Laserfiche WebLink
ABBREVIATIONSAFFABOVE FINISHED FLOORAHJAUTHORITIES HAVING JURISDICTIONAPPROXAPPROXIMATEBLDGBUILDINGCKTCIRCUITCLGCEILINGCMSTARBUCKS CONSTRUCTION MANAGERCONSTCONSTRUCTIONCWCOLD WATERCXACOMMISSIONING AGENTDEGDEGREESDLLIGHTS WITHIN DAYLIGHT ZONEDMSTARBUCKS DESIGN MANAGERDNDOWNDTLDETAILDWG(S)DRAWING(S)EAEACHECELECTRICAL CONTRACTORECPEQUIPMENT CONTROL PACEGEXHAUST GRILLEELECELECTRICALEMEMERGENCYEMSENERGY MANAGEMENT SYSTEMEXISTEXISTINGEXTEXTERIORF&IFURNISH & INSTALLFLRFLOORFTFOOT/FEETGCGENERAL CONTRACTORGFCIGROUND FAULT CIRCUIT INTERRUPTERGNDGROUNDHRHOURHVACHEATING, VENTILATION, AIR CONDITIONINGHWHOT WATERLCPLIGHTING CONTROL PANELLLLANDLORDLSLIGHT SENSOR PHOTOCELLLVLOW VOLTAGEMAXMAXIMUMMCMECHANICAL CONTRACTORMDPMAIN DISTRIBUTION PANELMECHMECHANICALMEPMECHANICAL, ELECTRICAL, AND PLUMBINGMFGMANUFACTURERMINMINIMUMNLNIGHTLIGHTNTSNOT TO SCALEOCPOVERCURRENT PROTECTIONREFREFERENCEREQ(’D)REQUIRE(D)REVREVISIONSFSQUARE FEETSHTSHEETSPECSSPECIFICATION(S)SSTSTAINLESS STEELTELTELEPHONETEMPTEMPORARYTYPTYPICALUNOUNLESS NOTED OTHERWISEWHWATER HEATERWPWEATHER PROOFNLJMJUNCTON BOXRACEWAY CONCEALEDIN CEILING OR WALL.HASH MARKS INDICATENUMBER OF WIRES. #12 AWG WIRE UNLESSOTHERWISE NOTED.TWO WIRES PLUSGROUND IF NO HASHMARKS SHOWN. LONGHASH MARK DENOTESNEUTRAL.GROUND WIRE NOTSHOWN.3SELECTRICAL SYMBOL LEGENDDPERECEPTACLE: DUPLEXSWITCHRECEPTACLE: DUPLEX -INDIVIDUAL BRANCH CIRCUITTHREE-WAY SWITCHRECEPTACLE: QUADMOTION (OCCUPANCY)SENSOR SWITCHRECEPTACLE: HIGH VOLTAGESWITCHBACKGROUNDING ELECTRODECONNECTIONTELEPHONENIGHTLIGHTING 24HR/DAYTHERMOSTATSTHERMOSTAT SENSORPHOTOELECTRIC CELLDIMMER SWITCHSPEAKERRECEPTACLE: DATARECEPTACLE: FLOOR DUPLEXRECEPTACLE: QUAD -INDIVIDUAL BRANCH CIRCUITWIFI ACCESS POINTSECURITY SYSTEM NOTESSTARBUCKS CONTRACTS DIRECTLY WITH SECURITY VENDOR TO SUPPLYAND INSTALL THE SECURITY SYSTEM. CONTRACTOR TO SCHEDULEINSTALLATION OF SECURITY SYSTEM FOR FOUR (4) TIMES;1.MEET TO PLAN SECURITY CABLE PULL WITH SECURITY CABLEINSTALLER PRIOR TO DRYWALL INSTALLATION.2.SECURITY CABLE INSTALLER PULLS SECURITY CABLES, MOUNTSPANEL, KEYPAD AND SENSORS.3.SECURITY EQUIPMENT INSTALL OF CAMERA, NVR AND MONITOR.4.SECURITY MONITORING COMPANY TO BRING SYSTEM ONLINE ANDTRAIN PARTNERS AFTER POS INSTALL.SECURITY VENDOR REQUIRES A MINIMUM TWO (2) WEEKS LEAD TIME FOREACH INSTALLATION. SECURITY VENDOR WILL COORDINATE REGIONALINSTALLERS. ALL ADDITIONAL EXPENSES INCURRED DUE TO THECONTRACTOR'S FAILURE TO SCHEDULE ACCORDINGLY WILL BE THERESPONSIBILITY OF THE CONTRACTOR.CARBON MONOXIDE(CO) DETECTOR NOTESCOORDINATE INSTALLATION OF CARBON MONOXIDE (CO) DETECTORDEVICE(S) AND LOW VOLTAGE WIRING WITH STARBUCKS SECURITYVENDOR FOR NEW STORES, RELOCATIONS AND MAJOR RENOVATIONS, IFIN VENDOR SCOPE. VENDOR TO PROVIDE AND INSTALL DEVICE(S) IN BOHAND FOH (AS APPLICABLE PER STARBUCKS STANDARDS).FIRE ALARM SYSTEM NOTESIF STARBUCKS IS REQUIRED TO PROVIDE A FIRE ALARM AND/OR FIREALARM MONITORING AND/OR PHONE LINES FOR A FIRE ALARM, ASSPECIFIED IN THE LEASE AGREEMENT, THE CONTRACTOR IS TO NOTIFYGNOC IMMEDIATELY THAT FIRE ALARM LINES ARE NEEDED. STARBUCKSPREFERRED FIRE ALARM SERVICE PROVIDER, STANLEY, IS TO BECONTACTED BY THE CONSTRUCTION MANAGER TO INSTALL FIRE ALARMPANEL AND/OR MONITORING SERVICE AS REQUIRED.ENERGY MANAGEMENT SYSTEM (EMS)FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS ANDJUNCTION BOXES FOR THERMOSTAT(S) AND SENSOR(S).SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE ‘ON’ DURATIONIN SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE ‘ON’ DURATIONIN MULTI-OCCUPANT RESTROOM UNLESS JURISDICTIONREQUIREMENTS STATE OTHERWISE.COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICELOCATIONS. VENDOR SHALL COMMISSION CONTROLS.THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTIONAFTER DATA RACK AND NETWORK INSTALLATION. THE GENERALCONTRACTOR IS TO CONTACT LCP VENDOR TO VERIFY SYSTEMOPERATION AND TROUBLESHOOT IF REQUIRED.THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATEINSTALLATION OF<INSERT LCP PRODUCT> AND<INSERT EMS SYSTEM>WITH EMS INSTALLER. PRIOR TO LAST WEEK OF CONSTRUCTION.FURNISH AND INSTALL TEMPORARY THERMOSTATS AND SENSORS, ANDROUTE ALL LOW VOLTAGE WIRING THROUGH EC PROVIDED CONDUITS(COORDINATE WITH ELECTRICAL).CONTROLS AND OPERATIONFURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND JUNCTIONBOXES FOR THERMOSTAT(S) AND SENSOR(S).SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE ‘ON’ DURATION INSINGLE OCCUPANT RESTROOM AND TO 20 MINUTE ‘ON’ DURATION INMULTI-OCCUPANT RESTROOM UNLESS JURISDICTION REQUIREMENTSSTATE OTHERWISE.COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICELOCATIONS. VENDOR SHALL COMMISSION CONTROLS.THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION AFTERDATA RACK AND NETWORK INSTALLATION. THE GENERAL CONTRACTORIS TO CONTACT LCP VENDOR TO VERIFY SYSTEM OPERATION ANDTROUBLESHOOT IF REQUIRED.THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATEINSTALLATION OF LIGHTING CONTROL PANEL WITH "LUTRON" PRIORTO THE LAST WEEK OF CONSTRUCTION.TELEPHONE SYSTEM NOTESIF ADDITIONAL TELEPHONE LINES ARE REQUIRED BEYOND THESTANDARD SINGLE LINE (SUCH AS FOR A FIRE ALARM) THE GENERALCONTRACTOR SHALL CONTACT STARBUCKS PRIOR TO BEGINNINGCONSTRUCTION TO ORDER THE ADDITIONAL TELEPHONE LINE(S).REPORT ANY TELEPHONE INSTALLATION ISSUES IMMEDIATELY TOSTARBUCKS.CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THERE AREEXISTING, WORKING TELCO FACILITIES TO THE BUILDING OR THATLANDLORD HAS FURNISHED AND INSTALLED ONE (1) 2" (51MM) MIN.(ENTRANCE) CONDUIT INCLUDING PULL STRING FROM TELCO STREETFEED LINE TO THE BUILDING AS IDENTIFIED BY THE PHONE COMPANY.NOTIFY STARBUCKS CONSTRUCTION MANAGER IMMEDIATELY IFFACILITIES OR CONDUIT AND PULL STRING ARE NOT INSTALLED.GENERAL CONTRACTOR IS TO ENSURE THAT THERE IS A 2" (51MM) MIN.CONDUIT WITH PULL STRING FROM THE DATA RACK TO THE DEMARC(TELCO TO CUSTOMER HAND OFF EQUIPMENT) WHEN THE DEMARC ISMORE THAN 10' FROM THE DATA RACK. DISTANCES LESS THAN 10' WILLNOT REQUIRE CONDUIT.PROVIDE A 3-POSITION GROUND LUG, GROUNDED WITH #6 AWGGROUND WIRE, IF REQUIRED BY TELEPHONE COMPANY.ALL TELEPHONE/NETWORK CABLING IS THE SCOPE OF WORK OF THETELEPHONE/NETWORK CABLING VENDOR.POS \ DATA LINE NOTESSTARBUCKS CONTRACTS DIRECTLY WITH THE DATA CABLING VENDORTO SUPPLY AND INSTALL CATEGORY 5e (CAT5e) LAN CABLE ANDCONNECTORS FOR THE POINT OF SALE (POS) SYSTEMS. CONTRACTORTO SCHEDULE INSTALLATION OF DATA CABLING WITH DATA CABLINGVENDOR. DATA CABLING VENDOR REQUIRES A LEAD TIME FORINSTALLATION. DATA CABLING VENDOR WILL COORDINATE REGIONALINSTALLERS.AT THE START OF CONSTRUCTION, STARBUCKS CONSTRUCTIONMANAGER SCHEDULES DELIVERY OF CASH REGISTER/MANAGER'SWORKSTATION EQUIPMENT AND INSTALLATION BY A POS INSTALLTECHNICIAN FOR ONE (1) MONTH PRIOR TO STORE OPEN.CONTRACTOR TO VERIFY DELIVERY SCHEDULE TWO (2) WEEKS PRIORTO DELIVERY AND INSTALLATION DATE. EQUIPMENT IS SHIPPEDDIRECTLY TO THE STORE. CONTRACTOR TO ACCEPT POS EQUIPMENTDELIVERY. DO NOT REFUSE DELIVERY.DATA CABLING TECHNICIAN TO PROVIDE ALL CAT5e LAN CABLING ANDCONNECTORS FROM ALL DESIGNED AND FUTURE CASH REGISTERLOCATIONS, MANAGER'S WORKSTATION, ALL OTHER NETWORKEDEQUIPMENT (CUP LABELERS, CLOVER, BUMP BAR, ETC...) ANDWIRELESS ACCESS POINT TO THE DATA RACK AREA. CONTRACTOR ISTO HAVE CONDUIT WITH PULL STRING IN PLACE FOR ALL CABLE RUNSPRIOR TO CABLE INSTALL DATE.STARBUCKS NEW STORE GROUP IS RESPONSIBLE FOR COORDINATINGSTARBUCKS POS SYSTEMS DELIVERY AND INSTALLATION WITH THE POSVENDOR. THIS GROUP MAY BE CONTACTED AT:NEWSTORES@STARBUCKS.COM.COMMUNICATION SYSTEM NOTESCONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THE LANDLORD HASFURNISHED AND INSTALLED ONE (1) ADDITIONAL 2" (51MM) (ENTRANCE)CONDUIT INCLUDING PULL STRING (FOR A TOTAL OF TWO (2)) FROM THESTREET FEED TO THE BUILDING AS IDENTIFIED BY THE INTERNET SERVICEPROVIDER.WIRELESS NETWORK NOTESCABLING FOR INTERNET SERVICE SHALL BE FURNISHED AND INSTALLEDBY THE VENDOR FOR FIBER OR BROADBAND CONNECTIONS. T1 ANDETHERNET EXTENSION CABLING IS PROVIDED BY THE STARBUCKS(TELEPHONE/ NETWORK) CABLING VENDOR. COORDINATE WITHSTARBUCKS.MUSIC SYSTEM NOTESMOUNT OWNER FURNISHED SPEAKERS WHERE SHOWN ON INTERIORREFLECTED CEILING PLANS AND IN COORDINATION WITH ALL PLANS,DETAILS AND MANUFACTURER'S INSTALLATION REQUIREMENTS.INSTALL AND CONNECT OWNER FURNISHED WIRING SYSTEM BETWEENALL SPEAKERS AND THE OWNER PROVIDED MUSIC SYSTEM. SETWATTAGE TAP ON EACH SPEAKER'S ROTARY SWITCH PER TAP SETTINGSNOTED ON PLANS.GENERAL ELECTRICAL NOTES1.THE ELECTRICAL CONTRACTOR SHALL COORDINATE ELECTRICALWORK AND SPECIFICATIONS WITH OTHER TRADES. THEARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL TAKEPRECEDENCE OVER ALL OTHER DRAWINGS. DO NOT SCALEDISTANCES OFF THE ELECTRICAL DRAWINGS; USE ACTUALBUILDING DIMENSIONS. OVERALL CASEWORK COMPONENTDIMENSIONING ON ELECTRICAL DETAILS ARE SHOWN FORREFERENCE ANDCOORDINATION ONLY. SEE SPECIFICATIONSHEETS FOR ELECTRICAL SPECIFICATIONS2.ALL ELECTRICAL SYSTEMS SHALL BE TESTED FOR PROPEROPERATION. BALANCE ALL BRANCH CIRCUIT LOADS BETWEENTHE PHASES OF THE SYSTEM WITHIN 10% OF THE HIGHEST PHASELOAD IN EACH PANEL BOARD.3.THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DE-ENERGIZING CIRCUITS IN DEMOLITION AREAS TO INSURE A SAFECONDITION. ELECTRICAL DEVICES AND ASSOCIATED WIRINGLOCATED WITHIN THE DEMOLITION AREA THAT WILL NO LONGERBE USED SHALL BE REMOVED AND PROPERLY DISPOSED OF ATCONTRACTORS EXPENSE UNLESS OTHERWISE NOTED.4.THE ELECTRICAL CONTRACTOR SHALL SCHEDULE ALL ELECTRICALSYSTEM OUTAGES WITH THE GENERAL CONTRACTOR ANDLANDLORD AT LEAST 24 HOURS IN ADVANCE. UNLESS APPROVEDOTHERWISE ALL OUTAGES SHALL OCCUR BETWEEN 11:00PM AND5:00AM.5.ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALLNECESSARY CONDUIT AND J-BOXES TO SUPPORT A COMPLETESECURITY, PHONE, POS AND DATA SYSTEMS. SEE MANAGERWORKSTATION AND BAR POINT OF SALE (POS)POWER/TELECOM/SECURITY DIAGRAM. COORDINATE ALL DEVICELOCATIONS AND MOUNTING HEIGHTS WITH SECURITY VENDORPRIORTO ROUGH-IN. PROVIDE END-TO-END PULL STRINGS IN ALLCONDUITS. LABEL EACH END OF THE PULL STRING WITH CONDUITSYSTEM ("SECURITY") AND DESTINATION ("CAFÉ", "FRONT BAR",ETC.). PROVIDE INSULATED BUSHINGS ON ALL STUBBED-UP ANDEXPOSED CONDUIT ENDS.6.ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THEGENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTINGWALLS, FLOORS, CEILINGS OR OTHER SURFACES IDENTIFIED TOREMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OFWORK.7.EXPOSED/SURFACE MOUNTED CONDUITS SHALL ONLY BEALLOWED WHERE NECESSARY IN EXPOSED CEILING AREAS. IFCONDUITSNEED TO BE SURFACE MOUNTED TO WALLS,COORDINATE WITH STARBUCKS CONSTRUCTION MANAGER FORAPPROVAL.8.VERIFY LOCATION OF ALL OUTLETS AND SWITCHES WITHARCHITECTURAL DRAWINGS, INTERIOR DETAILS, FINISHSCHEDULES, GENERAL CONTRACTOR, EQUIPMENT VENDORS,STARBUCKS AND EXISTING SITE CONDITIONS. VERIFY FINAL DOORHINGE LOCATION PRIOR TO SWITCH INSTALLATION AND ADJUSTSWITCH LOCATION IF NEEDED. DO NOT MOUNTRECEPTACLES/SWITCHES IN LOCATIONSTHAT WOULD CONFLICTWITH MIRRORS, SEAMS OF WALLS, WAINSCOTS, TILETRANSITIONS, ETC...GENERAL NOTESSCOPETHE INTENT OF THE SPECIFICATION AND THE DRAWINGS IS TO PROVIDEA COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM. THEELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR,MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THEELECTRICAL WORK.SITE EXAMINATIONTHE ELECTRICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALLAREAS WHERE EQUIPMENT, CONDUIT, AND WIRING WILL BE INSTALLEDAND WILL REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTSTHE PROPER INSTALLATION OF THE ELECTRICAL WORK.STANDARDSEQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATEPROVISIONS OF CSA, ULC, NEC, ASTM, UL, ETL, NEMA, ANSI, ASAPPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY.CODESALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALLAPPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASEOF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THECODES, THE HIGHEST STANDARD SHALL APPLY. ELECTRICALCONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUMSTANDARD WITHOUT ANY EXTRA COST TO STARBUCKS.PERMITS AND FEESTHE ELECTRICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALLPERMITS, FEES, AND INSPECTIONS NECESSARY TO COMPLETE THEELECTRICAL WORK.WARRANTYTHE ELECTRICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANTALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIPFOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCEBY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORKPROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTINGWORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALSAND WORKMANSHIP.LEEDALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEEDREQUIREMENTS & CODE. IN CASE OF CONFLICT, THE HIGHERSTANDARD SHALL APPLY.LANDLORD REQUIREMENTSPRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD /BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS /SPECIFICATIONS. IF LANDLORD / BUILDING OWNER DOES HAVEREQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIARWITH REQUIREMENTS / SPECIFICATIONS AND ADHERE TO THEM. WHERELANDLORD / BUILDING OWNER REQUIREMENTS ARE MORE STRINGENTTHAN SHOWN IN THESE PLANS (IN THE OPINION OF THE ENGINEER).LANDLORD / BUILDING OWNER REQUIREMENTS SHALL GOVERN.SCOPE OF WORK- COMPLETE INTERIOR LIGHTING AND LIGHTING CONTROLS CHANGES.- POWER CHANGES FOR NEW FOOD SERVICE EQUIPMENT IN THE BAR- NEW EMERGENCY AND EXIT LIGHTING.- ALL PANELS ARE EXISTING TO REMAIN.SHEET NUMBER:SHEET TITLE:SCALE:STORE #:PROJECT #:PROJECT NAME: <br />PROJECT ADDRESS:C 2020 STARBUCKS COFFEE COMPANYRISSUE DATE:2401 UTAH AVENUE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575THESE DRAWINGS AND THE PROJECT MANUALARE CONFIDENTIAL AND SHALL REMAIN THESOLE PROPERTY OF STARBUCKSCORPORATION, WHICH IS THE OWNER OF THECOPYRIGHT IN THIS WORK. THEY SHALL NOTBE REPRODUCED (IN WHOLE OR IN PART),SHARED WITH THIRD PARTIES OR USED IN ANYMANNER ON OTHER PROJECTS OREXTENSIONS TO THIS PROJECT WITHOUT THEPRIOR WRITTEN CONSENT OF STARBUCKSCORPORATION. THESE DRAWINGS ANDSPECIFICATIONS ARE INTENDED TO EXPRESSDESIGN INTENT FOR A PROTOTYPICALSTARBUCKS STORE (WHICH IS SUBJECT TOCHANGE AT ANYTIME) AND DO NOT REFLECTACTUAL SITE CONDITIONS. NEITHER PARTYSHALL HAVE ANY OBLIGATION NOR LIABILITY TOTHE OTHER (EXCEPT STATED ABOVE) UNTIL AWRITTEN AGREEMENT IS FULLY EXECUTED BYBOTH PARTIES.STARBUCKS TEMPLATE VERSION: i2020.10.23STARBUCKSRSR. DESIGN MANAGER:DESIGN MANAGER:CHECKED BY:Revision ScheduleRevDateByDescription01/28/21ACIESFINAL REVIEW SET400 N McCarthy Blvd.Copyright c 2021info@acies.netfx: (408) 522-5260ph: (408) 522-5255Suite 250, Milpitas, CA 95035ENGINEERINGHIGHWAY 99 & WATERLOO <br />4426 EAST WATERLOO ROAD <br />STOCKTON, CA 95215 <br />COUNTY OF SAN JOAQUIN23871-06801-28-217957JESSICA RAMOS02/05/21ACIESPERMIT SETTGHTE-001ELECTRICAL NOTES