Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for ESCALON UNIFIED SCHOOL DIST as of September <br /> 29, 2021. <br /> Open violations from August 06, 2021 inspection <br /> Violation#716-Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> OBSERVATION: Liquid level sensing devices for the following containers have not been tested: <br /> -10,000 gallon diesel tank <br /> -1000 gallon gasoline tank <br /> -240 gallon used oil tank <br /> -115 gallon transmission oil tank <br /> -115 gallon motor oil tank <br /> REGULATION GUIDANCE: (c)(8)(v)You must regularly test liquid level sensing devices to ensure proper <br /> operation. <br /> CORRECTIVE ACTION: Liquid level sensing devices must be installed in accordance with CFR 112.8 and shall be <br /> regularly tested to ensure proper operation. Immediately conduct all necessary testing of liquid level sensing <br /> devices to ensure proper operation and ensure the SPCC plan discusses testing of liquid level sensing devices. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#721 -Failed to provide corrosion protection for buried piping. <br /> OBSERVATION: The facility failed to provide buried piping with protective wrapping or coating, and to ensure it is <br /> cathodically protected or otherwise satisfies corrosion protection standards for piping. Evidence of buried piping <br /> was observed at the facility for the 10,000 gallon diesel tank and corrosion protection was not addressed in the <br /> SPCC plan. <br /> REGULATION GUIDANCE: (d)(1)Provide buried piping that is installed or replaced on or after August 16, 2002, <br /> with protective wrapping and coating.You must also cathodically protect such buried piping installations or <br /> otherwise satisfy the corrosion protection standards for piping in part 280 of this chapter or a State program <br /> approved under part 281 of this chapter. If a section of the buried line is exposed for any reason, you must carefully <br /> inspect it for deterioration. If you find corrosion damage,you must undertake additional examination and corrective <br /> action, as indicated by the magnitude of the damage. <br /> CORRECTIVE ACTION: Immediately provide the following 10,000 gallon diesel buried piping installed or replaced <br /> on or after August 16, 2002,with a protective wrapping and coating and cathodic protection. Provide proof of <br /> correction to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 8 of 8 <br />