Laserfiche WebLink
H <br /> o <br /> 3. QUALITY CONTROL: THE CONTRACTOR SHALL COMPLY FULLY WITH EACH BUILDING SECTION 01 77 00 - CLOSEOUT PROCEDURES W N m <br /> TECHNICAL SPECIFICATIONS COMPONENT MANUFACTURER'S INSTRUCTIONS, INCLUDING EACH STEP IN SEQUENCE. DIRECTORY O F MANUFACTURERS �' o <br /> SHOULD MANUFACTURERS INSTRUCTIONS CONFLICT WITH CONSTRUCTION 1. AT SUBSTANTIAL COMPLETION, THE CONTRACTOR IS TO SUBMIT WRITTEN NOTICE CD <br /> � x ti <br /> DIVISION 1 - GENERAL REQUIREMENTS DOCUMENTS, REQUEST CLARIFICATION FROM ARCHITECT BEFORE PROCEEDING. CERTIFYING THAT CONTRACT DOCUMENTS HAVE BEEN REVIEWED, WORK HAS & SUPPLIERS w o ~ ti <br /> BEEN INSPECTED, AND THAT THE WORK IS COMPLETE IN ACCORDANCE WITH THE i� 60-) <br /> 4. TESTING: THE CONTRACTOR SHALL PROVIDE AND PAY FOR INDEPENDENT TESTING CONTRACT DOCUMENTS AND READY FOR INSPECTION. W Q co <br /> SUMMARY OF THE WORK: SERVICES (LABORATORY) DURING CONSTRUCTION AS FOLLOWS: SOIL COMPACTION <br /> SINGLE-PLY ROOFING FIRESTONE METAL ROOFING BERRIDGE C.7 "' M o <br /> TESTS AND CONCRETE TESTING ON PAVING, BUILDING SLAB / GRADE BEAMS. PROVIDE 2. SUBMIT FINAL APPLICATION FOR PAYMENT IDENTIFYING TOTAL ADJUSTED w - o 0 <br /> BUILDING PRODUCTS 250 WEST MANUFACTURING 6515 -x �, <br /> 1. CONTRACTOR TO FURNISH ALL LABOR AND MATERIALS AS INDICATED IN THE COMPACTION TESTS PRIOR TO ALL CONCRETE POURS & CYLINDER TEST AFTER. CONTRACT SUM, PREVIOUS PAYMENTS, AND SUM REMAINING DUE. EXECUTE Q <br /> 96TH ST. INDIANAPOLIS, IN 46260 FRATT ROAD SAN ANTONIO, v o Cn <br /> CONSTRUCTION DOCUMENTS AND PROVIDE COORDINATION AND PROTECTION FOR FINAL CLEANING PRIOR TO INSPECTION. _„ <br /> OWNER SUPPLIED ITEMS FOR THE FOLLOWING BASIC AREAS OF WORK: CONTACT:YUSUKE KOREEDA TX CONTACT: TODD BAKER c m N <br /> SECTION 01 50 00 - TEMPORARY FACILITIES & CONTROLS 3. ADJUST ALL OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND (317)575-7290 (281) 830-4866 0 <br /> SITE DEVELOPMENT, INCLUDING BUT NOT LIMITED TO: DEMOLITION, SITE CLEARING, UNHINDERED OPERATION. KOREEDAYUSUKE@BFUSA.COM TBAKER@BERRIDGE.COM � <br /> EARTHWORK, SITE GRADING, PAVING, STORM DRAINAGE, SITE POWER, SITE LIGHTING, 1. TEMPORARY FACILITIES AND CONTROL: THE CONTRACTOR SHALL FURNISH REQUIRED <br /> SITE SEWER & SITE WATER. LABOR AND MATERIALS FOR THE TIE-IN OF TEMPORARY ELECTRICAL POWER AND 4. DURING THE CONSTRUCTION PROCESS, THE CONTRACTOR SHALL MAINTAIN A <br /> WATER SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY INITIAL FEES SET OF DRAWINGS AT THE SITE FOR THE PURPOSE OF PREPARING RECORD BRICK MASONRY BORAL BRICK, BRICK MASONRY <br /> THE LANDSCAPING & IRRIGATION SYSTEM WILL BE PROVIDED & INSTALLED BY OWNER AND MONTHLY COST FOR THIS SERVICE. DRAWINGS. NEATLY RECORD ALL CHANGES IN THE WORK. INC 200 MANSELL COURT EAST, BELDEN BRICK, <br /> UNDER SEPARATE CONTRACT. THE GENERAL CONTRACTOR RESPONSIBLE TO FINE #310 ROSWELL, GA 30076 ACME BRICK <br /> GRADE OPEN AREAS TO ACCEPT SOD. CONTRACTOR TO COORDINATE INSTALLATION 2. THE CONTRACTOR SHALL PROVIDE TEMPORARY TOILET FACILITIES DURING THE 5. SUBMIT THE RECORD DRAWINGS TO THE OWNER FOR APPROVAL WITH THE CONTACT: RANDY JARRETT CONTACT: CELI SIMS <br /> OF IRRIGATION SLEEVES UNDER PAVEMENT. ENTIRE LENGTH OF CONSTRUCTION. COMPLETED PUNCH-LIST. (704)630-4237 (214)998-7181 <br /> BUILDING SHELL, INCLUDING BUT NOT LIMITED TO: FOUNDATION, PLASTER 6-EbTzW 3. THE CONTRACTOR SHALL MAINTAIN A TEMPORARY CONSTRUCTION JOB OFFICE 6. PRIOR TO FINAL PAYMENT, SUBMIT THREE (3) COPIES OF OPERATION & RANDY.JARRETT@BORAL.COM CSIMS@BRICK.COM Store: <br /> AND BRICK VENEER ON WOOD FRAMING, SINGLE-PLY ROOF ON PLYWOOD DECK EQUIPPED WITH A TEMPORARY TELEPHONE, FAX, COMPUTER AND E-MAIL SERVICE FOR MAINTENANCE MANUALS FOR EACH ITEM OF BUILDING EQUIPMENT, APPARATUS, 1311 E. YOSEMITE AVE. <br /> AND WOOD ROOF TRUSSES, STANDING SEAM METAL ROOFING, METAL AWNINGS, USE DURING THE CONSTRUCTION PHASE. A COMPLETE AND UPDATED SET OF ALL OR ANY OTHER OPERATIONAL SYSTEM FURNISHED UNDER THIS CONTRACT. THE STUCCO CLADDING ALUMINUM STOREFRONT <br /> STOREFRONT SYSTEMS, GLAZING, DRIVE-THRU WINDOWS, EXTERIOR BUILDING CONSTRUCTION DOCUMENTS SHALL BE KEPT ON RECORD AT THE JOB OFFICE AT ALL MANUALS SHALL BE NEATLY BOUND WITH COVERS AND SHALL INCLUDE THE DRYVIT SYSTEMS, INC OLDCASTLE BUILDING ENVELOPE MANTECA CA 95336 <br /> LIGHTING AS WELL AS MECHANICAL AND ELECTRICAL SYSTEMS DEFINED HEREIN. TIMES DURING CONSTRUCTION. FOLLOWING INFORMATION: ONE ENERGY WAY WEST CONTACT: BRYNN MCMILLIN (214) <br /> • TYPEWRITTEN INDEX WARWICK, RI 02893 862-9990 BMCMILLIN@OBE.COM Restaurant #RC529 <br /> ALSO INCLUDING DRYWALL AND WALL FINISHES, FLOOR FINISHES, CEILING FINISHES, SECTION 01 60 00 - PRODUCT REQUIREMENTS LIST OF RESPONSIBLE SUBCONTRACTORS AND CONTACT INFORMATION CONTACT: BOB DAZEL <br /> INTERIOR DOORS AND FRAMES, INTERIOR AND EXTERIOR DOOR HARDWARE AND COMPLETE INSTRUCTIONS REGARDING OPERATION, SERVICE & (734)276-0404 <br /> LIGHTING. 1. NO SUBSTITUTIONS OR ALTERNATES FOR THE EQUIPMENT & MATERIALS SPECIFIED MAINTENANCE OF EACH ITEM BOB.DAZEL@DRYVIT.COM Professional of Record: NAME <br /> SHALL BE MADE WITHOUT APPROVAL FROM THE OWNER C.M.. EQUIPMENT CUT-SHEETS <br /> PERMITS, FEES: RESPONSIBLE PARTY FOR PAYMENT OF BUILDING PERMIT FEES, TAP ORIGINAL COPIES OF ALL GUARANTEES & WARRANTIES ALUMINUM STOREFRONT <br /> FEES, & IMPACT FEES SHALL BE DETERMINED ON A CASE-BY- CASE BASIS. OWNER C.M. 2. GUARANTEE: THE GENERAL CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL KAWNEER NORTH AMERICA <br /> SHALL DETERMINE WHETHER FEES ARE TO BE INCLUDED IN THE CONTRACT AMOUNT, MATERIALS, EQUIPMENT & WORKMANSHIP FURNISHED OR INSTALLED BY HIM OR HIS 555 GUTHRIDGE CT. FvAA <br /> REIMBURSED BY THE OWNER, OR PAID DIRECTLY BY THE OWNER. INSPECTION FEES SUBCONTRACTORS FOR A PERIOD ONE (1) YEAR FROM THE DATE OF SUBSTANTIAL NORCROSS, GA 30092 <br /> SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE PAID COMPLETION. THE GENERAL CONTRACTOR AGREES TO REPLACE OR REPAIR DIVISION 3 - CONCRETE CONTACT:BRAD SINCLAIR DESIGN <br /> FOR BY THE G.C. DEFECTIVE WORK OR EQUIPMENT WITHIN TEN (10) DAYS AFTER IT IS BROUGHT TO HIS (404)731-0046 EMAIL: <br /> l <br /> 2. DEFINITION OF SUBSTANTIAL COMPLETION: THE PROJECT IS DEEMED SUBSTANTIALLY ATTENTION. SECTION 03 30 00 - CAST-IN-PLACE CONCRETE (INCLUDES EXTERIOR) ArCI11t2Ctura <br /> COMPLETE AT SUCH TIME THAT RAISING CANE'S CAN "OPEN" FOR BUSINESS AND Solutions Group <br /> OPERATE SAID BUSINESS AT NO "INCONVENIENCE" TO OPERATOR OR CUSTOMERS. SECTION 01 64 00 - OWNER FURNISHED PRODUCTS *** STRUCTURAL PLANS TAKE PRECEDENT OVER BELOW WHEN SPECIFIED ** INSULATED GLAZING INSULATED GLAZING 38 EXECUTIVE PARK, <br /> "INCONVENIENCE" IS DEFINED AS ANY CONSTRUCTION RELATED ACTIVITIES THAT ARE VIRACON 800 PARK DRIVE VITRO 400 GUYS RUN RD. SUITE 310 <br /> REQUIRED TO SUCCESSFULLY COMPLETE THE PROJECT WHICH HAVE THE POTENTIAL 1. REFER TO THE INSTALLATION & RESPONSIBILITY SCHEDULE ON SHEET A9.20. THE 1. CAST-IN-PLACE CONCRETE WORK INCLUDING ALL LABOR, TOOLS, MATERIAL, OWATONNA, MN 55060 CHESWICK, PA 15024 IRVINE, CA 92614 <br /> TO AFFECT THE APPEARANCE, OPERATIONS OR FUNCTION OF THE FACILITY AND OWNER WILL SUPPLY THE CONTRACTOR WITH A LIST OF ALL EQUIPMENT SUPPLIERS EQUIPMENT AND SERVICES NECESSARY TO PROPERLY PLACE AND COMPLETE CONTACT: THOMAS CATER CONTACT: DAVID LINHART CONTACT: JEFF LIEDERMAN <br /> GROUNDS FOR ITS' INTENDED USE, NOT INCLUSIVE OF MINOR PUNCH LIST ITEMS. FOR AT THE START OF THE PROJECT FOR COORDINATION PURPOSES. ALL INTERIOR AND EXTERIOR CAST-IN-PLACE CONCRETE, FORM WORK, (423) 805-6771 (214) 218-1382 (949) 430-7051 <br /> SCHEDULING PURPOSES, SUBSTANTIAL COMPLETION SHOULD OCCUR (1) ONE WEEK IN REINFORCEMENT, JOINTS AND EMBEDDED ITEMS, FINISHING, CURING AND DLINHART@VITRO.COM JLIEDERMAN@PMDGINC.COM <br /> ADVANCE OF THE SCHEDULED TURN-OVER DATE. 2. THE OWNER WILL PROVIDE ALL FURNISHINGS (BOOTHS, TABLES & CHAIRS). THE CONCRETE TESTING. <br /> GENERAL CONTRACTOR IS TO REFER TO THE "SCHEDULE OF INSTALLATION & <br /> 3. DEFINITION OF TURN-OVER: TURN-OVER IS THE SCHEDULED DATE THAT THE GENERAL RESPONSIBILITIES" ON A9.20. REFER TO FOOD SERVICE DRAWINGS FOR ILLUSTRATION 2. UNLESS OTHERWISE SHOWN OR SPECIFIED, THE WORK SHALL CONFORM TO THE OPERABLE PANEL WINDOWS (P1&P2) OPERABLE PANEL WINDOWS (P4) <br /> CONTRACTOR HAS COMPLETED THE PROJECT AND IS READY TO "TURN OVER" THE OF SEATING PLAN. FOLLOWING STANDARDS OF THE AMERICAN CONCRETE INSTITUTE. OVERHEAD DOOR COMPANY JOHNSON ARCHITECTURAL SYSTEMS <br /> STORE TO THE RAISING CANE'S NEW STORE OPENING TEAM. TURN-OVER OF THE CONTACT: CEDRIC BAKER 4674 OLIN DR. DALLAS, TX 75244 <br /> STORE WILL NOT OCCUR UNTIL THE PROJECT IS 100% COMPLETE, INCLUDING ALL 3. THE OWNER WILL PROVIDE ALL KITCHEN EQUIPMENT WITH FINAL CONNECTION BY ACI 214, RECOMMENDED PRACTICE FOR EVALUATION OF STRENGTH TESTS (501)779-1878 CONTACT: CLAY STURDIVANT (972) <br /> PUNCH LIST ITEMS. ALL INSPECTIONS ARE COMPLETE AND A CERTIFICATE OF GENERAL CONTRACTOR. RESULTS OF CONCRETE; ACI 306R, COLD WEATHER CONCRETING; ACI 315, WWW.OVERHEADDOOR.COM 665-6065 CSTURDIVANT@JEQUIP.COM <br /> OCCUPANCY HAS BEEN RECEIVED. THE STORE IS CLEAN, ALL OWNER PROVIDED MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE <br /> EQUIPMENT INSTALLS ARE COMPLETE AND THE STORE IS READY TO OPEN FOR 4. THE GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE INSTALLATION OF STRUCTURE; ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED <br /> BUSINESS. ALL OWNER FURNISHED KITCHEN EQUIPMENT, IT EQUIPMENT, MILLWORK AND CONCRETE; ACI 347, RECOMMENDED PRACTICE FOR CONCRETE FORM WORK; ACI <br /> FURNISHINGS. THE CONTRACTOR IN COORDINATION WITH THE SUPPLIERS AND 305R, HOT WEATHER CONCRETING; ACI 211.1, STANDARD PRACTICE FOR DRIVE-THRU WINDOWSRC <br /> ROOF-TOP UNITS LENNOX 2100 T <br /> OWNER WILL ESTABLISH DELIVERY DATES. THE FURNISHINGS WILL NOT BE INSTALLED SELECTING PROPORTIONS FOR NORMAL, HEAVYWEIGHTS AND MASS CONCRETE; F <br /> QUIKSERV LAKE PARK BLVD. RICHARDSON, s• <br /> SECTION 01 31 19 - PROJECT MEETINGS UNTIL SUCH TIME THAT THE BUILDING CONSTRUCTION IS SUBSTANTIALLY COMPLETE ACI 304R GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING 11441 BRITTMOORE PARK DR. REY N <br /> AS DETERMINED BY THE OWNER. ANY NECESSARY STORAGE OF ANY FF&E DUE TO TX 75080 CONTACT: CHRISTIAN E�ERMP <br /> 1. WITHIN (1) ONE WEEK OF NOTICE TO PROCEED, THE GENERAL CONTRACTOR IS THE STATUS OF THE WORK AT THE TIME OF THE DELIVERY WILL BE THE CONCRETE. HOUSTON, TX 77041 BARGHESE (972) 497-5056 29534 <br /> 713-849-5882 G' <br /> REQUIRED TO HOLD A "PRE-CONSTRUCTION" MEETING ON-SITE. THE GENERAL RESPONSIBILITY OF THE GENERAL CONTRACTOR. 3. MATERIALS: SALES@ QUIKSERV.COM <br /> CONTRACTORS' PROJECT MANAGER AND ALL PRIMARY SUBCONTRACTORS SHALL BE PPR, 30 oPIc <br /> IN ATTENDANCE. IN ADDITION TO THE GENERAL CONTRACTORS OWN AGENDA, THE PORTLAND CEMENT: ASTM C150, TYPE 1 sT RENEwP � <br /> GENERAL CONTRACTOR SHALL REVIEW AND PROVIDE COPIES OF THE RAISING SECTION 01 74 23 - FINAL CLEANING <br /> CANE'S STORE CONSTRUCTION MEETING AGENDA TO ALL IN ATTENDANCE. THE WATER HEATER **RINNAI LIGHTING BUILDING & SITE C F C <br /> AGGREGATES: ASTM C33 ( ) <br /> DISCUSSION SHALL BE DOCUMENTED IN A "MEETING MINUTES" MEMO WHICH SHALL 1. THE FOLLOWING IS A GENERAL SCOPE OF WORK REQUIRED FOR A "FINAL" STORE HAMILTON SALES, INC 11725 E. SAM JONES 4898 SOUTH <br /> BE PROVIDED TO THE OWNER. CLEANING. THIS WORK SHOULD BE PERFORMED BY A QUALIFIED, PROFESSIONAL WATER: CLEAN, FRESH, AND POTABLE INDUSTRIPLEX BLVD.STE#5 ATLANTA ROAD SMYRNA, Prototype : P4 EXTENDED- HV, SCHEME A <br /> CLEANING CREW. SPECIAL CARE SHOULD BE TAKEN TO PROTECT FURNITURE, BATON ROUGE, LA 70809 GA 30080 CONTACT: TY <br /> MILLWORK AND MILLWORK TOPS DURING THE CLEANING PROCESS. AIR CONTENT: 5% TO 8% ON EXTERIOR ONLY CONTACT: CHAD HAMILITON WICHMAN (404)351-3250 Prototype Issue Date: 6.29.2020 <br /> SECTION 01 33 00 - SUBMITTAL PROCEDURES (225)756-9876 EXT. 247 Design Bulletin Updates: INCLUDED <br /> ADDITIVES: FLY ASH NOT PERMITTED. CHAD@HAMILTONSALES.ORG TWICHMAN@ESAMJONES.COM <br /> 1. SCHEDULES & REPORTS: PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT INTERIOR: Date Issued: Bulletin Number: <br /> A BAR TYPE SCHEDULE OF CONSTRUCTION INCLUDING PROPOSED INSTALLATION REINFORCING STEEL (BARS): ASTM A615, GRADE 60 (40 FOR STIRRUPS & TIES) ELECTRICAL COMPONENTS ALUMINUM ACCESS LADDER <br /> DATES FOR OWNER FURNISHED ITEMS. THE GENERAL CONTRACTOR IS REQUIRED TO CLEAN ALL TILE FLOORS (REMOVE HAZE) INTERMATIC, INC. 7777 WINN CALICO LADDERS 1800 SECOND NOV. 2018 1 & 2 <br /> KEEP THE SCHEDULE CURRENT AT ALL TIMES. THE GENERAL CONTRACTOR IS CLEAN ALL TILE WALLS (REMOVE HAZE) WELDED WIRE FABRIC REINFORCING FOR SLABS ON GRADE: ASTM A185 6X6 10/10 ROAD SPRING GROVE, IL LOOP RD., STE. 4 FLORENCE, SC <br /> REQUIRED TO SUBMIT A PROGRESS REPORT (INCLUDING RECENT PHOTOGRAPHS) CLEAN WINDOWS, FRAMES, AND SILLS MINIMUM SIZE. FOR SLABS ON GRADE, WHERE WETTED BASE MATERIAL WILL NOT 60081 CONTACT: JASON 29501 CONTACT: MICHELLE 1 ST BLDG. SUBMITTAL <br /> ALONG WITH THE THEN CURRENT SCHEDULE TO THE OWNER EVERY TWO WEEKS WIPE DOWN ALL WOOD WALL PANELING SUPPORT CHAIR LEGS, USE SUPPORT WITH SAND PLATES OR HORIZONTAL WALKER (815)236-6949 YSASI (800)403-7024 <br /> AND/OR EACH TIME THE SCHEDULE CHANGES IF MORE FREQUENTLY. WIPE DOWN ALL BOOTHS & TABLES RUNNERS. JWALKER@INTERMATIC.COM SALES@CARBISSOLUTIONS.COM <br /> WIPE DOWN COUNTERS / MILLWORK <br /> 2. PAYMENT: THE CURRENT PROGRESS REPORT SHALL BE SUBMITTED TO THE OWNER WIPE DOWN ALL STAINLESS CORNERS /WALL PANELING FORMS: STEEL, WOOD OR OTHER SUITABLE MATERIAL OF SIZE AND STRENGTH TO <br /> MONTHLY ALONG WITH THE CONTRACTORS REQUEST FOR PAYMENT. PRIOR TO WIPE DOWN ALL FRP RESIST MOVEMENT DURING CONCRETE PLACEMENT AND TO RETAIN HORIZONTAL <br /> CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT A SCHEDULE OF VALUES (LINE ITEM) CLEAN ALL DECORATIVE LIGHT FIXTURES AND RECESSED CAN LIGHT AND VERTICAL ALIGNMENT UNTIL REMOVAL. USE STRAIGHT FORMS, FREE OF RUBBER FLOORING ECO-GRIP BOLLARD SLEEVES IDEAL <br /> TO THE ARCHITECT. PAYMENT APPLICATION FORMS: AIA DOCUMENT G702. REFLECTORS (REMOVE STICKERS / LABELS) DISTORTION AND DEFECTS. USE FLEXIBLE SPRING STEEL FORMS OR LAMINATED 1088 GAFFNEY HWY. SHIELD 2525 CLARK ST. <br /> CLEAN RUBBER FLOOR & COVE BASE BOARDS TO FORM RADIUS BENDS AS REQUIRED. COAT FORMS WITH A JONESVILLE, SC 29353 DETROIT, MI 48209 CONTACT: <br /> 3. SUBMITTALS: THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND/OR SAMPLES FOR WIPE DOWN ALL DOORS AND FRAMES NON-STAINING FORM RELEASE AGENT THAT WILL NOT DISCOLOR OR DEFACE THE CONTACT: SALES (864)674-0018 ANTONIO RIVERA <br /> APPROVAL FOR EACH OF THE FOLLOWING: CONCRETE MIX DESIGN, STRUCTURAL STEEL WIPE DOWN TOILET PARTITIONS SURFACE OF THE CONCRETE. SALES@ECO-GRIPFLOOR.COM (313)842-7290 <br /> COMPONENTS, WOOD TRUSSES, HVAC EQUIPMENT, PLUMBING EQUIPMENT, GREASE CLEAN ALL PLUMBING FIXTURES, FLOOR SINKS & DRAINS ARIVERA@IDEALSHIELD.COM REVISIONS: <br /> INTERCEPTOR, SPRINKLER SYSTEM, DRIVE-THRU WINDOWS, OPERABLE PANEL CLEAN ALL TOILET ROOM ACCESSORIES VAPOR BARRIER: ASTM E1745, CLASS B: STEGO WRAP, 15 MIL. THICK. 1 08-07-20 1st. Bldg. Submittal <br /> WINDOWS, DUMPSTER AND CORRAL ROOFS, EXTERIOR AWNINGS & CANOPIES, DUST ALL CEILING ELEMENTS 2 <br /> NON-PROTOTYPICAL FINISHES & CLADDING MATERIALS. THE ARCHITECT WILL REVIEW CLEAN FRONT COUNTER CANOPY/ BULKHEAD CAPILLARY BREAK: 4" THICK LAYER OF 1/2" - 1 1/2" OPEN-GRADED STONE OR HEIGHT DETECTOR POLE WATER SOFTENER CULLIGAN 3 <br /> SHOP DRAWINGS FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO GRAVEL PLACED BENEATH VAPOR BARRIER HAN-D-MAN & CO. 13439 LOMA 1034 AUSTIN ST. SAN <br /> CONTRACT DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING EXTERIOR: 4 <br /> 4. CONCRETE MIX: <br /> AND CORRELATING DIMENSIONS AT THE JOBSITE FOR TOLERANCE, CLEARANCE, RICA DR. GRASS VALLEY, CA ANTONIO, TX 78208 CONTACT: <br /> 95945 CONTACT:DAN DOWNEY PHIL WHALEN (210) 842-3139 5 <br /> QUANTITIES, FABRICATION PROCESSES, AND TECHNIQUES OF CONSTRUCTION, SWEEP PARKING LOT, WALKS, AND ADJACENT DRIVES a. READY MIXED PER ASTM C94. 6 <br /> HANDEM-3512 <br /> COORDINATION OF CONTRACTOR'S WORK WITH OTHER TRADES, AND FULL PRESSURE WASH PARKING LOT, CURBS, AND WALKS b. STRENGTH - PER STRUCTURAL PLANS OR MINIMUM AS FOLLOWS: (80NDPWHALEN@CULLIGANSA.COM <br /> CLEAN /WASH ALL METAL ROOFING, SOFFIT PANELING, AND FLASHING BUILDING = 3,000 PSI 28 DAYS EMANCO@SBCGLOBAL.NET 7 <br /> COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR MUST EXPRESSLY WASH DOWN SINGLE-PLY ROOF SURFACE @ 8 <br /> IDENTIFY IN WRITING ALL CHANGES, DEVIATIONS, OR SUBSTITUTIONS FROM THE EXTERIOR (EXPOSED) = 4,000 PSI @ 28 DAYS <br /> REQUIREMENTS OF THE CONTRACT DOCUMENTS. REVIEW AND APPROVAL OF ANY WASH DOWN MASONRY AND STUCCO SITE PAVING: REFER TO SITE DETAILS 9 <br /> CLEAN WINDOWS AND FRAMES SIGNAGE & EXTERIOR AWNINGS TOILET ACCESSORIES <br /> CONTRACTOR SUBMITTAL DOES NOT AUTHORIZE CHANGES OR SUBSTITUTIONS FROM CLEAN STOREFRONT DOORS AND FRAMES C. SLUMP: ARCHITECTURAL GRAPHICS INC. BRADLEY CORPORATION <br /> THE REQUIREMENTS OF THE CONTRACT DOCUMENTS UNLESS THE OWNER EXPRESSLY THE MAXIMUM FOR GENERAL USE. 412 N. CEDAR BLUFF RD. SUITE 306 W142N9101 FOUNTAIN BLVD. <br /> WIPE DOWN LIGHT POLES 3-INCH MAXIMUM FOR FLAT WORK.. <br /> AUTHORIZES IN WRITING THE CHANGE OR SUBSTITUTION. CLEAN DUMPSTER ENCLOSURE d. PROVIDE MIX DESIGN TO OWNER FOR REVIEW. KNOXVILLE, TN 37923 MENOMONEE FALLS, WI 53051 <br /> REMOVE ALL TRASH AND DEBRIS FROM SITE CONTACT: SARAH HOLMES CONTACT: DENNIS KOOLHAAS Sheet Title: <br /> SECTION 01 45 00 - QUALITY CONTROL 5. VERIFY LINES, LEVELS, AND MEASUREMENT BEFORE PROCEEDING WITH (800) 877-7868 x3204 (858)952-9830 <br /> FORMWORK. CONSOLIDATE TRENCH BACKFILL AND AGGREGATE BASE WITH SHOLMES@AGI.NET DENNIS,KOOLHAAS@ PROJECT <br /> 1. ADMINISTRATION & SUPERVISION: THE CONTRACTOR SHALL PROVIDE A QUALIFIED AND VIBRATORY PLATE COMPACTOR. BRADLEYCORP.COM SITE PLAN <br /> COMPETENT JOB SUPERINTENDENT TO MAN THE JOB AT ALL TIMES. SELECTION OF THE <br /> SUPERINTENDENT SHALL BE SUBJECT TO THE REVIEW OF THE OWNER WHO SHALL 6. COORDINATE WORK OF OTHER SECTIONS IN FORMING AND SETTING OPENINGS, <br /> HAVE THE RIGHT UNDER THIS CONTRACT TO REQUIRE THAT THE GENERAL SLOTS, RECESSES, CHASES, SLEEVES, BOLTS, ANCHORS, AND OTHER INSERTS. ORDERING OF EQUIPMENT & MATERIALS: Date: 08.07.2020 <br /> CONTRACTOR REPLACE THE JOB SUPERINTENDENT AT ANY TIME DURING THE COURSE EXPOSED CORNERS SHALL BE CHAMFERED 3/4" UNLESS SHOWN OTHERWISE. Project Number: <br /> OF WORK. FAILURE TO DO SO WITHIN 7 DAYS OF REQUEST WILL CONSTITUTE GROUNDS TO AVOID SCHEDULING OR LEAD TIME ISSUES, IT IS HIGHLY RECOMMEND THAT THE RAC19024.0 <br /> FOR CONTRACT TERMINATION. 7. PLACE, SUPPORT, AND SECURE REINFORCEMENT AGAINST DISPLACEMENT PER GENERAL CONTRACTOR AND HIS SUBCONTRACTORS PLACE ORDERS FOR ALL Drawn By: <br /> ACI 315. SPECIFIED EQUIPMENT & MATERIALS WITHIN 5 DAYS OF NOTICE TO PROCEED. ITEMS XXX/XXX <br /> 2. SCHEDULING: IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY OF SPECIFIC CONCERN INCLUDE THE ALUMINUM STOREFRONT, SINGLE-PLY & METAL <br /> THAT PURCHASE ORDERS FOR THE SPECIFIED EQUIPMENT AND/OR MATERIALS ARE ROOFING, LIGHT FIXTURE PACKAGE, ROOF-TOP UNITS & ALL FLOOR/WALL TILES. <br /> PLACED IN A TIMELY MANNER TO ACCOMMODATE THE APPROVED CONSTRUCTION <br /> SCHEDULE, INCLUDING ORDERS MADE BY SUB-CONTRACTORS. Sheet Number: <br /> DIRECTORY UPDATED: FEBRUARY 20111 <br /> A9 . 10 <br /> J <br /> Q <br /> 1- <br /> L <br /> OO <br />