Laserfiche WebLink
SHEET NUMBER:SHEET TITLE:SCALE:STORE #:PROJECT #:PROJECT NAME: <br />PROJECT ADDRESS:C 2020 STARBUCKS COFFEE COMPANYRISSUE DATE:2401 UTAH AVENUE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575THESE DRAWINGS AND THE PROJECT MANUALARE CONFIDENTIAL AND SHALL REMAIN THESOLE PROPERTY OF STARBUCKSCORPORATION, WHICH IS THE OWNER OF THECOPYRIGHT IN THIS WORK. THEY SHALL NOTBE REPRODUCED (IN WHOLE OR IN PART),SHARED WITH THIRD PARTIES OR USED IN ANYMANNER ON OTHER PROJECTS OREXTENSIONS TO THIS PROJECT WITHOUT THEPRIOR WRITTEN CONSENT OF STARBUCKSCORPORATION. THESE DRAWINGS ANDSPECIFICATIONS ARE INTENDED TO EXPRESSDESIGN INTENT FOR A PROTOTYPICALSTARBUCKS STORE (WHICH IS SUBJECT TOCHANGE AT ANYTIME) AND DO NOT REFLECTACTUAL SITE CONDITIONS. NEITHER PARTYSHALL HAVE ANY OBLIGATION NOR LIABILITY TOTHE OTHER (EXCEPT STATED ABOVE) UNTIL AWRITTEN AGREEMENT IS FULLY EXECUTED BYBOTH PARTIES.STARBUCKS TEMPLATE VERSION: i2020.10.23STARBUCKSRSR. DESIGN MANAGER:DESIGN MANAGER:CHECKED BY:Revision ScheduleRevDateByDescription01/28/21ACIESFINAL REVIEW SET400 N McCarthy Blvd.Copyright c 2021info@acies.netfx: (408) 522-5260ph: (408) 522-5255Suite 250, Milpitas, CA 95035ENGINEERINGHIGHWAY 99 & WATERLOO <br />4426 EAST WATERLOO ROAD <br />STOCKTON, CA 95215 <br />COUNTY OF SAN JOAQUIN23871-06801-28-217957JESSICA RAMOS02/05/21ACIESPERMIT SETP-0001PLUMBING SYMBOLSLIST & ABBREVIATIONSN.T.S.GENERAL PLUMBING NOTES1.PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERALCONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS,CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAYBECOME DAMAGED DURING THE COURSE OF WORK.2.EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BARAREA UNDER COUNTERTOPS, WHERE IT DOES NOT OBSTRUCTCABINETS/DEVICES AND WHERE APPROVED BY STARBUCKSCONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, ITSHALLBE ROUTED TO MAXIMIZE STORAGE SPACE AND BEPROTECTED FROM DAMAGE.3.DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT ORARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALLCOMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE ACOMPLETE AND OPERATING SYSTEM. OVERALL CASEWORKCOMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWNFOR REFERENCE AND COORDINATION ONLY.4.CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCESREQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKSCONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TOPROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACEOFTHE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALLDIMENSIONS TO BE TAKEN FROM ACTUAL BUILDINGDIMENSIONS.5.THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORKWITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS ANDSPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHERDRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR FIXTURES INCASEWORK AND PLUMBING DETAILS. SEE SPECIFICATION SHEETSFOR PLUMBING SPECIFICATION SECTIONS.6.ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROMSTRUCTURE (NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS).7.REFER TO OUTLINE SPECIFICATIONS FOR PLUMBING SPECIFICATIONSECTIONSAFFABOVE FINISHED FLOORAHJAUTHORITIES HAVING JURISDICTIONAPPROXAPPROXIMATEBLDGBUILDINGCLGCEILINGCONSTCONSTRUCTIONCWDOMESTIC COLD WATERCXACOMMISSIONING AGENTDEGDEGREESDNDOWNDTLDETAILDWG(S)DRAWING(S)EAEACHECELECTRICAL CONTRACTORELECELECTRICALEMEREMERGENCYEXISTEXISTINGEXTEXTERIORFDFLOOR DRAINFSFLOOR SINKF&IFURNISH & INSTALLFLRFLOORFTFOOT/FEETFCOFLOOR CLEANOUTGCGENERAL CONTRACTORGFCIGROUND FAULT CIRCUIT INTERRUPTERGWGREASE WASTEHRHOURHVACHEATING, VENTILATION, AND AIRCONDITIONINGHWHOT WATERHSHANDSINKHWSHOT WATER SUPPLYHWRHOT WATER RETURNLLLANDLORDLVLOW VOLTAGEMAXMAXIMUMMCMECHANICAL CONTRACTORMDPMAIN DISTRIBUTION PANELMECHMECHANICALMEPMECHANICAL, ELECTRICAL, AND PLUMBINGMFGMANUFACTURERMINMINIMUMMSMOP SINKNLNIGHTLIGHTNTSNOT TO SCALEPCPLUMBING CONTRACTORPSPREP SINKPOCPOINT OF CONNECTIONREFREFERENCEREQ’DREQUIREDREVREVISIONSHTSHEETSFSQUARE FEETSPECSSPECIFICATION(S)SSTSTAINLESS STEELTELTELEPHONETEMPTEMPORARYTMVTEMPERATURE MIXING VALVETWTEMPERED HOT WATERTYPTYPICALUNOUNLESS NOTED OTHERWISEVVENTWSANITARY WASTEWCOWALL CLEANOUTWHWATER HEATERWPWEATHER PROOFABBREVIATIONSGENERAL NOTESSCOPETHE INTENT OF THE SPECIFICATIONS AND THE DRAWINGS IS TOPROVIDE ACOMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM. THECONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND EQUIPMENTRELATED TO THE INSTALLATION OF THE PLUMBING WORK.SITE EXAMINATIONTHE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHEREFIXTURES, EQUIPMENT, AND PIPING WILL BE INSTALLED AND WILLREPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS THE PROPERINSTALLATION OF THE PLUMBING WORK.STANDARDSEQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATEPROVISIONS OF CSA, ULC, ASME, ASTM, UL, NEMA, ANSI, ASHRAE, NFPA,ASAPPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY.CODESALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALLAPPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASEOFCONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THECODESAND ORDINANCES, THE HIGHEST STANDARD SHALL APPLY. THECONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUMSTANDARD WITHOUT ANY EXTRA COST TO STARBUCKS.PERMITS AND FEESTHE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES,ANDINSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK.WARRANTYTHE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TOBE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIODOF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BYSTARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORKPROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTINGWORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALSAND WORKMANSHIP.LEEDALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEEDREQUIREMENTS & CODE. IN CASE OF CONFLICT, THE HIGHERSTANDARD SHALL APPLY.INSULATIONWATER PIPINGPROVIDE THERMAL INSULATION PER THE SPECIFICATIONS. UNLESSOTHERWISE REQUIRED BY THE LOCAL AUTHORITY OR ENERGY CODES, THEMINIMUM INSULATION LEVELS SHALL BE AS FOLLOWS:PIPE SIZE (DIAMETER)INSULATION THICKNESSLESS THAN OR EQUAL TO 1 1/2" (38MM)=1" (24MM)2" (51MM) OR GREATER=1 1/2" (38MM)(INSULATION VALUE = K VALUE NOT EXCEEDING 0.27 BTU* INCH (H*FT2*F)SAFETY COVERSFURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITHINSULATED FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADASINK P-TRAPS AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION .PIPINGSOIL, WASTE, AND VENT PIPINGSEE SPECIFICATIONS FOR PIPE MATERIALS. ALL HORIZONTAL RUNSSHALL DRAIN AT A GRADE OF 1/4" PER FOOT (21MM PER METER) WHEREPOSSIBLE BUT IN NO CASE LESS THAN 1/8" PER FOOT (10MM PERMETER) WHERE ALLOWED & SIZED PER AHJ AND CODE.COORDINATE WITH LOCAL AUTHORITIES FOR DRAINAGEREQUIREMENTS FOR EQUIPMENT DESIGNATED WITH INDIRECT WASTETO FLOOR SINKS. INDIRECT DRAIN LINES ARE TO MAINTAIN MIN. 1"(25MM) AIR GAP ABOVE FLOOR SINKS. PROVIDE PIPED DRAIN (P-TRAPAND VENT) TO SANITARY IF REQUIRED BY LOCAL JURISDICTION.CONDENSATE DRAINAGE PIPINGTHE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINSFOR AIR HANDLING UNITS AND STARBUCKS EQUIPMENT (REFER TOSCHEDULE). CONDENSATE DRAINAGE PIPING SHALL BE TYPE "M"COPPER TUBING WITH WROUGHT COPPER SWEAT FITTINGS JOINEDWITH 50/50 SOLDER.HANGERS AND SUPPORTSTHE PLUMBING CONTRACTOR SHALL FURNISH ALL PIPE SUPPORTSREQUIRED FOR EQUIPMENT AND MATERIAL IN ACCORDANCE WITHSPECIFICATIONS. ALL HORIZONTAL RUNS OF PIPING SHALL BESUPPORTED BY PIPE HANGERS INSTALLED AS REQUIRED BY LOCALCODES. ADDITIONAL SUPPORTS SHALL BE PROVIDED WHEREREQUIRED TO PREVENT SAGGING.CONNECTIONSINSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL CONNECTIONTO EACH PIECE OF EQUIPMENT. INSTALL DIELECTRIC COUPLINGS TOCONNECT PIPING MATERIALS OF DISSIMILAR METALS.CLEANOUTSPROVIDE FLOOR AND WALL CLEANOUTS AS INDICATED ON THEDRAWINGS OR WHERE REQUIRED BY CODE IN ALL SOIL, WASTE, ANDDRAIN LINES. SEE SPECIFICATIONS FOR TYPES. CLEANOUTS SHALL BESAME SIZE AS PIPE EXCEPT THAT CLEANOUTS LARGER THAN 4" WILLNOT BE REQUIRED.INSTALLATIONINSTALL PIPING FREE OF SAGS AND BENDS. PROVIDE BRACKETSTANDOFFS FROM MOUNTING SURFACES SUFFICIENT TO ALLOW 1"(25MM) OF CLEANING SPACE ALL AROUND PIPING, INCLUDING ANYADDED PIPING INSULATION. INSTALL FITTINGS FOR CHANGES INDIRECTION AND BRANCH CONNECTIONS. INSTALL SLEEVES FOR PIPESPASSING THROUGH CONCRETE AND MASONRY WALLS, GYPSUM BOARDPARTITIONS, CONCRETE FLOOR AND ROOF SLABS. SEAL PIPEPENETRATIONS THROUGH RATED CONSTRUCTION WITH FIRE STOPPINGSEALANT MATERIAL PER CODE REQUIREMENTS. DO NOT INSTALL PEXPIPING IN RATED WALLS OR THROUGH RATED FLOORS. INSTALL PERMANUFACTURER'S INSTRUCTIONS AND ENSURE PROPER PROTECTIONOF PEX PIPING FROM METAL EDGES. UNDERGROUND WATER ANDSEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUMHORIZONTAL SPACING AS REQUIRED BY CODE, EXCAVATED TO THEPROPER DEPTH AND GRADED TO PRODUCE THE REQUIRED FALL.TESTINGALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEYAREBACKFILLED OR CONCEALED. AFTER TESTING IS COMPLETE, THEPLUMBINGCONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM ASREQUIRED BY LOCAL AUTHORITY. TEST WATER PURITY ACCORDING TOLOCAL REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TOENGINEER FOR REVIEW AND APPROVAL.IDENTIFICATIONPROVIDE PIPE IDENTIFICATION EVERY 10 FT (EXCEPT WHERE PIPES AREEXPOSED TO PUBLIC) IN ACCORDANCE WITH SPECIFICATIONS.PLUMBING FIXTURESWATER HEATERSIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIESHAVING JURISDICTION (AHJ), WHICHEVER IS MORE STRINGENT. PROVIDE AGLASS-LINED, ENERGY EFFICIENT, GAS FIRED (OR ELECTRIC EQUIVALENT)WATER HEATER (SEE SPECIFICATIONS). PROVIDE INSTALLATION COMPLETEWITH FITTINGS AS SHOWN IN THE DRAWINGS. SET HOT WATERTEMPERATURE AT 140° F OR ADJUST AS REQUIRED BY AHJ. PROVIDETHERMOMETER ON HOT WATER PIPE LEAVING WATER HEATER.WATER FILTRATIONSTARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATIONSYSTEM.CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTIONMANAGERWHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL FILTRATIONSYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE WITH ALLPIPING, FITTINGS, AND EQUIPMENT AS INDICATED ON THE DRAWINGS.CONNECTIONSTHE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TOEQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING, VALVES,FILTERS, TRAPS, CHECKS VALVES, VACUUM BREAKERS, AND FLEXIBLE ANDRIGID TUBING.SCHEDULESREFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMSAND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED AS "GC". ANYDISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THESCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FORCLARIFICATION. INSTALL ALL FIXTURES LISTED REGARDLESS OF WHOSUPPLIES.HAND SINKIF FAUCET HAS A TEMPERATURE LIMIT STOP, IT IS TO BE REMOVED SO THATTEMPERED WATER FROM THE WATER HEATER IS NOT FURTHER REDUCED.HOT WATER 100° - 110° F (34° - 43° C) MUST BE ABLE TO REACH SINK WITHIN15 SECONDS.UTILITY SINKSUTILITY SINKS ARE TO DELIVER A WATER TEMPERATURE RANGE OF110° - 120° F (43° - 49° C).DISHWASHERG.C. TO FURNISH AND INSTALL POWER CORD FOR DISHWASHER PERJURISDICTIONAL REQUIREMENTS. IF EQUIPMENT IS SPECIFIED ASHOBART ADVANSYS, THE UNIT IS TO BE PLUMBED WITH COLD, NON-FILTERED WATER. IF THE WATER FILTRATION SYSTEM IS A PENTAIRCONFIGURATION IIOR III, THEN THE COLD, NON-FILTERED WATER MUST ALSO BE SOFTENED.VALVESGENERALPLUMBING CONTRACTOR TO PROVIDE VALVES WHERE INDICATED ONPLANS AND AS NECESSARY FOR PROPER SYSTEM OPERATION ANDCOMPONENT ISOLATION. SEE SPECIFICATIONS FOR TYPES. INSTALLVALVES FOR EACH FIXTURE AND ITEM OF EQUIPMENT. PROVIDE BRAIDEDSTAINLESS STEEL HOSE (UNLESS OTHERWISE NOTED) BETWEEN VALVEAND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'SSPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENTFOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUTMOVING EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE. VALVES SHALLBE LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION(AHJ) AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PERTHE SPECIFICATIONS FOR MAIN WATER SERVICE SHUT-OFF AND ANYOTHER VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE.SUPPLY WATER SERVICEIF WATER PRESSURE SUPPLIED TO STORE IS GREATER THAN 65 PSI,PROVIDE A PRESSURE REGULATOR IN MAIN SUPPLY TO REDUCE WATERPRESSURE. PROVIDE BACKFLOW PREVENTION ON WATER SERVICEIF REQUIRED BY LOCAL CODES.THERMOSTATIC MIXING VALVEPROVIDE A SINGLE THERMOSTATIC MIXING VALVE (TMV) LOCATED AT HOTWATER TANK AND SET FOR 120° (OR AS REQUIRED BY AHJ) TO SERVEHAND SINKS. MIXING VALVE TO BE INSTALLED PER MANUFACTURER’SREQUIREMENTS WITH CHECK VALVES AT SUPPLY INLETS. PROVIDETHERMOMETER ON OUTLET OF TMV. SEE SPECIFICATIONS FORREQUIREMENTS.CARBONATIONIF APPLICABLE TO PROJECT SCOPE, STARBUCKS CARBONATION VENDORWILL PROVIDE AND INSTALL EQUIPMENT, CO2 TANKS AND FITTINGS.STARBUCKS SHALL PROVIDE AND CONTRACTOR SHALL INSTALL CO2TANK MOUNTING BRACKET, PROTECTIVE SHELVING UNIT AND CO2 GASTUBING AS SHOWN ON DRAWINGS AND PER MANUFACTURER’SINSTRUCTIONS. MAXIMUM TUBING LENGTH INCLUDING COILED ENDS IS100 FT (30 M) AND MAXIMUM BEND IS TO 3 INCH (75 MM) MINIMUM RADIUS.ROUTE CO2 TUBING PREFERABLY THROUGH WALL AND/OR CEILINGCAVITIES, WITHOUT KINKS AND SO AS TO NOT TOUCH ANY HOT SURFACE(BALLAST, STEAM PIPE, ETC.) OR RUB AGAINST A SHARP EDGE THAT MAYABRADE OR CUT TUBING. ALL HOLES MUST BE SEALED WITH AGROMMET OR ESCUTCHEON. TUBING IS TO BE SECURED TOAPPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE FLOOR ORCABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT. LABEL BOTHENDS OF TUBING AND REGULARLY AT TEN (10) FOOT INTERVALS ALONGROUTE AS “CO2.”LANDLORD REQUIREMENTSPRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD /BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS /SPECIFICATIONS. IF LANDLORD / BUILDING OWNER DOES HAVEREQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIARWITH REQUIREMENTS / SPECIFICATIONS AND ADHERE TO THEM. WHERELANDLORD / BUILDING OWNER REQUIREMENTS ARE MORE STRINGENTTHAN SHOWN IN THESE PLANS (IN THE OPINION OF THE ENGINEER).LANDLORD / BUILDING OWNER REQUIREMENTS SHALL GOVERN.NITROGENATIONSTARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALLEQUIPMENT AND FITTINGS IF APPLICABLE TO PROJECT SCOPE FORNITRO STATION. GENERAL CONTRACTOR SHALL COORDINATE NITROSYSTEM INSTALLATION WITH STARBUCKS VENDOR.PLUMBING SYMBOL LEGENDSMCDGWS OR WS OR WVCWHWTWROCWFBVGVRVCH. VHBFSFCOWCOWMCWNCWSRDRSBALL VALVEGATE VALVEHOSE BIBBCHECK VALVERELIEF VALVESHOCK ABSORBERSTRAINERFLOOR SINKCONNECT TO EXISTINGSANITARY OR WASTE PIPING ABOVE SLABSANITARY OR WASTE PIPING BELOW SLABCONDENSATE DRAINVENT PIPINGHOT WATER PIPINGGGREASE WASTECOLD WATER PIPINGCOLD WATER FILTEREDTEMPERED WATERREVERSE OSMOSIS WATERGAS PIPINGWATER METERWALL CLEANOUTFLOOR CLEANOUTCOLD WATER NANO FILTEREDCOLD WATER SOFTENEDREFRIGERANT DISCHARGE PIPINGREFRIGERANT SUCTION PIPINGPOCGWCDTWROCWFCWNCWSRDGRSLLMP