KEYED NOTES GENERAL NOTES
<br /> ODEMOLISH INTERIOR WALLS AS INDICATED, ALL A. IF DURING DEMOLITION CONDITIONS ARE REVEALED
<br /> RESTROOMS, &ALL FURNITURE & FIXTURES. THAT MAY JEOPARDIZE INTEGRITY OF STRUCTURE OR .�
<br /> PRECLUDE FOLLOWING DESIGN INTENT, GENERAL
<br /> ODEMOLISH EXISTING STOREFRONT AND WINDOWS AS CONTRACTOR TO NOTIFY STARBUCKS CONSTRUCTION
<br /> INDICATED. SEE EXTERIOR ELEVATIONS AND SHEET A101 MANAGER IMMEDIATELY.
<br /> FOR MORE INFORMATION.
<br /> B. GENERAL CONTRACTOR IS RESPONSIBLE FOR SITE
<br /> O EXISTINGDEMOLISH BOARD
<br /> STRUCTURAL SUS ENDED SOFFITS, I
<br /> AND LIGHTING SCOPE WORK.GATION NOTIFY DEMOLITION
<br /> Y S ARBUCKS CONSTRUCTION
<br /> THROUGHOUT, AS REQUIRED, FOR NEW MANAGER IF EXISTING CONDITIONS DEVIATE FROM
<br /> CONSTRUCTION. SEE SHEET 1103 FOR NEW CEILING CONSTRUCTION DOCUMENTS. ©2011 STARBUCKS COFFEE
<br /> PLAN DESIGN. SEE ELECTRICAL SHEETS FOR LIGHTING
<br /> DETAILS. C. REMOVE WALL COVERINGS ON EXISTING WALLS TO STARBUCKS COFFEE
<br /> OREMAIN THAT FACE AREAS OF DEMOLITION. REMOVALCOMPANY
<br /> DEMOLISH EXISTING EXTERIOR WALL. SEE SHEET A101 SHALL INCLUDE ANY RESIDUAL MATERIAL AFTER
<br /> FOR PROPOSED LOCATION OF NEW EXTERIOR WALL. DEMOLITION, I.E. PIECES OF WALL COVERING OR
<br /> BACKING. REMOVAL OF ALL COVERINGS IS TO BE DONE 2401 UTAH AVENUE SOUTH
<br /> ODEMOLISH INTERIOR STAIRCASE TO BASEMENT LEVEL. W/O DAMAGING THE EXISTING WALL SURFACE TO SEATTLE, WASHINGTON 98134
<br /> NEW FLOOR TO BE LEVEL AND MATCH EXISTING. SEE REMAIN. ALSO REMOVE WALL DEVICES AND ITEMS 206 318-1575
<br /> STRUCTURAL DRAWINGS FOR MORE INFORMATION. MOUNTED TO WALLS.
<br /> D. REMOVE ALL FLOOR MATERIALS INCLUSIVE OF SETTING THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> BEDS, SUBFLOOR MATERIAL ETC. REMOVE MASTIC TO CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> PROVIDE A CLEAN FLOOR THAT IS ACCEPTABLE TO THE PROPERTY OF STARBUCKS CORPORATION, WHICH IS
<br /> SUBCONTRACTOR INSTALLING NEW FINISH MATERIAL. THE OWNER OF THE COPYRIGHT IN THIS WORK.
<br /> THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN
<br /> p E. DEMOLITION PLANS REPRESENT APPROXIMATE PART), SHARED WITH THIRD PARTIES OR USED IN AN
<br /> LOCATION OF EXISTING WALLS TO BE DEMOLISHED. MANNER ON OTHER PROJECTS OR EXTENSIONS TO
<br /> C) THIS PROJECT WITHOUT THE PRIOR WRITTEN
<br /> m FIELD VERIFY TYPE OF CONSTRUCTION AND HEIGHT OF CONSENT OF STARBUCKS CORPORATION. THESE
<br /> N WALLS. PLANS DO NOT NECESSARILY INDICATE ALL DRAWINGS AND SPECIFICATIONS ARE INTENDED TO
<br /> Q DEMO WALLS, COUNTERS, HANDRAILS, WALL EXPRESS DESIGN INTENT FOR A PROTOTYPICAL
<br /> PROTECTION, CLOSETS, SINKS ETC. PRIOR TO STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE
<br /> DEMOLITION, FIELD VERIFY THAT WALLS TO BE AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE
<br /> 06 REMOVED DO NOT PROVIDE SUPPORT FOR EXISTING CONDITIONS. NEITHER PARTY SHALL HAVE ANY
<br /> U BUILDING ELEMENTS AND EXISTING CONSTRUCTION TO OBLIGATION NOR LIABILITY TO THE OTHER(EXCEPT
<br /> U REMAIN. NOTIFY STARBUCKS CONSTRUCTION STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> a MANAGER IF DEMOLITION WALLS SUPPORT EXISTING FULLY EXECUTED BY BOTH PARTIES.
<br /> BUILDING ELEMENTS.
<br /> 0
<br /> F. DEMOLISH AND REMOVE DOORS, VINYL BASE, CONDUIT, ARCHITECT OF RECORD
<br /> U-) WIRING, DUPLEXES, DATA OUTLETS, CABLES, SHELVING, o �,
<br /> Xm METAL STUD AND GYPSUM BOARD WALLS, CLOSETS,
<br /> CABINETS, FILES, COUNTERS, WOOD MOLDING, = > o •
<br /> SHELVES AND ENCLOSURES WHERE APPLICABLE.
<br /> f
<br /> G. VERIFY WITH STARBUCKS CONSTRUCTION MANAGER N
<br /> o0 ACCESS TO THE DEMOLITION AREA, INGRESS AND
<br /> Oil
<br /> EGRESS ROUTES FOR MATERIAL AND EQUIPMENT. m c g a r c h i t e c u r e
<br /> N
<br /> 0o H. PROTECT EXISTING FLOORS, WALLS AND CORNERS TO 15635 Alton Parkway, Suite 100, Irvine, CA 92618
<br /> cV REMAIN ALONG WORK ACCESS ROUTES. P:949.553.1117 F:949.474.7056
<br /> p I 1. CONTAIN DUST AND DEBRIS WITHIN THE DEMOLITION ARCHITECT STAMP
<br /> U �-� I I i i i i i i i i i i i i i i i AREA. ED A
<br /> SC
<br /> 0
<br /> F GE WIN
<br /> \\ J. THE GENERAL CONTRACTOR SHALL PERFORM WORK IN C) P kl�
<br /> CY) A MANNER THAT DOES NOT DAMAGE THE EXISTING 'A
<br /> N
<br /> STRUCTURE. DEMOLITION SHALL NOT COMPROMISE ..
<br /> LL THE STRUCTURAL INTEGRITY OF ANY WALLS, FLOORS, 1839
<br /> CEILINGS, SUPPORTS, STRUCTURE, ETC. TO REMAIN. 9� 1
<br /> a II �
<br /> U) r K. ALL DEMOLITION MATERIALS AND DEBRIS SHALL BE ��~P
<br /> N r -r� T-T DISPOSED OF ACCORDING TO FEDERAL, STATE AND F CALIFO
<br /> U) LOCAL REGULATIONS.
<br /> II II
<br /> L. AT LOCATIONS WHERE EXISTING WALLS ARE TO BE
<br /> --- ---- �/ L REMOVED NEAR EXISTING WALLS TO REMAIN,
<br /> ' --i II ` + ^ F -�T PERFORM DEMOLITION WITHOUT DISTURBING EXISTING
<br /> _tet
<br /> I /\ /\ �� ELEMENTS TO REMAIN. WALLS TO REMAIN SHALL BE
<br /> \ II �°
<br /> U INTACT AND HAVE A NEAT SURFACE.
<br /> A I i � I i � II i � II I�-
<br /> `�� j M. REFER TO "ITEMS TO BE PRESERVED" LIST FOR ITEMS
<br /> v THAT SHALL BE SALVAGED FOR RELOCATION. VERIFY
<br /> L 1, WITH OWNER FOR ON SITE STORAGE LOCATION OF
<br /> Q
<br /> N SALVAGED ITEMS. W
<br /> CD
<br /> rN. DAMAGED FIREPROOFING SHALL BE REPAIRED/ J
<br /> z REPLACED TO MATCH EXISTING. (V
<br /> _ f-----------------� rr�l
<br /> Lo
<br /> U j I\ jj O. THE GENERAL CONTRACTOR SHALL DEMOLISH ANY < LL) m
<br /> I
<br /> ,_j II EXISTING ABANDONED VOICE/DATA CABLING AND DEAD
<br /> C IIIA \�\\ OR NON-USE ELECTRICAL BACK TO PANEL. ALL ` Q Q
<br /> III RECEPTACLES NOT REUSED ARE TO BE REMOVED, ,,����((
<br /> p I III PATCHED AND PAINTED. W U)LU
<br /> _v
<br /> i I-I I I--I II W LL Z
<br /> I II�I P. REMOVAL OF LOW VOLTAGE EQUIPMENT, PERTAINING —
<br /> T ---- -� ---JI III p Q
<br /> TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE Q p U
<br /> III _ VERIFIED BY THE STARBUCKS CONSTRUTION MANAGER ZLL
<br /> Q Q
<br /> III PRIOR TO REMOVAL. SALVAGED EQUIPMENT SHALL BE l-_ l-- 0-
<br /> STORED
<br /> STORED IN A CLIMATE CONTROLLED ENVIRONMENT U U06
<br /> LLJ U
<br /> II j L L J III FOR FUTURE INSTALLATION. LU L _� O
<br /> v J j o Q O
<br /> Q. LABEL ALL ITEMS AND PROPERLY STORE FOR 0� o0/1 a 0
<br /> d \\ - ---� TYPICAL RE-INSTALL. Q_ L.L
<br /> I T - THROUGHOUT --------------------------_j J
<br /> STORE 5470
<br /> I
<br /> X PROJECT #: 03030-052
<br /> m 1 =7 II
<br /> W - CASEWORK CONCEPT: CORE
<br /> -- 5 - ISSUE DATE: CHECKSET 2-10-20
<br /> PROGRAM MANAGER: M.DREBIKA
<br /> 00T
<br /> -- STORE DESIGNER: M.DREBIKA
<br /> LEED�AP: N/A
<br /> 4 -
<br /> CHECKED BY: A.FELDMAN
<br /> X ---=�
<br /> m --- L== ===� LEGEND
<br /> W — ------ -------------- MCG PROJECT#: 18531
<br /> O J L-----------J MATERIAL TO BE DEMOLISHED MCG PROJ. MANAGER: C.LEE
<br /> - MCG PROJ. SPECIALIST: SPARK
<br /> PRESERVE O
<br /> O EXISTING WALLUSE
<br /> TO REMAIN
<br /> 11Revision Schedule
<br /> 00 L
<br /> _-------- Rev Date By Description
<br /> CN
<br /> / --
<br /> III �
<br /> 73 \� SHEET TITLE:
<br /> d
<br /> N ------- ------- I DEMOLITION FLOOR
<br /> PLAN
<br /> N SCALE:AS SHOWN
<br /> CD
<br /> ARCHITECTURAL - DEMOLITION PLAN
<br /> O � SHEET NUMBER:
<br /> co N Scale: 1/4" = V-0"
<br /> N
<br /> C"�
<br />
|