<br /> meet the requirements of NPDES. For sites exceeding 1 acre of disturbance area that the City's maintenance responsibility for the sanitary sewer system. (FDC) for Fire Sprinkler Systems. 1ST BLDG SUBMITTAL
<br /> are deemed non-exempt, contractor shall prepare and submit a Storm Water Pollution 88)Any existing septic tank(s) on the property that will not be approved by the City shall be
<br /> Prevention Plan (SWPPP) and apply for a permit under the California General vi. The on-site fire protection system (fire hydrants and associated water
<br /> abandoned in accordance with the permitting requirements of the San Joaquin County
<br /> Construction NPDES permit. SWPPP shall be prepared and signed by a Qualified Environmental Health Department prior to issuance of the first building permit. mains) shall be installed prior to the issuance of building permits.
<br /> SWPPP Developer (QSD) certified by the State Water Resources Control Board. All
<br /> modifications to SWPPP shall be implemented by a QSD in responsible charge for the 89)The refuse enclosure shall drain to itself and have a connection to the sanitary sewer vii. Total Fire Flow (appendix B of CFC) shall be calculated and submitted as
<br /> project. The SWPPP shall be implemented under the supervision of a Qualified SWPPP system. The enclosures connection to the sanitary sewer system must connect through part of the permit submittal.
<br /> Practitioner (QSP). For permit information, contact the State Water Resources Control an on-site grease interceptor prior to reaching the City's sanitary sewer system.
<br /> Board (SWRCB) at: City of Manteca Parks & Recreation Department (Michael Rosales, Parks Superintendent) 94) Underground piping for the fire sprinkler shall be approved by the Fire Department prior
<br /> State Water Resources Control Board to permit issuance.
<br /> PO Box 1977, Sacramento, CA 95812-1977 90) Existing street trees along Yosemite Avenue shall be protected in place unless removed
<br /> Attn: Storm Water Permitting Section for driveway entrance. Any irrigation alterations shall be coordinated with Parks 95)All above ground gas meter, regulators, and piping exposed to vehicular damage shall REVISIONS:
<br /> Telephone: (916) fitting 37 Department prior to construction. be protected in an approved manner. 1 08-07-20 1st. Bldg. Submittal
<br /> Fire Marshall)
<br /> To log in to the SWRCB Storm Water Multiple Application and Report Tracking System City of Manteca Fire Department (Lantz Rey, 96) Fire Suppression Systems: All buildings must be protected by an approved monitored 23
<br /> (SMARTS) to enter site information and apply for permit, please contact the City of automatic sprinkler system in accordance to NFPA 13, CFC, CBC, and Manteca
<br /> Manteca Public Works Department to establish a project and authorize data entry 91)Site Address: Building address numbers shall be plainly visible from the street fronting Municipal Code Section 15.24. 4
<br /> access. the property. Said building address numbers shall contrast with their background and be i. Fire Alarm/Sprinkler monitoring shall be point ID. 5
<br /> All other sites shall conform to the City of Manteca Standards, the California Green a minimum of 12" in height. 97) Fire Suppression Approval. Plans and specifications for fire suppression systems shall 6
<br /> Building Standards, and Section E.10 of the NPDES permit 2013-0001-DWQ. Allbe submitted for review and approval prior to construction. If work differs from approved 7
<br /> construction involving land disturbing activities shall submit for approval an Erosion
<br /> 92) Fire Department Access: plans, a set of"as built" shall be submitted to the Fire Department prior to final 8
<br /> Control and Sedimentation Plan (ESCP) prepared and signed by a QSD. All ESCPinspection. 9
<br /> i. Provide a diagram showing a minimum of 44' external radius and internal
<br /> treatment measures and BMPs must be maintained at all times until construction is radius of 25' on all main entries, drive aisle and parking lot areas. The 98) Plans proposed to be listed as deferred submittals shall be clearly labeled on the cover
<br /> completed and the site is stabilized as defined under the Construction General NPDES main drive aisle shall be designated Emergency Vehicle Access Lane and building permit plan submittal cover sheet.
<br /> permit. be a minimum of 26' wide.
<br /> Prior to issuance of the first grading or building permit for a project, a copy of the 99) Inspections. Fire protection systems (fire hydrants, water mains, etc.) shall be installed, Sheet Title:
<br /> SWPPP or ESCP shall be submitted by the developer and approved by Authorized ii. A diagram showing proposed "Fire Lane" shall be submitted for approval tested and approved by the City prior to the issuance of any building permits. The Fire
<br /> Signatory or Legally Responsible Person (LRP) for the City's NPDES program. Contact to the Office of the Fire Marshal. Fire Lanes shall be marked in Department shall witness all system and acceptance tests. Please provide 24-hour
<br /> the City of Manteca Public Works Department to identify appropriate person for review accordance with California Fire Code (Appendix D103.6 SIGNS and notice prior to any system or acceptance tests. 209-456-8340. FINAL CONDITIONS
<br /> and approval of plans and documents. Manteca Fire Code 15.24. OF APPROVAL
<br /> 83) It is recognized that the design and calculations which have been submitted thus far to 100) A Fire Department approved "key lock box" shall be properly installed near the main
<br /> 93) Fire Hydrants: Plans and specifications for fire hydrant systems shall be submitted for entrance. A 3200 series lock box(s) can be order online directly from KNOXBOX.COM. Contact Date: 08.07.2020
<br /> demonstrate this project's compliance with the City's Post-Construction Stormwater review and approval prior to construction. the Office of the Fire Marshal at FireMarshal(a�mantecafire.org for additional information.
<br /> Standards Manual is approved for project entitlements but may require further Project Number: RAC19024.0
<br /> refinement for final approval, which is precedent to issuance of any building, grading, or i. Fire hydrants shall be installed on a minimum 8-inch looped water main. 101) Operations that require operational permits (High Piled Storage, Hot Work,
<br /> construction permits. Compressed Gas, Battery Storage and all others listed in CFC 105) shall be identified on Drawn By: XXX/XXX
<br /> 84)Applicant shall pay fair-share costs for storm drainage improvements, including ii. Fire hydrants shall be installed around all buildings at a maximum spacing the plan submittal.
<br /> improvements downstream to improve capacity or water quality treatments needed to of 300 feet in accordance with the City of Manteca Standards and
<br /> conform to current Storm Drain Master Plan, City standards and support the California Fire Code. Corners should be utilized for hydrant locations 102) All above comments shall be listed in the Building Permit Plan Submittal in a section
<br /> development. when possible. designated for Fire Comments. Additionally, the Authority Having Jurisdiction should be Sheet Number:
<br /> 85)Applicant shall complete the CDD development memorandum, required by Storm listed as:
<br /> Drainage Agreement Amendment No. 1, and submit it to SSJID for review. iii. Hydrants subject to vehicular damage shall be protected in an approved
<br /> manner and not be obstructed by vehicles or other obstructions.
<br /> COA2 . 0 N
<br /> Conditions of Approval Page 10 of 16 Conditions of Approval Page 11 of 16 Conditions of Approval Page 12 of 16 Q