My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 8:18:31 AM
Creation date
8/23/2021 11:07:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0528253
PE
2832
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
01
SITE_LOCATION
1176 STANISLAUS ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ESCALON UNIFIED SCHOOL DIST 1 1176 STANISLAUS ST, ESCALON August 06, 2021 <br /> SPCC Plan Requirements for Onshore Facilities(excluding production facilities) <br /> 720 CFR 112.8(d)(1) Failed to take corrective action on buried piping when exposed for any reason ❑V ❑R ❑COS <br /> 721 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping ■V ■R ❑COS <br /> 722 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 723 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 724 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(4) Failed to conduct integrity and leak testing on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> 727 CFR 112.7(a)(1), Plan failed to adequately describe overfill prevention methods for each container ❑V ❑R ❑COS <br /> 112.8(c)(8) <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation n V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> 4050 See below Unlisted Abandonment/illegal Disposal/Unauthorized Treatment violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) Ed <br /> Item# Remarks <br /> 203 CFR 112.3 Failure to implement the SPCC Plan. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure(SPCC)Plan was not implemented, as <br /> required. <br /> -The SPCC plan states that Appendix E of the plan will be posted next to loading areas.Appendix E, describing <br /> unloading/loading procedures was not seen posted near the loading/unloading areas. <br /> -The SPCC plan calls for spill kits to be placed near the dispensers, spill kits were not observed near the <br /> dispensers. <br /> REGULATION GUIDANCE: 112.3: The owner or operator or an onshore or offshore facility subject to this section <br /> must prepare in writing and implement a Spill Prevention Control and Countermeasure Plan (hereafter"SPCC Plan" <br /> or"Plan")," in accordance with § 112.7 and any other applicable section. 25270.4.5.(a):An owner or operator shall <br /> conduct periodic inspections of the storage tank to ensure compliance with Part 112 (commencing with Section <br /> 112.1)of Subchapter D of Chapter I of Title 40 of the Code of Federal Regulations. In implementing the spill <br /> prevention control and countermeasure plan, an owner or operator shall fully comply with the latest version of the <br /> regulations contained in Part 112(commencing with Section 112.1)of Subchapter D of Chapter I of Title 40 of the <br /> Code of Federal Regulations. <br /> CORRECTIVE ACTION: Implement the SPCC plan, as required. Submit proof of correction to the EHD. <br /> This is a repeat violation, Class ll. <br /> FA0003822 PRO528253 SCO01 08/06/2021 <br /> EHD 28-01 Rev.9/16/2020 Page 4 of 11 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.