Laserfiche WebLink
SHEET NUMBER: <br />SHEET TITLE: <br />SCALE: AS SHOWN <br />STORE #: <br />PROJECT #:PROJECT NAME:PROJECT ADDRESS:C 2020 STARBUCKS COFFEE COMPANY <br />R <br />ISSUE DATE: <br />2401 UTAH AVENUE SOUTH <br />SEATTLE, WASHINGTON 98134 <br />(206) 318-1575 <br />THESE DRAWINGS AND THE PROJECT MANUAL <br />ARE CONFIDENTIAL AND SHALL REMAIN THE <br />SOLE PROPERTY OF STARBUCKS <br />CORPORATION, WHICH IS THE OWNER OF THE <br />COPYRIGHT IN THIS WORK. THEY SHALL NOT <br />BE REPRODUCED (IN WHOLE OR IN PART), <br />SHARED WITH THIRD PARTIES OR USED IN ANY <br />MANNER ON OTHER PROJECTS OR <br />EXTENSIONS TO THIS PROJECT WITHOUT THE <br />PRIOR WRITTEN CONSENT OF STARBUCKS <br />CORPORATION. THESE DRAWINGS AND <br />SPECIFICATIONS ARE INTENDED TO EXPRESS <br />DESIGN INTENT FOR A PROTOTYPICAL <br />STARBUCKS STORE (WHICH IS SUBJECT TO <br />CHANGE AT ANYTIME) AND DO NOT REFLECT <br />ACTUAL SITE CONDITIONS. NEITHER PARTY <br />SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br />THE OTHER (EXCEPT STATED ABOVE) UNTIL A <br />WRITTEN AGREEMENT IS FULLY EXECUTED BY <br />BOTH PARTIES. <br />STARBUCKS TEMPLATE VERSION: i2020-07-27 <br />R <br />SR. DESIGN MANAGER: <br />DESIGN MANAGER: <br />CHECKED BY: <br />R <br />I520 <br />23871-068 <br />7957 <br />JESSICA RAMOS <br />JESSICA RAMOS <br />JOSE LAROCCA <br />WALL & FLOOR <br />FINISH DETAILS <br />Revision Schedule <br />Rev Date By Description <br />01/28/21 JGR FINAL REVIEW SET <br />02-05-2021HIGHWAY 99 & WATERLOO4426 EAST WATERLOO ROADSTOCKTON, CA 95215COUNTRY OF SAN JOAQUIN1 <br />2 <br />3 <br />02/05/21 JGR PERMIT SET <br />TILE BASE @ CABINET SIDE 02 <br />03 <br />TILE BASE @ CABINET FRONT <br />Scale 6" = 1'-0" <br />01 <br />Scale 1" = 1" <br />Scale 1" = 1" <br />METAL BASE @ FRONT BAR <br />Scale 6" = 1'-0" <br />04 <br />CABINET TOE-KICK OVERHANG, <br />FURNISHED BY VENDOR & <br />INSTALLED BY GC <br />SEALANT T O MATCH ADJACENT <br />WALL FINISH <br />INSTALL CASEWORK BASE PRIOR <br />PRIOR TO ECO-GRIP FLOORING <br />FINISH FLOOR PER SCHEDULE <br />COVED TILE BASE PER SCHEDULE <br />1/4" (6MM) RADIUS AT COVED <br />BASE <br />CONCRETE SLAB6"FINISH FLOOR PER SCHEDULE <br />5/8" CEMENT BOARD <br />COVED TILE BASE PER SCHEDULE <br />1/4" (6MM) RADIUS AT COVED <br />BASE <br />CONCRETE SLAB <br />SEALANT TO MATCH ADJACENT <br />WALL FINISH <br />FRP WALL COVERING <br />6"SEALANT T O MATCH ADJACENT <br />WALL FINISH <br />INSTALL CASEWORK BASE PRIOR <br />PRIOR TO ECO-GRIP FLOORING <br />FINISH FLOOR PER SCHEDULE <br />COVED TILE BASE PER SCHEDULE <br />1/4" (6MM) RADIUS AT COVED <br />BASE <br />CONCRETE SLAB6"CABINET, FURNISHED BY VENDOR <br />& INSTALLED BY GCGYPSUM WALL BOARD <br />CEMENTITIOUS BOARD <br />BRICK MOSAIC TILE <br />GROUT <br />STAINLESS STEEL BACKSPLASH <br />(WHERE OCCURS) <br />6" (150MM) METAL BASE PER <br />SCHEDULE. ADHERE TO TOE KICK <br />PER MFR'S RECOMMENDATION <br />FINISH FLOOR PER SCHEDULE <br />CLEAR SILICONE SEALANT <br />CONCRETE SLAB6"CABINET, FURNISHED BY VENDOR <br />& INSTALLED BY GC <br />Scale 3" = 1'-0" <br />SS BACKSPLASH TO TILE TRANSITION <br />TILE BASE TO FRP <br />05