Laserfiche WebLink
fiber optic connections shall be done in accordance with the MHCSD <br /> Communication Master Plan , <br /> Best Management Practices : <br /> 11 . The Developer shall comply with MHSWMP policies , MHSWMP mitigation <br /> measures and Phase I and II NPDES permit requirements , including the preparation <br /> and implementation of an SWPPP that outlines B . M . P . s to be followed to minimize <br /> erosion and sedimentation during project construction and operation . <br /> 12 . The Developer shall install catch basin filters , Water Decontaminator per MHCSD <br /> Standard Specification and Details , and/or other source control Best Management <br /> Practices (B_M . P . $ ) for runoff from the project prior to issuance of the building <br /> permit . <br /> Construction- Related Erosion : The Developer and/or contractor shall comply with <br /> applicable NPDES General Construction Activities Storm Water Permit <br /> requirements established by the Clean Water Act . Pursuant to the NPDES Storm <br /> Water Program , an application for coverage under the statewide General <br /> Construction Activities Storm Water Permit ( General Permit) shall be obtained for <br /> project development prior to the issuance of grading permits . The Developer and/or <br /> contractor shall obtain coverage under the General Permit by filing a Notice of Intent <br /> with the State Water Resource Control board ' s ( SWRCB ) Division of Water Quality . <br /> The filing shall describe erosion control and stormwater treatment measures to be <br /> implemented during and the following construction and provide a schedule for <br /> monitoring performance . MHCSD approved B . M . P . s shall serve to control point and <br /> non-point source pollutants in stormwater and shall constitute the project ' s <br /> stormwater pollution prevention program ( SWPPP ) for construction activities . <br /> Timing : All applicable permits shall be obtained prior to the issuance of grading <br /> permits for the project . <br /> 13 . Project Developer shall develop and submit a Project Stormwater Plan that identifies <br /> the methods to be employed to reduce or eliminate stormwater pollutant discharges <br /> through the construction , operation, and maintenance of source control measures , <br /> low impact development design, site design measures , stormwater treatment control <br /> measures , and hydro modification control measures . <br /> 14 . Runoff from non- residential areas shall be pretreated on- site before discharge into <br /> the MHCSD public stormwater collection system . <br /> 15 . Catch basin inserts - (Decontaminators ) shall be installed in each storm drain inlet <br /> structure . The decontaminator shall comply with MHCSD Detail SD - 22 . The type <br /> of decontaminators has to be pre - approved by MHCSD . " <br /> PA-2100154 - Conditions of Approval 3 <br />