Laserfiche WebLink
KEYED NOTES GENERAL NOTES lolk <br /> 1. PROVIDE AND INSTALL METAL FRAME AND TWO (2) L A. GENERAL CONTRACTOR TO NOTIFY STARBUCKS <br /> BRACKETS FOR COUNTERTOP SUPPORT AT MASTRENA PROJECT DEVELOPMENT MANAGER IMMEDIATELY IF A <br /> ESPRESSO MAKERS. DISCREPANCY EXISTS BETWEEN CASEWORK SHOP <br /> DRAWINGS, EXISTING SITE CONDITIONS, ARCHITECTURAL <br /> DRAWINGS OR BUILT CASEWORK FIXTURES. GENERAL <br /> CONTRACTOR MUST MAINTAIN ALL"HOLD"TO DIMENSIONS <br /> SHOWN ON PLANS AND SHOP DRAWINGS. <br /> B. STARBUCKS PROJECT DEVELOPMENT MANAGER TO <br /> COORDINATE AND SCHEDULE CASEWORK DELIVERY DATE. <br /> STARBUCKS PROJECT DEVELOPMENT MANAGER TO ©2011 STARBUCKS COFFEE <br /> CONFIRM CASEWORK DELIVERY DATE WITH CASEWORK <br /> MANUFACTURER AT FOUR (4)WEEKS PRIOR AND THEN STARBUCKS COFFEE <br /> ONE (1)WEEK PRIOR TO SCHEDULED DATE OF DELIVERY. <br /> C. STARBUCKS CONTRACTS DIRECTLY WITH CASEWORK COMPANY <br /> VENDOR TO SUPPLY CASEWORK LISTED IN THE 2401 UTAH AVENUE SOUTH <br /> CASEWORK SCHEDULE, UNLESS NOTED OTHERWISE. SEATTLE, WASHINGTON 98134 <br /> D. ALL CASEWORK BOX BASES/TOE KICKS SHALL BE SET (206) 318-1575 <br /> AND LEVELED USING 1/4" (6MM) NON-ABSORBENT PLASTIC THESE DRAWINGS AND SPECIFICATIONS ARE <br /> SHIMS PROVIDED BY CASEWORK VENDOR. CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> E. CASEWORK MANUFACTURER TO ENGINEER PROPER PROPERTY OF STARBUCKS CORPORATION, WHICH IS <br /> COUNTERTOP SUPPORT AT ESPRESSO BAR AND THE OWNER OF THE COPYRIGHT IN THIS WORK. <br /> OTHER WORK STATIONS PER STARBUCKS MINIMUM THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN <br /> PERFORMANCE REQUIREMENTS. PART), SHARED WITH THIRD PARTIES OR USED IN AN <br /> MANNER ON OTHER PROJECTS OR EXTENSIONS TO <br /> THIS PROJECT WITHOUT THE PRIOR WRITTEN <br /> E. SEE WALL FINISH PLAN FOR LOCATION, TAGGING, AND CONSENT OF STARBUCKS CORPORATION. THESE <br /> FINISH SCHEDULES OF APPLIED WALL TREATMENTS. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO <br /> 3'-4" 3'-0" 9'- 8 1/2" EXPRESS DESIGN INTENT FOR A PROTOTYPICAL <br /> F. SEE REFLECTED CEILING PLAN FOR CASEWORK SOFFIT STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE <br /> LOCATIONS. AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE <br /> CONDITIONS. NEITHER PARTY SHALL HAVE ANY <br /> G. CASEWORK VENDOR TO PROVIDE ALL SHOP DRAWINGS OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT <br /> TO STARBUCKS DESIGN MANAGER AND ARCHITECT OF STATED ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> RECORD FOR REVIEW PRIOR TO MANUFACTURE. FULLY EXECUTED BY BOTH PARTIES. <br /> ❑ I. REFERENCE PLUMBING AND ELECTRICAL PLANS FOR <br /> PLACEMENT OF ELECTRICAL, DATA, AND PLUMBING ON ARCHITECT OF RECORD <br /> FRONT AND BACKLINE OF BAR. o -m <br /> - - - - - - - - U C > .0 <br /> i� 2 �i J. ALL BAR COUNTERTOPS AND RETAIL FLOOR = > o <br /> CONDIMENT COUNTERS UTILIZED FOR CUSTOMER <br /> C> ILL <br /> TRANSACTIONS SHALL BE INSTALLED AT A C <br /> - - _ — _ _ _ 4L = = = = = = = = A U)i _J - - - MAXIMUM HEIGHT OF 2'-10" (860 MM)AFF. <br /> -----� O O <br /> p \ J K. INSTALL CASEWORK, COUNTERTOPS, CUBBIES, SHELVES, mcg arch i t e c u r e <br /> U --- FINISHES, TRIM, AND TABLETOPS THROUGHOUT. <br /> 06 REFERENCE FINISH SCHEDULE AND MANUFACTURER'S 15635 Alton Parkway, Suite 100, Irvine, .4 97056 <br /> O <br /> SPECIFICATIONS FOR ADDITIONAL INFORMATION. P:949.553.1117 F: 949.474.7056 <br /> L. DO NOT CAULK TRASH RINGS TO COUNTERTOPS. ARCHITECT STAMP <br /> �asED ARc <br /> 00 N <br /> N - v� AGE Wr <br /> 00 '; c n <br /> 0X0 - 1839 <br /> Cf) 1 <br /> I <br /> 00 <br /> N 1 F CALIF-() <br /> m <br /> i <br /> i <br /> � Q <br /> U II I <br /> � III ° <br /> ` 6 6„ _ , <br /> N u �_ <br /> . <br /> 1 7 > QD <br /> Qti <br /> LU L <br /> (6 <br /> o w U 17)� _ a,_ _ , <br /> ail 1 / 2'-6 Q <br /> J > U O <br /> 1/2„ <br /> z � <br /> w V wU U <br /> 06 \ O O 2 p <br /> / 1 STORE #: 8981 <br /> 00 �? / 1 i <br /> opo / I / I / PROJECT #: 23870-070 <br /> / I <br /> CASEWORK CONCEPT: <br /> U)I / 1 / I I 1 �ti _ J ISSUE DATE: 02-23-2021 <br /> 1 _ - - � PROGRAM MANAGER: <DESIGN MANAGER> <br /> 00 <br /> N I STORE DESIGNER: JESSICA RAMOS <br /> LEED(j)AP: N/A <br /> CHECKED BY: <CHECKED BY> <br /> N_ <br /> MCG PROJECT#: <br /> MCG PROJ. MANAGER: <br /> (n MCG PROJ. SPECIALIST: <br /> O <br /> 1 1 <br /> O 14 2„ <br /> Revision Schedule <br /> NRev Date By Description <br /> O <br /> N <br /> z <br /> SHEET TITLE: <br /> G_ <br /> ENLARGED CASEWORK <br /> N <br /> PLAN <br /> SCALE:AS SHOWN <br /> 1ST FLOOR — ENLARGED CASEWORK PLAN SHEET NUMBER: <br /> CN <br /> Scale: 1/2" = V-0" <br /> co <br /> 1102B <br />