My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4426
>
1600 - Food Program
>
PR0529513
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 2:35:21 PM
Creation date
10/1/2021 2:32:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0529513
PE
3116
FACILITY_ID
FA0016051
FACILITY_NAME
STARBUCKS COFFEE #7957
STREET_NUMBER
4426
Direction
E
STREET_NAME
WATERLOO
City
STOCKTON
Zip
95215
APN
10102158
CURRENT_STATUS
02
SITE_LOCATION
4426 E WATERLOO
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(E) FCO(E) 3" SS(E) 3" SS(E) 4" SS(E) 3" SS(E) FS9(E) FS8(E) FS9(E) FS917810WCO3(E) FS912105495(N)2"SS4(R)NI7(R)EM10192775192786192775(R)EM10(E) 4" SSPLUMBING WASTE NOTESASEE SHEET P-0004 FOR FIXTURE SCHEDULES.BPLUMBING CONTRACTOR IS RESPONSIBLE FOR SITE INVESTIGATION PRIORTO START OF ANY WORK TO IDENTIFY FULL SCOPE OF WORK.CCOORDINATE WITH ELECTRICAL CONTRACTOR FOR POWER CONNECTIONS TOALL PLUMBING EQUIPMENT.DREFER TO ARCHITECTURAL DETAILS FOR PLUMBING FITTINGS LOCATEDWITHIN CASEWORK.ECONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS, SIZES ANDDIRECTION OF FLOW OF EXISTING WASTE AND VENT SYSTEMS PRIOR TOSTART OF WORK AND MAKE ADJUSTMENT IN THE PLUMBING WASTE LAY-OUTSHOWN ON THE DRAWING TO SUIT FIELD CONDITIONS.FCONTRACTOR SHALL REPORT TO STARBUCKS CONSTRUCTION MANAGER ANYDISCREPANCY BETWEEN THESE DRAWINGS AND FILED CONDITIONS PRIOR TOCOMMENCING WITH ANY WORK.GSAWCUT (E) CONCRETE FLOOR SLAB AS NEEDED TO INSTALL NEW PIPING.AFTER PIPING INSTALLATION IS COMPLETE BRING THE AFFECTED FLOORSLAB TO ITS ORIGINAL CONDITION.HBEFORE COMMENCING WITH ANY WORK CONTRACTOR SHALL COORDINATEAND VERIFY WITH STARBUCKS CONSTRUCTION MANAGER FOR ALL MODELS,SCOPE AND OPERATIONAL REQUIREMENT OF ALL PLUMBING FIXTURESPRESENTED IN THESE DOCUMENTS.IALL INDIRECT DRAIN LINES MUST BE OF RIGID STRUCTURE. FLEXIBLEINDIRECT DRAIN LINES ARE NOT ACCEPTABLE.JFLOOR SINKS SHALL BE HALF IN AND HALF OUT AND WILL NOT BE ALLOWED INCUPBOARDS.KPROVIDE X-RAY OF EXISTING BEAMS BEFORE ANY NEW PENETRATION ANDPIPE ROUTING TROUGH THE BEAM.LALL NEW CONNECTIONS TO EXISTING INFRASTRUCTURE SHOWN ON THESEDOCUMENTS SHALL BE VERIFIED IN THE FIELD PRIOR TO ANY INSTALLATIONWORK. UPON FIELD INSPECTION, CONTRACTOR HAS OPTION OF REUSINGSECTIONS OF EXISTING SYSTEMS AND PIPING AS HE FINDS APPROPRIATE.MINDIRECT DRAIN PIPE SIZES SHOWN ON SCHEDULE ON SHEET P-0002 ARE FORREFERENCE ONLY. EXACT SIZES AND ROUTING OF INDIRECT DRAIN PIPINGSHALL BE DETERMINED IN THE FIELD.NPIPING AND CONDUITS OF ALL TYPES (ELECTRICAL, WATER AND DRAIN LINES)MUST BE CONCEALED WITHIN WALLS, FLOORS AND CEILINGS.FLOOR SINK NOTEFLOOR SINKS SHALL BE HALF IN AND HALF OUTAND WILL NOT BE ALLOWED IN CUPBOARDS.SHEET NOTESCONNECT TO EXISTING SANITARY SEWER PIPING. VERIFY IN THE FIELDEXACT LOCATION, SIZE AND INVERT ELEVATION OF EXISTING CONNECTINGLINE.CONNECT TO EXISTING VENT PIPING. VERIFY IN THE FIELD EXACT LOCATION,SIZE AND ELEVATION OF EXISTING CONNECTING LINE.PROVIDE NEW 2" SANITARY SEWER AND 1-1/2" VENT UP.CAP WASTE AND VENT PIPING THAT USED TO SERVE (E) HAND SINK BELOWFLOOR AND ABOVE CEILING AS NEEDED.EXTEND INDIRECT DRAIN PIPING FROM WORK/RINSE SINK TO FLOOR SINK.EXTEND INDIRECT DRAIN PIPING FROM ICE BIN TO FLOOR SINK.EXTEND INDIRECT DRAIN PIPING FROM NITRO DISPENSING SYSTEM TOFLOOR SINK.(E) FLOOR SINK / DRAIN TO BE REMOVED WITH ASSOCIATED PLUMBINGPIPING. CAP WASTE AND VENT PIPING BELOW FLOOR AND IN CEILING ASNEEDED. FILL IN THE HOLE AND PATCH THE FLOORING TO MATCH EXISTINGFINISHING.(E) FLOOR SINK TO REMAIN. CONTRACTOR TO VERIFY IN THE FIELD ACTUALLOCATION OF EXISTING FLOOR SINK AND TO ADJUST IF NEEDED.EXTEND INDIRECT DRAIN PIPING FROM ESPRESSO MACHINE TO FLOOR SINK.123456789101112131415P-1103PLUMBING WASTEAND VENT PLAN 1/4" = 1'-0"Plumbing waste and vent planScale: 1/4" = 1'-0"1SHEET NUMBER:SHEET TITLE:SCALE:STORE #:PROJECT #:PROJECT NAME: <br />PROJECT ADDRESS:C 2020 STARBUCKS COFFEE COMPANYRISSUE DATE:2401 UTAH AVENUE SOUTHSEATTLE, WASHINGTON 98134(206) 318-1575THESE DRAWINGS AND THE PROJECT MANUALARE CONFIDENTIAL AND SHALL REMAIN THESOLE PROPERTY OF STARBUCKSCORPORATION, WHICH IS THE OWNER OF THECOPYRIGHT IN THIS WORK. THEY SHALL NOTBE REPRODUCED (IN WHOLE OR IN PART),SHARED WITH THIRD PARTIES OR USED IN ANYMANNER ON OTHER PROJECTS OREXTENSIONS TO THIS PROJECT WITHOUT THEPRIOR WRITTEN CONSENT OF STARBUCKSCORPORATION. THESE DRAWINGS ANDSPECIFICATIONS ARE INTENDED TO EXPRESSDESIGN INTENT FOR A PROTOTYPICALSTARBUCKS STORE (WHICH IS SUBJECT TOCHANGE AT ANYTIME) AND DO NOT REFLECTACTUAL SITE CONDITIONS. NEITHER PARTYSHALL HAVE ANY OBLIGATION NOR LIABILITY TOTHE OTHER (EXCEPT STATED ABOVE) UNTIL AWRITTEN AGREEMENT IS FULLY EXECUTED BYBOTH PARTIES.STARBUCKS TEMPLATE VERSION: i2020.10.23STARBUCKSRSR. DESIGN MANAGER:DESIGN MANAGER:CHECKED BY:Revision ScheduleRevDateByDescription01/28/21ACIESFINAL REVIEW SET400 N McCarthy Blvd.Copyright c 2021info@acies.netfx: (408) 522-5260ph: (408) 522-5255Suite 250, Milpitas, CA 95035ENGINEERINGHIGHWAY 99 & WATERLOO <br />4426 EAST WATERLOO ROAD <br />STOCKTON, CA 95215 <br />COUNTY OF SAN JOAQUIN23871-06801-28-217957JESSICA RAMOS02/05/21ACIESPERMIT SETLLMP
The URL can be used to link to this page
Your browser does not support the video tag.