My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1024
>
1600 - Food Program
>
PR0161745
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 2:55:36 PM
Creation date
9/8/2021 3:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161745
PE
1626
FACILITY_ID
FA0000130
FACILITY_NAME
HABANERO HOTS
STREET_NUMBER
1024
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905036
CURRENT_STATUS
01
SITE_LOCATION
1024 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPARTAN <br /> WEST <br /> Wood BeamHospitality& <br /> Software copyright ENERCALC,INC.1983-2020,BuiId:12.20.8.24 _ <br /> Lic.#:KW-06011515 Ward EngineeringFood <br /> DESCRIPTIO BEAM SUPPORTING CEILING IN KITCHEN FRAMED WITH STEEL CHANNEL _ <br /> FBCIIItIeS <br /> WARD ENGINEERING CODE REFERENCES <br /> Calculations per NDS 2018, IBC 2018, CBC 2019,ASCE 7-16 WARD ENGINEERINGLLc Design <br /> Load Combination Set :ASCE 7-16 <br /> Material Properties <br /> Analysis Method Allowable Stress Design Fb+ 875 psi E:Modulus of Elasti <br /> February 17, 2021 Load Combination ASCE 7-16 Fb- 875 psi Ebend-xx 1300 ksi 403 South Sacramento St <br /> Fc-Prll 600 psi Eminbend -x 470 ksi Lodi CA 95240 <br /> Wood Species Douglas Fir-Larch Fc-Perp 625 psi February 17, 2020 <br /> Wood Grade No.2 Fv 170 psi W 209.426.5982 <br /> RESPONSE TO COMMENTS Ft 425 psi Density 31.21 pcf To Whom It May Concern: <br /> Beam Bracing Beam is Fully Braced against lateral-torsional buckling C 209-210-0219 <br /> This is to certify the structural adequacy of the 15'-long 6x8 beam in the kitchen of the email: <br /> Bob Vrabel D(0.0864) for the Habanero Hots Restaurant at 1024 E Victor Road Lodi, Ca 95240. As the Engineer of spartanwest23@gmail.com <br /> City of Lodi Record, I have reviewed the beam and provided supporting calculations, which are attached to <br /> Community Development Department this letter. REVISION DATE <br /> Building&Safety Division 6x8 Please contact me should you have any further questions, comments, or concerns regarding 1.1 10.23.20 2.4 <br /> 221 W Pine Street <br /> this matter. <br /> 1.2 10.29.20 2.0 <br /> Lodi, Ca 95241-1910 spar, _ ,soft <br /> (209)333-6714 L <br /> �- Sincerely, <br /> 1.4 11 .04.20 .5 <br /> 1.5 11 .01.20 .5 <br /> Dear Mr.Vrabel, Applied Loads Service loads entered.Load Factors will be applied for calculations. <br /> ht calculated and added to loads / �._- 1.6 11 .11 .20 1 . <br /> This is to address the plan check comments provided on 2/4/21 for the Habanero Hots Restaurant at 1024 E Victor Road Lodi,Ca, Beam self weight <br /> application#2021-0004. Uniform Load : D=0.00480 ksf, Tributary Width = 18.0 ft, (CEILING LOAD) Matthew Ward, PE 1.7 11 .14.20 1 . <br /> DESIGN SUMMARY MEMSM Principal Engineer 1.8 11 .21.20 3.25 <br /> Structural Comments Maximum Bending Stress Ratio = 0.792 1 Maximum Shear Stress Ratio = 0.156 : 1 209.263.1382 1.8 11 .22.20 2.6 <br /> Section used for this span 6x8 Section used for this span 6x8 <br /> S1. Regarding the(E) 6x8 beam shown on sheet FS-1.3: fb:Actual = 624.05 psi fv:Actual = 23.91 psi mward@wardeng.net <br /> 1.9 11 .27.20 2.0 <br /> Fb:Allowable = 787.50 psi Fv:Allowable = 153.00 psi <br /> a. The location of the 6x8 beam with steel channel has been added to the roof plan. Load Combination +D+H Load Combination +D+H �OFE 1.11 12.03.20 3.0 <br /> Location of maximum on span = 7.500ft Location of maximum on span = 14.398 ft w 1.12 02.17.21 3.0 <br /> b. The tributary loads on the 6x8 beam have been added to the roof plan.The 6x8 beam supports only 2x8 ceiling Span#where maximum occurs = Span# 1 Span#where maximum occurs = Span# 1 <br /> joists @ 16"OC with attached%2"gypsum board. Maximum Deflection 74034 T� 1.13 03.03.21 3.0 <br /> Max Downward Transient Deflection 0.000 in Ratio= 0<180 EXP. .*� <br /> c. The beam calculation deflection readings are mis-leading.Although the deflection ratios appear red in the enercalc Max Upward Transient Deflection 0.000 in Ratio= 0<180 �r clo. <br /> output report,the deflection ratios are acceptable.The outputs appear red because the live load deflection is Max Downward Total Deflection 0.435 in Ratio= 414>=120 q'FoFCAUFc#'a <br /> Max Upward Total Deflection 0.000 in Ratio= 0<120 - <br /> actually 0", because the beam does not support any live load.The beam only supports ceiling dead load.The wood <br /> Vertical Reactions Support notation : Far left is#' Values in KIPS <br /> beam can resist the imposed dead loads without the added capacity of the steel channel. Load Combination Support 1 Support 2 <br /> d. The(3)2x6 DF#2 studs at each end of the beam are existing,while the steel channels are new.The studs and Overall MAXimum 0.715 0.715 <br /> Overall MINimum 0.715 0.715 <br /> channels have been annotated in Figure 1: Kitchen Beam Schematic. +D+H 0.715 0.715 <br /> +D+L+H 0.715 0.715 <br /> e. Details of the requested connections are now included in Figures 1, 2 and 3 of the structural report. +D+Lr+H 0.715 0.715 <br /> +D+S+H 0.715 0.715 <br /> Please contact me should you have any questions regarding this matter. +D+0.750Lr+0.750L+H 0.715 0.715 <br /> +D+0.750L+0.750S+H 0.715 0.715 DOUBLE TOP PLATE W <br /> Sincerely, +D+0.60W+H 0.715 0.715 l Q <br /> +D-0.60W+H 0.715 0.715 <br /> +D+0.750Lr+0.750L+0.450W+H 0.715 0.715 <br /> +D+0.750Lr+0.75OL-0.450W+H 0.715 0.715 1 _ a O <br /> +D+0.750L+0.750S+0.450W+H 0.715 0.715 / <br /> +D+0.750L+0.750S-0.450W+H 0.715 0.715 <br /> TOP PLATE t M <br /> CRIPPLES ON HEADERUJ <br /> (209) 263-1382 • mward@wardeng.net • wardeng.net • PO Box 386 Herald,CA 95638 WALL-STUD LAYOUT '� U <br /> COMMON STUDS � Z Q <br /> _ TRIMMER STUD O W <br /> TRIMMER = T J <br /> WARD ENGINEERINGuc <br /> KING STUD :o ROUGH DOOR _ <br /> E_ OPENING HEIGHT O z <br /> _ w � <br /> WARD ENGINEERINGuc ROUGH DOOR OPENING <br /> � 1 <br /> OPENING WIDTH Y.1 <br /> 5'-0" Z z O <br /> BOTTOM PLATE < Wou <br /> (N) HORIZONTAL (N) VERTICAL <br /> SUBFL00R <br /> CONNECTED(N) C7x14.7 CHANNEL CHANNEL IS CHANNEL IS 6-16 <br /> • CONNECTED TO <br /> LAG r THE (E) 2x6 STUD ELEVATION VIEW 1/2"SCALE W r <br /> BOLTS • . • <br /> OPENING IN SOUTH WALL TO ACCESS WALK-IN <br /> r TO PLATE) <br /> V <br /> W <br /> J <br /> Figure 4:Channel Connection Schematic LU <br /> PLATE <br /> Figure 2:Steel Post Base Connection <br /> NOTICE: <br /> DISCLAIMER NOTIFICATION <br /> 7"STRUCTURAL <br /> (E) 6X8 DF BEAM- STEEL 14.75 LBS/FT <br /> C7x14.7 CHANNELMeasurements on these <br /> drawings have been <br /> •- • secured by SPARTAN WEST <br /> from information provided. <br /> PLAN VIEW 1/4"SCALE SPARTAN WEST assumes <br /> no responsibility for the <br /> (N) 1/8" FILLET WELD (E) 6X8 DF BEAM accuracy of such <br /> TO <br /> measurements. <br /> All contractors,sub-contractors, <br /> fabricators that will utilize this <br /> food facility design will be <br /> • : ,F #21 responsible for the actual <br /> :• • • measurements on the job site <br /> ng <br /> � _ CHANNEL .0 and must verify any dimension <br /> utilized concerning the scope <br /> .rr , <br /> of work <br /> All indicated electrical outlets, <br /> plumbing,and equipment <br /> (N) C7x14.7 CHANNELd 2] <br /> specifications are for the sole <br /> se of <br /> 4� <br /> r (VERTICAL) •) Liij STRUCTURAL requirements ements for the food <br /> CHANNEL, . �Q equipment.SPARTAN WEST <br /> is not responsible for the <br /> 1 <br /> engineering,or installation <br /> Figure 3: Vertical Channel to Horizontal Channel Connection MW of indicated equipment. <br /> STUDS (TOT 3 <br /> DATE: 02.09.21 <br /> TYP <br /> Figure 1:Kitchen Beam Schematic LJ <br /> ELEVATION VIEW 1/4"SCALE SCALE: 1/4 <br /> BEAM SUPPORTING CEILING IN KITCHEN FRAMED WITH STEEL CHANNEL DRAWN BY AD <br /> Ward Flood Services www.wardeng.net Ward Structural Ward Flood Services www.wardeng.net Ward Structural <br /> SHEET. FS-1.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.