My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014339
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4860
>
2600 - Land Use Program
>
PA-2100170
>
SU0014339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2023 8:44:55 AM
Creation date
8/20/2021 9:47:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014339
PE
2632
FACILITY_NAME
PA-2100170
STREET_NUMBER
4860
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
17321014
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
4860 E MAIN ST
RECEIVED_DATE
3/3/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. If the project includes landscaping, it will be required to comply with the Model Water Efficiency <br /> Landscape Ordinance requirements of the California Code of regulations, Title 22, Division 2, <br /> Chapter 2.7 <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209] 468-3000) <br /> a. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only — all vertical features, including but not limited to fences, <br /> walls, private light standards, rocks, landscaping and cobbles are not allowed in the right-of-way.) <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. Prior to issuance of the occupancy permit,the driveway approach shall be improved in accordance with <br /> the requirements of San Joaquin County Improvement Standards Drawing No. R-13 (return radii for <br /> truck-trailer egress shall be designed to prevent encroachment onto opposing lanes of traffic). <br /> (Development Title Section 9-1145.5) <br /> c. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable at <br /> the time of building permit application. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. (Resolution <br /> R-00-433) <br /> d. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at the <br /> time of payment. (Resolution R-06-38) <br /> e. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> due and payable prior to issuance of the building permit. The fee will be based on the current schedule <br /> at the time of payment. (Development Title Section 9-818-4 and Resolutions R-91-327, R-94-185 and <br /> R-97-5) <br /> f. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> g. The frontage improvements for Main Street shall be constructed in conformance with the standards for <br /> one-half of an 84-foot-wide right=of-way urban minor arterial road. The improvements shall be in <br /> conformance with the current Improvement Standards of the County of San Joaquin. improvement <br /> plans,specifications, and engineer's estimate prepared by a registered civil engineer shall be submitted <br /> for review and are subject to plan check, field inspection fees and must be approved by the County of <br /> San Joaquin Department of Public Works prior to issuance of the building permit. (Development Title <br /> Section 9-240, Section 9-910, Section 9-1100 and R-92-814). <br /> h. The frontage improvements for Miwuk Village Drive shall be constructed in conformance with the <br /> standards for one-half.of an 60-foot-wide right-of-way urban residential street. The improvements shall <br /> be in conformance with the current Improvement Standards of the County of San Joaquin. Improvement <br /> plans,specifications, and engineer's estimate prepared by a registered civil engineer shall be submitted <br /> for review and are subject to plan check, field inspection fees and must be approved by the County of <br /> San Joaquin Department of Public Works prior to issuance of the building permit. (Development Title <br /> Section 9-240, Section 9-910,Section 9-1100 and R-92-814). <br /> i. It is the responsibility of the applicant to ensure that a current will serve letter for water and storm drain <br /> service is on file prior to release of building permit. The applicant or subsequent owner of the property <br /> is responsible to ensure there is capacity in the system and that all requirements for the connections <br /> are fulfilled prior to release of the building permit. If any extension, connection, or placement of new <br /> facilities is required to connect to the existing main lines, the cost shall be borne by the applicant. For <br /> any work within the County right-of-way, an improvement plan shall be submitted to Public Works for <br /> review and approval. Required plan check and inspection fees shall apply. <br /> Administrative Use Permit No. PA-2100170—Conditions of Approval 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.