My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1311
>
1600 - Food Program
>
PR0547032
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2021 1:32:03 PM
Creation date
8/19/2021 12:56:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0547032
PE
1625
FACILITY_ID
FA0026658
FACILITY_NAME
RAISING CANE'S #529
STREET_NUMBER
1311
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
208260080
CURRENT_STATUS
01
SITE_LOCATION
1311 E YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—/\ REFER TO PROJECT SPECIFICATIONS <br /> SHEETS A9.10 TO A9.60 <br /> 71 <br /> WOOD STUDS @ 16" O.C. H <br /> T <br /> 1/2" PLYWOOD SHEATHING. WOOD STUDS @ 16" O.C. W <br /> o1/2" <br /> o <br /> INTERIOR WOOD FINISH. LO <br /> RE: FINISH SCHEDULE 1/2" PLYWOOD SHEATHING 4'-0" "" C x <br /> 1/2" GYP. BD. A.F.F. N COUNTER BY EQUIPMENT w <br /> PROVIDER <br /> ROUTER CHAMFER BOTTOM PLYWOOD SUBSTRATE W �—� <br /> • �� <br /> EDGE OF PLANK _ _ <br /> II II 2x FRAMING AT 16" w o <br /> II II O.C. `X Q <br /> �j TP-1 & SEALANT ` � <br /> RE: FINISH SCHEDULE , s (TP-1) II II 1/2" INTERIOR SHEATHING " n ti <br /> TILE EDGE PROTECTOR II II m N1/2" <br /> II II 1/4" TILE BACKER BOARD. o M <br /> II II oco ai <br /> II II � <br /> II II CERAMIC WALL TILE,. <br /> CERAMIC BASE. CERAMIC BASE. RE: FINISH SCHEDULE <br /> RE: FINISH SCHEDULE RE: FINISH SCHEDULE <br /> II II <br /> II It 3x3 TSS, REF. <br /> 00 co <br /> CEMENT BOARD CEMENT BOARD II II <br /> STRUCTURAL <br /> <> <br /> SS WALL PANELS <br /> II II <br /> I I I I 11 Store: <br /> II II <br /> oil _ _ A8.31 1311 E. YOSEMITE AVE. <br /> II 1 II 1 <br /> MANTECA CEMENT BOARD TO 8" <br /> CA 95336 <br /> CERAMIC FLOOR TILE CERAMIC FLOOR TILE II II RUBBER FLOORING WITH Restaurant #RC529 <br /> RE: FINISH SCHEDULE RE: FINISH SCHEDULE II II <br /> 1 3/8" RADIUS COVE BASE <br /> >< <br /> y - Professional of Record: NAME <br /> v v v RUBBER FLOORING <br /> _ v <br /> TILE BASE AT WOOD WALL WALL BASE AT DINING PASS-THRU COUNTER NOT USED <br /> 16/A3�200�� 2116/A3�200» 318/5. 10 1'-0' <br /> FFAA <br /> 41 DESIGN <br /> Architectural <br /> 2 Solutions Group <br /> 38 EXECUTIVE PARK, <br /> SUITE 310 <br /> 1 1 9,-6„ IRVINE, CA 92614 <br /> Jh <br /> FULLY EMBEDDED STOOL � � CEILING HT. CONTACT:)JEFF LIEDERMAN <br /> . _ _ <br /> 4 430-7051 <br /> POST <br /> CUSTOM METAL JLIEDERMAN@PMDGINC.COM <br /> DRILL HOLE 1/16" LARGER <br /> COUNTERTOP, <br /> THAN ANCHOR & REMOVE CT-1 3'-0" <br /> - 71, <br /> ALL DUST & DEBRIS <br /> THOROUGHLY. INSTALL PER <br /> SUPPLIER REQUIREMENTS. <br /> HOT—ROLLED <br /> STEEL FINISH AT _ <br /> UNDERSIDE, r\—LED STRIP LIGHT <br /> SMOOTH BY CLIENT VENDOR <br /> I I 3 18"sQ. S.S. <br /> � <br /> CD I I ACCESS PANEL, I _ RC T <br /> Q I WHERE OCCURS N o Y S. Fc� <br /> E <br /> Lij - 1 —1 1 FRP FINISH, N �p RMPN <br /> C 1 1 DIMPLE WHITE REMOVABLE HOT C,2gsg4 <br /> 1 1 STAINLESS ADJUSTABLE STEEL ROLLED STEEL � PPR D 021 <br /> 5" 6" BASE PLATELI 11 <br /> 1 1 LEGS sT9T RENEWP� �\�o� <br /> of cP <br /> 1 1 _ <br /> 1 1 Prototype : P4 EXTENDED- HV, SCHEME A <br /> 1 J <br /> 1 1 RUBBER FLOOR9 TILE FLOOR FINISH Prototype Issue Date: 6.29.2020 <br /> FINISH START OF FLOOR <br /> A8.20 Design Bulletin Updates: INCLUDED <br /> 1 0'-0" <br /> RE: SLAB PLAN F.F. TRANSITION — <br /> ■ FOLLOW COUNTER Date Issued: Bulletin Number: <br /> OUTLINE NOV. 2018 1 & 2 <br /> CORE DRILL ANCHOR DETAIL AT FRONT CUBBY FINISH FLOOR ® COUNTER NOT USED 1ST BLDG. SUBMITTAL <br /> 3"= 1'-0"511/2'— 1'-0" 1"= 1'-0" <br /> 1/A1.21 61 1/A1.10 71 81 <br /> WOOD STUDS @ 16" O.C. REVISIONS: <br /> WOOD STUDS @ 16" O.C. WOOD STUDS @ 16" O.C. 1/2" PLYWOOD SHEATHING - WOOD STUDS @ 16" O.C. 1 08-07-20 1st. Bldg. Submittal <br /> 1/2" PLYWOOD SHEATHING 1/2" PLYWOOD SHEATHING PENNY ROUND TILE 3 <br /> 1/4" TILE BACKER BOARD (T-7) <br /> SS PANEL/FRP 1/4" TILE BACKER BOARD COOLER WALL 4 <br /> CERAMIC WALL TILE, PANEL 5 <br /> RE: FINISH PLAN A3.20 & _ <br /> FINISH SCHEDULE RE: FINISH PLAN A3.20 & <br /> CERAMIC WALL TILE FINISH SCHEDULE 6 <br /> RE: FINISH PLAN A3.20 & 7 <br /> f=::— <br /> FINISH SCHEDULE TP-2 CONT. CLEAR SEALANT 8 <br /> RE: FINISH SCHEDULE <br /> _---- 1/2" PAN—HEAD SCREWS (TP-1) __----1/2" PAN—HEAD SCREWS 9 <br /> CONT. CLEAR SEALANT <br /> TP-2 TP-2 <br /> RE: & FINISH SCHEDULE RE: & FINISH SCHEDULE <br /> Sheet Title: <br /> EXTEND RUBBER FLOORING EXTEND RUBBER FLOORING CERAMIC BASE. EXTEND RUBBER FLOORING <br /> TO CREATE COVE BASE TO CREATE COVE BASE RE: FINISH SCHEDULE TO CREATE COVE BASE INTERIOR DETAILS <br /> R A <br /> 200 <br /> 00 00 0 <br /> CEMENT BOARD <1 CEMENT BOARD CEMENT BOARD CEMENT BOARD CEMENT BOARD <br /> Date: 08.07.2020 <br /> COVE BASE SCHLUTE (BT-1) Project Number: RAC19024.0 <br /> RE: & FINISH SCHEDULE 4� ROUT RUBBER FLOOR lb ROUT RUBBER FLOOR <br /> �\ ROUT RUBBER FLOOR �\ �\ Drawn By: XXX/XXX <br /> 4- AS REQUIRED AS REQUIRED <br /> AS REQUIRED <br /> FLOOR TILE RUBBER FLOORING <br /> RUBBER FLOORING RE: & FINISH SCHEDULE CERAMIC FLOOR TILE RUBBER FLOORING <br /> RE: FINISH SCHEDULE <br /> Sheet Number: <br /> RUBBER BASE ® FPR SS PANELA8 . 31 <br /> SCHLUTE BASE ® RESTROOM RUBBER BASE ® TILE WALL TILE BASE ® PENNY ROUND TILE COVE BASE ® COOLER <br /> 6»-1 0' Q <br /> — — 6 = 1 -0 6 = 1 -0 6 = 1 -0 6 = 1 -0 <br /> 911/A3.20 1/A3.20 1/A3.20 1/A3.20 1/A3.20 m <br />
The URL can be used to link to this page
Your browser does not support the video tag.