Laserfiche WebLink
6 .2 After the watering process is complete , and all wastewater has been collected into the Mobile <br /> Wastewater Receptacle , transport the Mobile Wastewater Receptacle to the onsite Stationary <br /> Wastewater Receptacle <br /> 6 . 3 Place the pump connected to the Mobile Wastewater Receptacle into the Stationary Wastewater <br /> Receptacle <br /> 6 .4 Pump all wastewater from Mobile Wastewater Receptacle into the Stationary Wastewater <br /> Receptacle <br /> 7 .0 <br /> I <br /> t <br /> I <br /> ; I <br /> 4k <br /> L <br /> G✓,gSTE - � <br /> WATER <br /> r-h <br /> 8 .0 <br /> 8 . 1 Observe the Stationary Wastewater Receptacle to determine the capacity that is available after <br /> filling the Stationary Wastewater Receptacle with the wastewater from that days watering <br /> 8 .2 Once the Stationary Wastewater Receptacle has reached 350 gallons , contact the local waste <br /> management service to pump and remove the contents of the Stationary Wastewater Receptacle <br /> Pesticide / Chemical Storage : <br /> Fertilizers utilized in the operation will be stored inside of lockable metal cabinets within the <br /> Pesticide/ Chemical / Non - Cannabis Storage Room within Building 4 . The cabinets will remain <br /> locked , except when necessary to access supplies for pesticide application . <br /> JKL SUNSHINE CORPORATION 16 <br />