My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 8:18:31 AM
Creation date
8/23/2021 11:07:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0528253
PE
2832
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
01
SITE_LOCATION
1176 STANISLAUS ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ESCALON UNIFIED SCHOOL DIST 1 1176 STANISLAUS ST, ESCALON August 06, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 301 CFR 112.5(a), 112.5(b)Failed to amend Plan as necessary. <br /> OBSERVATION: The facility failed to amend the Spill Prevention, Control, and Countermeasure(SPCC) Plan within <br /> six months of when there was a change in design, construction, operation, or maintenance,which affects the <br /> facility's discharge potential. <br /> -The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10,000 gallon <br /> diesel tank is no longer at the site. <br /> -One blue 240 gallon used oil tank was observed outside the diked area and is not included in the SPCC plan <br /> -One grey 115 gallon transmission oil tank and one grey 115 gallon motor oil tank were observed inside the shop <br /> and are not included in the SPCC plan <br /> REGULATION GUIDANCE: (a)Amend the SPCC Plan for your facility in accordance with the general requirements <br /> in § 112.7, and with any specific section of this part applicable to your facility,when there is a change in the facility <br /> design, construction, operation,or maintenance that materially affects its potential for a discharge as described in§ <br /> 112.1(b). Examples of changes that may require amendment of the Plan include, but are not limited to: <br /> commissioning or de commissioning containers; replacement, reconstruction, or movement of containers; <br /> reconstruction, replacement, or installation of piping systems; construction or demolition that might alter secondary <br /> containment structures; changes of product or service; or revision of standard operation or maintenance procedures <br /> at a facility.An amendment made under this section must be prepared within six months, and implemented as soon <br /> as possible, but not later than six months following preparation of the amendment. <br /> (b)Notwithstanding compliance with paragraph (a)of this section, complete a review and evaluation of the SPCC <br /> Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in <br /> operation on or before August 16, 2002,five years from the date your last review was required under this part.As a <br /> result of this review and evaluation,you must amend your SPCC Plan within six months of the review to include <br /> more effective prevention and control technology if the technology has been field-proven at the time of the review <br /> and will significantly reduce the likelihood of a discharge as described in§ 112.1(b)from the facility.You must <br /> implement any amendment as soon as possible, but not later than six months following preparation of any <br /> amendment.You must document your completion of the review and evaluation, and must sign a statement as to <br /> whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. <br /> The following words will suffice, "I have completed review and evaluation of the SPCC Plan for(name of facility)on <br /> (date), and will (will not)amend the Plan as a result." <br /> CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br /> facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br /> This is a repeat violation, Class ll. <br /> FA0003822 PR0528253 SCO01 08/06/2021 <br /> EHD 28-01 Rev.9/16/2020 Page 5 of 11 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.