Laserfiche WebLink
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA D V n D <br /> Electrical Power Distribution ® Electrical Power DistributionIsElectrical Power Distribution <br /> NRCC-ELC-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 01/20) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E <br /> J This document is used to demonstrate compliance with mandatory requirements in§13a5for electrical systems in newly constructed nonresidential,high-rise residential and Project Name: Dutch Bros-Ripon,CA lReport Page: Page 2 of 5 Project Name: Dutch Bros-Ripon,CA Report Page: Page 3 of 5 <br /> J hotel motel occupancies. Additions and alterations to electrical services stems in these occupancies will also use this document to demonstrate compliance per 141. a or <br /> / P Y P P P § 0( I Project Address: 1220 Colony Road Ripon,CA 95366 JDate Prepared: 01.05.2021 Project Address: 1220 Colony Road Ripon,CA 95366 Date Prepared: 01.05.2021 <br /> r¢n §141.0U2P for alterations. <br /> 0 Project Name: Dutch Bros-Ripon,CA Re ort Pae Pae 1 of 5 D.EXCEPTIONAL CONDITIONS Electrical Service Designation/Description: Main Service <br /> � 1 p p g � g <br /> n Project Address: 1220 Colony Road Ripon,CA 95366 IDate Prepared: 01.05.2021 This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. 01 02 03 04 05 <br /> U <br /> A.GENERAL INFORMATION Location of <br /> � able B indicates the project is exempt from§130.5(a)Service Electrical Metering requirements because the utility company has provided the project a metering system that � Minimum Required Separation of Compliance Field Inspector <br /> m Ol Project Location(city) Modesto,CA 02 Occupancy Types Within Project: indicates instantaneous kW demand and kWh for a utilit -definied period. Load Type per Table 130.5-B 2 Requirements in Construction <br /> o y P Load per Table 130.5-B Method <br /> ❑Office ❑ Retail ❑Warehouse ❑ Hotel/Motel ❑School ❑Support Areas Table H.indicates voltage drop calculations will be provided by the contractor. Documents pass Fail <br /> N E] ParkingGarage E] High-RiseResidential ❑Relocatable E] Healthcare Facilities ❑✓ Other(Write In): Food Perp Other non-HVAC loads or appliances>_25kVA Not required Method 2 E3.01 ❑ ❑ <br /> E.ADDITIONAL REMARKS <br /> Q; B.PROJECT SCOPE This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. *NOTES:If"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below. <br /> Z5 Table Instructions:Include any electrical service systems that are within the scope of the permit application. <br /> Ol 02 03 04 OS 06 'FOOTNOTES:For each separate load type,up to 10%of the connected load may be of any type. <br /> Demand Response Controls 'Method 1:Switchboards/motor control centers/panelboard loads disaggregated for each load type <br /> a Where required,demand response controls must F.SERVICE ELECTRICAL METERING — Method 2:Switchboards/motor control centers/ponelboardsupply other distribution equipment with loads disaggregated for each load type <br /> CD Utility System q <br /> 3 be specified which are capable of receiving and Method 3:Branch circuits serve load types individually&provisions for adding future branch curcuit monitoring <br /> Provided subject to CA P g This Section Does Not Apply III I <br /> 0 Electrical Service J Method 4:Complete metering system measures and reports loads by type <br /> Rating Metering Elec Code automatically responding to at least one <br /> Designation/ Scope of Work' See Chapter 8 of the Nonresidential Compliance Manual for more detail on Compliance Methods. <br /> _ g standards based messaging protocol which <br /> Description (kVA) System Article 517 g g P G.SEPARATION OF ELECTRICAL CIRCUITS FOR ENERGY MONITORING <br /> Exception to Exception to enables demand response after receiving a H.VOLTAGE DROP ] <br /> m Table Instructions: Complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(b). Using the <br /> §130.5(a)' §130.5(a)&(t demand response signal. Sections nts N 130.1Table Instructions: Please complete this table or entire/ new or complete replacement electrical ower distributions stems,or alterations that add,mod/ or replace both <br /> �? ) dro down choices in column Ol,indicate the load es included or each service. An load types that are not included in the service do not need to be shown. p f y p P p y fY p <br /> and 1§ 30.3 and compliance documents NRCC- p �`p f y yp eeders and branch circuits to demonstrate compliance with J130.5 c. For alterations,only the altered circuits must demonstrate compliance per§141.0(b)2Piii. <br /> MCH,NRCC-LTI and NRCC LTS will indicate when Electrical Service Designation/Description: Main Service Ol 02 03 04 05 <br /> GNICH <br /> Main Service 42 ❑ <br /> a) New electrical service equipment& V demand response controls are required. <br /> a01 <br /> El 02 03 04 OS Electrical Service Combined Voltage Drop on Installed Feeder/Branch Location of Voltage Drop Sheet Number for Voltage Drop Field Inspector /ARCH ITECTURE <br /> Location of Designation/Description Circuit Conductors Compliance Method Calculations' Calculations in Construction <br /> Minimum Required Separation of Compliance Field Inspector g P P Documents Pass Fail C T I I D I O <br /> a 'FOOTNOTES:Adding only new feeders and branch circuits triggers Voltage Drop 130.5(c),no other requirements from 130.5 are required. Load Type per Table 130.5-8 Load per Table 130.55=B Method' Requirements in Construction IS 1 V <br /> o 'Applicable if the utility company is providing a metering system that indicates instantaneous kW demand and kWh for a utility-defined period. Documents Permitted by CA Elec <br /> Pass Fail OVOltage drop<5% [:]Code(Exception to Contractor Responsible El El <br /> AN OREGON LIMITED LIABILITY COMPANY <br /> Lighting including exit,egress and exterior Not required Method 2 E3.01 ❑ ❑ §130.5(c))* <br /> C.COMPLIANCE RESULTS Permitted by CA Elec <br /> HVAC systems and components Not required Method 2 E3.01 ❑ ❑ Main Service QVoltage drop<5% ❑Code(Exception to Contractor Responsible ❑ ❑ <br /> CL Table Instructions:If this table says"DOES NOT COMPLY"refer to Table D.for guidance and review the Table that indicates"No". <br /> Plug Loads and appliances<25kVA Not required Method 1E3.01 1:1 1:1 §130.5(c))* <br /> U Ol 02 03 04 OS *NOTES:If"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below. *NOTES If"Permitted by CA Elec Code*"is selected under Compliance Method above,please indicate where the exception applies in the space provided below. <br /> E Service Electrical Separation for Voltage Drop Controlled 'FOOTNOTES:Voltage drop calculations may be attached to the permit application outside the construction documents if allowed by the Authority Having Jurisdiction. Select <br /> 0) Metering AND Monitoring AND AND Receptacles "attached"/ a li 1001 SE SANDY BLVD, SUITE 100 <br /> 0 130.5 c Compliance Results Table Continued f pp'cable. If calculations will be the responsibility of the installing contractor,select"Contractor Responsible". <br /> §130.5(a) PORTLAND, OR 97214 <br /> N (See Table F) (See Table G) (See Table H) (See Table 1) I.CIRCUIT CONTROLS FOR 120-VOLT RECEPTACLES AND CONTROLLED RECEPTACLES V. 503.552.9079 <br /> o AND Yes AND Yes AND Yes COMPLIES with Exceptional Conditions Table Instructions:Please complete this table for entirely new or complete replacement electrical power distribution systems to demonstrate compliance with§130.5(d). Both F. 503.241.7055 <br /> 6 <br /> jcontrolled and uncontrolled receptacles must be provided in office areas,lobbies,conference rooms,kitchen areas in office spaces,copy rooms and hotel/motel guest rooms. WWW.G N I C H A R C H.C O M <br /> Table Continued <br /> g) CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 01.13.21 <br /> U) <br /> °) <br /> -0 <br /> ui <br /> c <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> m Electrical Power Distribution ® Electrical Power Distribution <br /> NRCC-ELC-E(Created 01/20) CALIFORNIA ENERGY COMMISSION NRCC-ELC-E(Created 01/20) CALIFORNIA ENERGY COMMISSIOUi <br /> N <br /> o CERTIFICATE OF COMPLIANCE NRCC-ELC-E CERTIFICATE OF COMPLIANCE NRCC-ELC-E <br /> 15 Project Name: Dutch Bros-Ripon,CA Report Page: Page 4 of 5 Project Name: Dutch Bros-Ripon,CA Report Page: Page 5 of 5 ` 78�6m <br /> 0) Project Address: 1220 Colony Road Ripon,CA 95366 Date Prepared: 01.05.2021 Project Address: 1220 Colony Road Ripon,CA 95366 Date Prepared: 01.05.2021 Lu M <br /> 0 <br /> Ui 01 02 03 04 05 06 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT * EXP.Bl3dl Z <br /> 6 Permanent y, F(F �P`' <br /> O Location of Requirements Field Inspector I certify that this Certificate of Compliance documentation is accurate and complete. �� CTR1tP <br /> Room Name Location/Type of Controlled Durable <br /> Shut-Off Controls in ConstructionOF CA4lF�F <br /> 0 or Description Receptacles Marking Will Documentation Author Name: Dan Conrad Documentation Author Signature: <br /> Documents Pass Fail <br /> be Used <br /> E Company: Case Engineering Inc. Signature Date: <br /> NA:No app ica a space types on <br /> x Food Prep this service ❑ ❑ Address: 796 Merus Ct. CEA/HERS Certification Identification(if applicable): <br /> a) <br /> Add Row City/State/Zip: St.Louis,MO 63026 Phone: 636.349.1600 <br /> *If"Other*"is selected under Compliance Method above,please indicate how compliance has been achieved in the space provided below. RESPONSIBLE PERSON'S DECLARATION STATEMENT <br /> _0 I certify the following under penalty of perjury,under the laws of the State of California: <br /> Q J.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION 1.The information provided on this Certificate of Compliance is true and correct. <br /> Table Instructions: Selections have been made based on information provided in previous tab/es of this document. If any selection needs to be changed,please explain why in 2.1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of <br /> Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at httos://ww2CZ .energy.ca.gov/ Compliance(responsible designer) <br /> title24 2019standards 2019 compliance documents/Nonresidential Documents NRC/ 3.The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this <br /> YES NO Form/Title Field Inspector Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Regulations. <br /> Pass Fail 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable Q <br /> compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. <br /> ((:} (} NRCI-ELC-01-E-Must be submitted for all buildings. <br /> CD <br /> � S.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available <br /> o to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the O <br /> K.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE documentation the builder provides to the building owner at occupancy. i N <br /> There are no Certificates of Acceptance applicable to electrical power distribution requirements. Responsible Designer Name: Dan Conrad Responsible Designer Signature: � �� O m <br /> 0 <br /> YCompany: Case Engineering Inc. Date Signed: r , V) <br /> Address: 796 Merus Ct. License: E-17866 r, d <br /> City/State/Zip: St.Louis,MO 63026 Phone: 636.349.1600 Lir <br /> CT <br /> * EXP.6/301 <br /> CD <br /> O <br /> Ln <br /> ATECfiCALlF�FL O N <br /> N <br /> L <br /> U <br /> LL <br /> C <br /> N U �P <br /> L z <br /> -0 , CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2020 O NO <br /> �; N N N <br /> L0 <br /> co O <br /> m .� C)\ <br /> o O �O U <br /> M � <br /> U c° � o . O <br /> nn11L0 <br /> � E Wo <br /> 0 Q U O <br /> N Q O <br /> c 3 N ^/ <br /> NI..L O r <br /> � O <br /> Q ISSUED FOR PERMIT: <br /> iv <br /> 01 .13.2021 <br /> L N <br /> O � <br /> 0 <br /> C <br /> (6 � <br /> 0 Q <br /> O O <br /> EQ EV: DATE: DESCRIPTION: <br /> 0 `6 <br /> 0 <br /> c � <br /> c <br /> 0 <br /> U <br /> N <br /> C <br /> Q) <br /> w <br /> d <br /> d <br /> 7 <br /> SHEET NAME: <br /> a <br /> N <br /> O <br /> 0) <br /> O <br /> (6 - <br /> N <br /> TITLE 24 POWER DIST. <br /> CU FORMS <br /> CPLSE <br /> C/) <br /> m SHEET NUMBER: <br /> Engineering .E Inc <br /> a) 796 Merus Court T 636.349.1600 E5 . 03 <br /> m <br /> `0 <br /> s <br /> St.Louis,MO 63026 F 636.349.1730 <br /> 02020 DB Franchising USA,LLC <br />