| 
								        																																																						KEYED  NOTES 							GENERAL  NOTES
<br />   																																																						ODEMOLISH INTERIOR WALLS AS INDICATED, ALL			A.   IF DURING DEMOLITION CONDITIONS ARE REVEALED
<br />   																																																							RESTROOMS, &ALL FURNITURE & FIXTURES. 				THAT MAY JEOPARDIZE INTEGRITY OF STRUCTURE OR     							.�
<br />																																																																			PRECLUDE FOLLOWING DESIGN INTENT, GENERAL
<br />   																																																						ODEMOLISH EXISTING STOREFRONT AND WINDOWS AS    		CONTRACTOR TO NOTIFY STARBUCKS CONSTRUCTION
<br />   																																																							INDICATED. SEE EXTERIOR ELEVATIONS AND SHEET A101		MANAGER IMMEDIATELY.
<br />   																																																							FOR MORE INFORMATION.
<br />   																																																																		B.   GENERAL CONTRACTOR IS RESPONSIBLE FOR SITE
<br />   																																																						O 		EXISTINGDEMOLISH     		BOARD
<br />  																																																							STRUCTURAL SUS ENDED SOFFITS,      						I
<br />    																																																													AND LIGHTING			SCOPE     WORK.GATION     NOTIFY DEMOLITION
<br /> 																																																																							Y S ARBUCKS CONSTRUCTION
<br />  																																																							THROUGHOUT, AS REQUIRED, FOR NEW       				MANAGER IF EXISTING CONDITIONS DEVIATE FROM
<br />  																																																							CONSTRUCTION. SEE SHEET 1103 FOR NEW CEILING       		CONSTRUCTION DOCUMENTS.     									©2011 STARBUCKS COFFEE
<br />   																																																							PLAN DESIGN. SEE ELECTRICAL SHEETS FOR LIGHTING
<br />   																																																							DETAILS.    									C.  REMOVE WALL COVERINGS ON EXISTING WALLS TO      				STARBUCKS  COFFEE
<br />   																																																						OREMAIN THAT FACE AREAS OF DEMOLITION. REMOVALCOMPANY
<br />   																																																							DEMOLISH EXISTING EXTERIOR WALL. SEE SHEET A101   		SHALL INCLUDE ANY RESIDUAL MATERIAL AFTER
<br />   																																																							FOR PROPOSED LOCATION OF NEW EXTERIOR WALL.     		DEMOLITION, I.E. PIECES OF WALL COVERING OR
<br />																																																																			BACKING.  REMOVAL OF ALL COVERINGS IS TO BE DONE    				2401  UTAH AVENUE SOUTH
<br />   																																																						ODEMOLISH INTERIOR STAIRCASE TO BASEMENT LEVEL.   		W/O DAMAGING THE EXISTING WALL SURFACE TO  					SEATTLE, WASHINGTON 98134
<br />   																																																							NEW FLOOR TO BE LEVEL AND MATCH EXISTING. SEE     		REMAIN. ALSO REMOVE WALL DEVICES AND ITEMS							206  318-1575
<br />  																																																							STRUCTURAL DRAWINGS FOR MORE INFORMATION.       		MOUNTED TO WALLS.
<br />   																																																																		D.  REMOVE ALL FLOOR MATERIALS INCLUSIVE OF SETTING				THESE DRAWINGS AND SPECIFICATIONS ARE
<br />																																																																			BEDS, SUBFLOOR MATERIAL ETC. REMOVE MASTIC TO 				CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br />																																																																			PROVIDE A CLEAN FLOOR THAT IS ACCEPTABLE TO THE   			PROPERTY OF STARBUCKS CORPORATION, WHICH IS
<br />																																																																			SUBCONTRACTOR INSTALLING NEW FINISH MATERIAL. 				THE OWNER OF THE COPYRIGHT IN THIS WORK.
<br />       																																																																															THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN
<br />    				p    																																																													E.   DEMOLITION PLANS REPRESENT APPROXIMATE      				PART), SHARED WITH THIRD PARTIES OR USED IN AN
<br />																																																																			LOCATION OF EXISTING WALLS TO BE DEMOLISHED.  				MANNER ON OTHER PROJECTS OR EXTENSIONS TO
<br />    				C)    																																																																											THIS PROJECT WITHOUT THE PRIOR WRITTEN
<br />    				m 																																																														FIELD VERIFY TYPE OF CONSTRUCTION AND HEIGHT OF     			CONSENT OF STARBUCKS CORPORATION. THESE
<br />     				N 																																																														WALLS. PLANS DO NOT NECESSARILY INDICATE ALL  				DRAWINGS AND SPECIFICATIONS ARE INTENDED TO
<br />     				Q																																																														DEMO WALLS, COUNTERS, HANDRAILS, WALL     					EXPRESS DESIGN INTENT FOR A PROTOTYPICAL
<br />																																																																			PROTECTION, CLOSETS, SINKS ETC. PRIOR TO					STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE
<br />																																																																			DEMOLITION, FIELD VERIFY THAT WALLS TO BE  					AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE
<br />    				06 																																																														REMOVED DO NOT PROVIDE SUPPORT FOR EXISTING  				CONDITIONS. NEITHER PARTY SHALL HAVE ANY
<br />     				U 																																																														BUILDING ELEMENTS AND EXISTING CONSTRUCTION TO    			OBLIGATION NOR LIABILITY TO THE OTHER(EXCEPT
<br />    				U 																																																														REMAIN. NOTIFY STARBUCKS CONSTRUCTION  					STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br />    				a 																																																														MANAGER IF DEMOLITION WALLS SUPPORT EXISTING 					FULLY EXECUTED BY BOTH PARTIES.
<br />																																																																			BUILDING ELEMENTS.
<br />    				0
<br />   																																																																		F.   DEMOLISH AND REMOVE DOORS, VINYL BASE, CONDUIT,    			ARCHITECT OF RECORD
<br />    				U-) 																																																														WIRING, DUPLEXES, DATA OUTLETS, CABLES, SHELVING,    			o       �,
<br />    				Xm 																																																														METAL STUD AND GYPSUM BOARD WALLS, CLOSETS,
<br />																																																																			CABINETS, FILES, COUNTERS, WOOD MOLDING,					= > o						•
<br />																																																																			SHELVES AND ENCLOSURES WHERE APPLICABLE.
<br />																																																																																f
<br />   																																																																		G.  VERIFY WITH STARBUCKS CONSTRUCTION MANAGER				N
<br />    				o0 																																																														ACCESS TO THE DEMOLITION AREA, INGRESS AND
<br />       																																																																																				Oil
<br />																																																																			EGRESS ROUTES FOR MATERIAL AND EQUIPMENT.    									m c g a r c h i t e c u r e
<br />    				N
<br />    				0o    																																																													H.  PROTECT EXISTING FLOORS, WALLS AND CORNERS TO    					15635 Alton Parkway, Suite 100, Irvine, CA 92618
<br />    				cV 																																																														REMAIN ALONG WORK ACCESS ROUTES.       									P:949.553.1117 F:949.474.7056
<br />    				p   												I																																																	1.    CONTAIN DUST AND DEBRIS WITHIN THE DEMOLITION				ARCHITECT STAMP
<br />    				U       											�-�       			I I 										i    i    i    i    i    i    i    i    i    i    i    i    i    i    i  																										AREA.     															ED A
<br />   																																																																																			SC
<br />     				0
<br />																				F   																																																															GE WIN
<br />																				\\ 																																														J.   THE GENERAL CONTRACTOR SHALL PERFORM WORK IN 						C)   P	kl�
<br />    				CY) 																																																														A MANNER THAT DOES NOT DAMAGE THE EXISTING   									'A
<br />    				N
<br />																																																																			STRUCTURE. DEMOLITION SHALL NOT COMPROMISE 									..
<br />    				LL 																																																														THE STRUCTURAL INTEGRITY OF ANY WALLS, FLOORS, 								1839
<br />																																																																			CEILINGS, SUPPORTS, STRUCTURE, ETC. TO REMAIN.       							9�	1
<br />    				a																	II  																																																												�
<br />     				U) 																				r 																																									K.  ALL DEMOLITION MATERIALS AND DEBRIS SHALL BE  									��~P
<br />    				N   																				r    															-r�   										T-T  												DISPOSED OF ACCORDING TO FEDERAL, STATE AND     							F CALIFO
<br />    				U) 																																																														LOCAL REGULATIONS.
<br />																									II     																													II
<br />   																																																																		L.   AT LOCATIONS WHERE EXISTING WALLS ARE TO BE
<br />  																	---     	----																										�/ 							L 												REMOVED NEAR EXISTING WALLS TO REMAIN,
<br />     				'     																	--i      	II   ` + 	^  	F 								-�T 																													PERFORM DEMOLITION WITHOUT DISTURBING EXISTING
<br />    																												_tet
<br />       																						I       			/\       							/\ 											�� 																				ELEMENTS TO REMAIN. WALLS TO REMAIN SHALL BE
<br />       																						\     	II						�°
<br />    				U 																																																														INTACT AND HAVE A NEAT SURFACE.
<br />																							A     		I     i    �   		I     i    �     II 		i    �     II      								I�-
<br />  																								`��      																				j      																				M.  REFER TO "ITEMS TO BE PRESERVED" LIST FOR ITEMS
<br />     				v 																																																														THAT SHALL BE SALVAGED FOR RELOCATION. VERIFY
<br />     				L   																																													1,   																WITH OWNER FOR ON SITE STORAGE LOCATION OF
<br />    				Q
<br />    				N 																																																														SALVAGED ITEMS.     										W
<br />    				CD
<br />      																																																					rN.  DAMAGED FIREPROOFING SHALL BE REPAIRED/    					J
<br />    				z 																																																														REPLACED TO MATCH EXISTING. 													(V
<br />   															_      																													f-----------------�      	rr�l
<br />     																																																																																					Lo
<br />    				U     																																								j     					I\     	jj 													O.  THE GENERAL CONTRACTOR SHALL DEMOLISH ANY       				<    			LL)  m
<br />       				I
<br />  																																													,_j   							II      													EXISTING ABANDONED VOICE/DATA CABLING AND DEAD
<br />    				C   																																								IIIA 						\�\\   														OR NON-USE ELECTRICAL BACK TO PANEL. ALL    					`    			Q  Q
<br />  																																													III   																					RECEPTACLES NOT REUSED ARE TO BE REMOVED,					,,����((
<br />     				p																																				I   				III   																					PATCHED AND PAINTED.    									W       		U)LU
<br />       																																																																																				_v
<br />       																		i      									I-I     											I   I--I     			II     																																		W    				LL  Z
<br />       																																								I   				II�I   																																																													P.   REMOVAL OF LOW VOLTAGE EQUIPMENT, PERTAINING     								—
<br />     												T      			----   -�   									---JI      															III     																																						p	Q
<br />																																																																			TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE     			Q      			p  U
<br />  																																													III									_       											VERIFIED BY THE STARBUCKS CONSTRUTION MANAGER    			ZLL
<br /> 																																																																																				Q  Q
<br />  																																													III   																					PRIOR TO REMOVAL. SALVAGED EQUIPMENT SHALL BE     			l-_      			l--  0-
<br />																																																																			STORED
<br />																																																																			STORED IN A CLIMATE CONTROLLED ENVIRONMENT  				U      			U06
<br /> 																																																																																				LLJ	U
<br />      												II			j    																																					L L  J  III 												FOR FUTURE INSTALLATION.  								LU      			L  _�  O
<br />     				v      													J       																																			j 																									o  Q       		O
<br />   																																																																		Q.  LABEL ALL ITEMS AND PROPERLY STORE FOR  					0�    				o0/1 			a  0
<br />    				d 									\\    		-     ---�															TYPICAL     																															RE-INSTALL.											Q_  L.L
<br />       				I   												T     -       														THROUGHOUT      									--------------------------_j   J
<br />   																																																																																STORE       		5470
<br />      																																																						I
<br />    				X  																																																																											PROJECT #:       	03030-052
<br />    				m											1   		=7       																																			II
<br />    				W   													-    																																																													CASEWORK CONCEPT:      CORE
<br />     																--  5   -      																																																													ISSUE DATE:   		CHECKSET 2-10-20
<br /> 																																																																																PROGRAM MANAGER:	M.DREBIKA
<br />    				00T
<br />     																--      																																																														STORE DESIGNER:    	M.DREBIKA
<br /> 																																																																																LEED�AP:      		N/A
<br />      											4  						-
<br /> 																																																																																CHECKED BY:  		A.FELDMAN
<br />    				X    												---=�
<br />    				m     									---       L==   ===�   																																															LEGEND
<br />    				W   		—     ------  	--------------  																																																																MCG PROJECT#:      	18531
<br />    				O      													J    																																															L-----------J   MATERIAL TO BE DEMOLISHED  				MCG PROJ. MANAGER:       C.LEE
<br />     																		-  																																																													MCG PROJ. SPECIALIST:     SPARK
<br />      																																																																						PRESERVE  O
<br />     				O      																																																																	EXISTING WALLUSE
<br />   																																																																									TO REMAIN
<br />    				11Revision Schedule
<br />    				00											L
<br />																																																									_--------																				Rev    Date     By		Description
<br />    				CN
<br />  																		/																																						--
<br />    																III    	�
<br />    				73      																																	\�																																									SHEET TITLE:
<br />    				d
<br />    				N																									-------   -------		I 																																											DEMOLITION  FLOOR
<br />       																																																																															PLAN
<br />  																																																																											N 				SCALE:AS SHOWN
<br />    				CD
<br />							ARCHITECTURAL -  DEMOLITION  PLAN
<br />    				O   	�   																																																																									SHEET NUMBER:
<br />    				co N  		Scale: 1/4" = V-0"
<br />    				N
<br />    				C"�
<br />
								 |