Laserfiche WebLink
Nitrate Loading Analysis BSK Job E21-002-01B <br />2482 Carpenter Road July 13, 2021 <br />Stockton, California P a g e | iii <br /> <br /> <br />TABLE OF CONTENTS <br />1. INTRODUCTION...................................................................................................................1 <br />1.1 Site and Surrounding Area ..................................................................................................................... 1 <br />1.2 Data Gaps .............................................................................................................................................. 2 <br />2. CHEMICAL AND PHYSICAL PROPERTIES OF SOIL .................................................................3 <br />3. GROUNDWATER ANALYSIS .................................................................................................3 <br />3.1 Description of Groundwater Based on Publicly Available Groundwater Data .......................................... 3 <br />3.2 Groundwater Quality Data: .................................................................................................................... 4 <br />3.3 Current Groundwater Use at the Site: .................................................................................................... 4 <br />4. SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER .............................4 <br />4.1 Current Off-Site Sources of Nitrate to Soil and Groundwater in General Up Gradient Area:..................... 4 <br />4.2 Impact of Rainfall Contribution of Nitrate Load to Project Site: ............................................................... 4 <br />4.3 Current On-Site Sources of Nitrate to Soil and Groundwater: ................................................................. 5 <br />4.4 Proposed Future On-Site Sources of Nitrate to Soil and Groundwater: ................................................... 5 <br />4.5 Mass Balance of Nitrogen Loading Using Hantzsche and Finnemore Calculation: .................................... 6 <br />4.6 Impact of Nitrogen Loading from Site Project to Downgradient Wells, Rivers, etc.: ................................. 8 <br />5. DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD OF <br />WASTEWATER DISPOSAL ............................................................................................................8 <br />5.1 Total Nitrate Impact from Proposed Project: .......................................................................................... 8 <br />5.2 Proposed Mitigation Methods for Nitrate-Nitrogen to Soil and Groundwater: ........................................ 8 <br />6. CONCLUSIONS AND RECOMMENDATIONS .........................................................................9 <br />6.1 Conclusions and Recommendations: ...................................................................................................... 9 <br />7. CLOSING ............................................................................................................................10 <br />8. REFERENCES ......................................................................................................................10 <br /> <br />TABLES <br />Table 1: Input Values and Source of Average Nitrate-Nitrogen Concentration in Recharge Water <br /> <br />FIGURES <br />Figure 1A: Site Vicinity Map <br />Figure 1B: Site Septic Map <br />Figure 2: Ground Water Contour Map <br /> <br />APPENDICES <br />Appendix A: National Oceanic & Atmospheric Administration Climatic Data <br />Appendix B: Site Construction Plans, AECOM <br />Appendix C: Jacktone Clay Soil Description <br />Appendix D: Water Quality Data from USGS Well - Site Number: 375545121141601 Site Name: <br />001N007E17N001M <br /> <br />