Waste Management Plan Report
<br /> General Order No. R5-2013-0122,Attachment B
<br /> C. PROCESS WASTEWATER(NORMAL PRECIPITATION WITH 1.5 FACTOR)
<br /> 3,200,000 3,200,000
<br /> 2,999,313
<br /> 2,800,000 2,800,000
<br /> c 2,400,000 2,285,655 2,400,000
<br /> 4)
<br /> Q
<br /> y 2,000,000 2,000,000
<br /> rn
<br /> m
<br /> L
<br /> N
<br /> 1,600,000 1,600,000
<br /> d
<br /> Q
<br /> = 1,200,000 1,200,000
<br /> 887,825
<br /> R
<br /> rn 800,000 800,000
<br /> 400,000 376,800 400,000
<br /> 0 0
<br /> 0 0
<br /> Direct Rainfall Rainfall Runoff Into Tailwater Returned Manure and Milkbarn Fresh Water In
<br /> Onto Pond(s) Pond(s) To Pond Bedding Wastewater Flush Lanes
<br /> Values shown in chart are approximate values for storage period.
<br /> Storage period: 120 days
<br /> Total process wastewater generated daily: 54,580 gallons/day
<br /> Total process wastewater generated per period: 6,549,593 gallons/storage period
<br /> Total process wastewater removed due to evaporation: 298,926 gallons/storage period
<br /> Total storage capacity required: 6,250,667 gallons
<br /> 835,593 cu.ft.
<br /> Existing storage capacity(adjusted for dead storage loss): 6,794,945 gallons
<br /> 908,352 cu.ft.
<br /> Considering factored precipitation, existing capacity meets estimated storage needs: [X)Yes [ ) No
<br /> Mello Ranch 127181 E Carter RD I Escalon,CA 95320 1 San Joaquin County I San Joaquin River Basin
<br /> 07/29/2021 11:42:02 Page 11 of 21
<br />
|