Laserfiche WebLink
The following is an itemized list of hazardous materials violations that have not been <br /> addressed for MANTECA CHEVRON as of December13 , 2021 . <br /> Open violations from September 23 , 2021 inspection <br /> Violation #2 - Failed to initially complete and electronically submit a HMBP . <br /> OBSERVATION A complete Hazardous Materials Business Plan was not submitted electronically to the California <br /> Environmental Reporting System ( CERS) . <br /> REGULATION GUIDANCE: As of January 1 , 2013 , all businesses were required to submit all business plans <br /> electronically . <br /> CORRECTIVE ACTION : Immediately log into the CERS at http : //cers. calepa , ca , gov/, enter the correct or updated <br /> information , and submit to the EHD for approval . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #3 - Failed to establish and implement a hazardous materials business plan . <br /> OBSERVATION A Hazardous Materials Business Plan has not been established or implemented . <br /> REGULATION GUIDANCE: A Hazardous Materials Business Plan ( HMBP ) shall be established and implemented <br /> for emergency response to a release or threatened release of a hazardous material when storing hazardous <br /> materials at or above the thresholds quantities of 55 gallons for materials that are liquids , 500 pounds for solids , or <br /> 200 cubic feet for compressed gas , at standard temperature and pressure . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS ) at <br /> http : //cers . calepa , ca . gov/ , enter the required information , and submit for review by the EHD . /Submit a <br /> statement/documentations to SJC EHD demonstrating that the HMBP has been established and implemented . <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #6 - Failed to electronically submit a site map with all required content. <br /> OBSERVATION A site map was not completed and submitted as part of the business plan . <br /> REGULATION GUIDANCE: Asite map shall contain a north orientation , loading areas , internal roads , adjacent <br /> streets , storm and sewer drains , access and exit points , emergency shutoffs , evacuation staging areas , hazardous <br /> material handling and storage areas , and emergency response equipment. <br /> If a site map element is not applicable for your facility then list it on the map and label as " NA" . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS ) at <br /> http : //cers . calepa . ca . gov/, upload the correct or updated information , and submit to the EHD for approval . <br /> Page 1 of 4 <br />