My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014343
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVONE
>
6820
>
2600 - Land Use Program
>
PA-2100164
>
SU0014343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 10:57:59 AM
Creation date
9/20/2021 10:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014343
PE
2626
FACILITY_NAME
PA-2100164
STREET_NUMBER
6820
Direction
E
STREET_NAME
NAVONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
10112031
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
6820 E NAVONE RD
RECEIVED_DATE
5/12/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 1 The purpose of this procedure is to detail the process of JKL ` s Cultivation Departments onsite <br /> wastewater collection , and disposal process . <br /> 2 .0 Scope <br /> 2 . 1 The extent of this procedure includes , but is not limited to , the Cultivation Department at JKL ' s <br /> cultivation facility . <br /> 10 <br /> 4 .0 <br /> 5 .0 Wastewater Collection Process <br /> 5 . 1 Before watering , the lead cultivation technician must always place a wastewater receptacle <br /> underneath the drainage grate located at the end of each cultivation tray <br /> 5 .2 After placing the Primary Wastewater Receptacle underneath the drainage grate at the end of each <br /> cultivation tray/table , locate , and transport the Mobile Wastewater Receptacle into the cultivation <br /> room that you are about to water <br /> 5 . 3 The lead cultivation technician will begin to water one cultivation tray/table at a time , while <br /> another cultivation technician observes the Primary Wastewater Receptacle that is located <br /> underneath the drainage grate of the cultivation tray/table that is being watered <br /> 5 .4 The cultivation technician who is operating the Mobile Wastewater Receptacle , observes the <br /> Primary Wastewater Receptacle that is collecting the wastewater from the cultivation tray/table <br /> being watered by the lead cultivation technician <br /> 5 .5 As the Primary Wastewater Receptacle begins to fill , the cultivation technician who is operating <br /> the Mobile Wastewater Receptacle places the pump that is connected to the Mobile Wastewater <br /> receptacle inside of it , and begins to pump the wastewater into the Mobile Wastewater Receptacle <br /> 6 .0 <br /> s k <br /> v�v� �`E <br /> AT � R <br /> 6 . 1 Once all wastewater has been drained from the tray/table that the lead cultivation technician has <br /> just watered , repeat steps 4 . 3 through 4 . 5 , until all cultivation trays/tables within the cultivation <br /> unit have been adequately watered <br /> JKL SUNSHINE CORPORATION 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.