My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 2:59:02 PM
Creation date
9/10/2021 4:32:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Name: 'ac ty Fast Lane Central Valley LLC <br />Fadd�e s: 116 East Roth Road, Lathrop <br />Dateection Sep 11, 2013 <br />By: <br />VIOLATIONS <br /># <br />C1 <br />C2T <br />M <br />Code Section <br />HSC = CA Health and Safety Code; CFR = Code of Federal Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br />Non -Pressurized Piping (continued) <br />702 <br />CCR 2643(e) Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (M1) <br />703 <br />oo., nn110110 U <br />CCR 2643(d) Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M1) <br />Other Violations <br />999 Other: See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />UST Compliance Inspection with unresolved violations from July 2013 & June 2012 inspection reports <br />Class Ill Repeat Violations: 104,109,110,111,201,203,204,205,206,311,402 <br />104. Financial responsibility documents have not been submitted to the EHD for the 2013 year nor for <br />2012, and 2011 year. Current financial responsibility documents are required to be submitted annually. <br />Immediately submit a copy of the financial responsibility documents to the EHD. Alternatively, log into <br />CERS, upload the required information, and submit for review by the EHD. <br />- CERS stated a copies were: Provided to Regulator. EHD received Letter from Chief Financial Officer <br />on August 8, 2013. No Letters from CFO have been received for 2012 and 2011 year. No Certification of <br />Financial Responsibility have been received for 2011, 2012 and 2013 year. <br />109, 110, & 111. During the inspection in June 2012, it was observed that the annual monitoring system <br />certification, leak detector testing, and spill container testing were last performed on June 20, 2012 and <br />was completed on July 9, 2013, one month past due. The two May 2013 Designated Operator (auto and <br />truck side) monthly visual inspection reports noted "AMC & Spill containment test time due next month <br />06/20/13". The two June 2013 Designated Operator (auto and truck side) monthly visual inspection <br />report noted "AMC & Spill Containment tests scheduled - 07/09/13". These tests are required once every <br />12 months. The Designated Operator had provided a written statement a month prior to due date that <br />test is due. Take all necessary precautions to ensure testing is performed in a timely manner. Submit a <br />written statement how to ensure testing is performed on time. <br />- The written corrective action statement received on August 8, 2013 documented incorrectly the test <br />date. Please revise the document to reflect correct test date on the corrective action statement. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector.Received <br />By: <br />Title: <br />_un 01 no <br />oo., nn110110 U <br />nicorrnnni Orono <br />
The URL can be used to link to this page
Your browser does not support the video tag.