Laserfiche WebLink
Fast Lane Central Valley, 116 ROTH RD, LATHROP, CA 95330 Amended - SR0072634 <br />Please be aware that the facility cannot receive fuel in the tank prior to the EHD <br />inspection and approval. <br />4. If concrete will be broken near the tank, a secondary containment test must be <br />performed on the tank once concrete is poured in accordance with the manufacturer's <br />guidelines. <br />5. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />b. A valid, current California UST Service Technician certificate issued by the <br />International Code Council (ICC), and <br />c. A valid, current certificate of training from the manufacturer(s) of the component(s) <br />being tested, repaired, or serviced. <br />6. Qualified installers must possess or work under the direct and personal supervision of an <br />individual physically present at the work site who possesses all of the following: <br />a. A valid, current contractor's license issued by the Contractors State License Board, <br />and <br />b. A valid, current certificate of training from the m-anufacturer(s) of the component(s) <br />being installed, and <br />c. A valid, current UST Installation/Retrofitting certificate issued by the International <br />Code Council (ICC). <br />7. The tank owner or operator shall log into the California Environmental Reporting System <br />(CERS) at http://cers.calepa.ca.gov/ and ensure all UST information is current. <br />8. All components must be certified by an independent testing organization and labeled as <br />required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br />Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br />9. Permit expires 180 days from the date of approval. If an extension to the expiration date <br />is required, a written request must be submitted to this office prior to the expiration date. <br />If you have any further questions, please contact me at (209) 953-7699. <br />Thank you, <br />Elena Manzo, REHS <br />Senior Registered Environmental Health Specialist <br />cc: Fast Lane Central Valley LLC, 111 Healdsburg Ave, Healdsburg 95448 <br />2 <br />