Waste Management Plan Report
<br /> General Order No. R5-2013-0122,Attachment B
<br /> D. STORAGE VOLUME ASSESSMENT(NORMAL PRECIPITATION WITH 1.5 FACTOR)
<br /> 7,000,000 6,794,945 7,000,000
<br /> 6,250,667
<br /> 6,000,000 6,000,000
<br /> 0 5,000,000 5,000,000
<br /> t
<br /> CL
<br /> 4,000,000 4,000,000
<br /> `o
<br /> i 3,000,000 3,000,000
<br /> m
<br /> Q
<br /> 2,321,636 2,285,655
<br /> N
<br /> 0 2,000,000 2,000,000
<br /> R
<br /> 01
<br /> 1,000,000 1,000,000
<br /> 376,800
<br /> 136,145
<br /> 0 0
<br /> Barn Direct Rainfall Rainfall 25 Year/24 25 Year/24 Manure and Total Total Existing
<br /> Wastewater, Onto Pond(s) Runoff Into Hour Storm Hour Storm Bedding Required Capacity
<br /> Fresh Flush, Pond(s) Onto Pond Runoff Capacity
<br /> etc.
<br /> Values shown in chart are approximate values for storage period.
<br /> Storage period: 120 days
<br /> Barn wastewater,fresh flush water, and tailwater: 376,800 gallons/storage period
<br /> Manure and bedding sent to pond: 2,285,655 gallons/storage period
<br /> Precipitation onto pond: 751,680 gallons/storage period
<br /> Precipitation runoff: 2,321,636 gallons/storage period
<br /> 25 year/24 hour storm onto pond: 136,145 gallons/storage period
<br /> 25 year/24 hour storm runoff: 677,677 gallons/storage period
<br /> Residual solids after liquids have been removed (liquid equivalent): 240,919 gallons/storage period
<br /> Total process wastewater removed due to evaporation: 298,926 gallons/storage period
<br /> Total required capacity: 6,250,667 gallons/storage period
<br /> Total existing capacity: 6,794,945 gallons/storage period
<br /> Existing capacity meets estimated storage needs: [X]Yes [ ] No
<br /> Mello Ranch 127181 E Carter RD I Escalon,CA 95320 San Joaquin County I San Joaquin River Basin
<br /> 07/29/2021 11:42:02 Page 12 of 21
<br />
|