CONTRACTORS NOTES: <br /> HVAC CONTRACTOR <br /> 1. HVAC CONTRACTOR SHALL FURNISH AND INSTALL ROOF-TOP UNITS, EXHAUST FAN, DUCTWORK, <br /> INSULATION WRAP, DIFFUSERS, SMOKE DETECTORS, OCCUPIED/UNOCCUPIED PANEL, AND <br /> TEMPERATURE CONTROLS. <br /> REFRIGERANT PIPE TO <br /> 2. THE HVAC CONTRACTOR SHALL VERIFY LOCATIONS FOR ALL HVAC EQUIPMENT ON SITE FROM #10 TEK SCREW TU ROOF MOUNTED <br /> MOST-RECENT KITCHEN EQUIPMENT PLANS. ALL FANS ARE TO BE UL LISTED. (4 PER SIDE MIN) EQUIPMENT, INSULATE <br /> ENTIRE LENGTH OF <br /> 3. ALL HVAC EQUIPMENT CURBS SHALL BE SUPPLIED BY HVAC CONTRACTOR. PATE PIPE CURB PIPING BETWEEN <br /> INSULATED ROOF CURB <br /> CONDENSER AND <br /> EQUIPMENT <br /> U 4. SHIMS SHALL BE PROVIDED BY HVAC CONTRACTOR BETWEEN THE ROOF DECK AND THE CURB TO 10 WOOD SCREW <br /> COMPENSATE FOR ROOF PITCH. <br /> 4 PER SIDE MIN) <br /> U_ <br /> o 5. ALL FLEX DUCT SHALL BE U.L. LISTED, R-6, FOIL-BACKED, CLASSIFIED AS A CLASS 1 AIR DECK rFrr FrFrl] SEAL WATERTIGHT WITH <br /> DUCT. MAXIMUM LENGTH IS TO BE 12' - 0" PER DROP OR PER LOCAL CODE. FOAM SEALANT <br /> ROOF INSULATION, <br /> 6. ALL METAL DUCT AND AIR DISTRIBUTION DEVICES SHALL BE INSULATED WITH R-6, 2" X .75 ®� ROOF MEMBRANE, <br /> DENSITY FOIL-BACKED INSULATION, WITH FIRE AND SMOKE RATING [25]-[50]. �� �� COUNTER FLASHING <br /> 7. ALL DUCTWORK TO BE INDEPENDENTLY HUNG FROM STRUCTURAL MEMBERS. <br /> 8. ALL DUCTWORK SHALL BE FABRICATED, INSTALLED, SEALED, AND EXTERNALLY INSULATED PER - <br /> SMACNA LOW-VELOCITY DUCT MANUAL (LATEST ISSUE). INTERNALLY INSULATED DUCT IS NOT <br /> PERMITTED. L-2x6 BLKG w/ TRUSS WHERE CURB BEARS <br /> LUS26 HGR EA END PER ON DECK, PROVIDE <br /> ' 9. UNLESS OTHERWISE NOTED, ALL SUPPLY TAKEOFFS SHALL HAVE A MANUAL VOLUME CONTROL PLAN CONTINUOUS WOOD <br /> DAMPER. 2x6 BKLG w/ LUS2E BLOCKING IN DECK <br /> TRUSS PERWHERE THERE IS NOT FLUTES, P.T. WOOD GNICH <br /> 47-: ABOVa10. THE HVAC CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS ON SITE WITH THE MOST PLAN A TRUSS BELOW WOODEBLOCK�INGRIDECK .N ARCHITECTURE <br /> RECENT REFLECTED CEILING PLAN. CURB CURB CENTIERLIN of PLENUM EXPOSURES S T U D 1 O <br /> FIELD AN OREGON LIMITED LIABILITY COMPANY <br /> 11. THE HVAC CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE COVERING A ONE-YEAR PERIOD VERIFY <br /> FOR ALL EQUIPMENT AND AN ADDITIONAL FOUR-YEAR PERIOD FOR THE COMPRESSORS IN THE LSEE TYPICAL <br /> Q RTUS. ALL FANS TO BE U.L. LISTED. TRUSS STRUT <br /> CZ <br /> 12. UPON COMPLETION OF PROJECT THE HVAC CONTRACTOR IS TO HIRE AN AABC OR NEBB <br /> ROOF CURB SECTION DETAIL REFRIGERANT PIPING DETAIL <br /> CERTIFIED, INDEPENDENT TEST & BALANCE COMPANY TO CONDUCT A COMPLETE, CERTIFIED TEST NOT TO SCALE NOT TO SCALE <br /> AND BALANCE OF ALL HVAC EQUIPMENT. PROVIDE A WRITTEN REPORT TO NCA CONSULTANTS. 1001 SE SANDY BLVD, SUITE 100 <br /> ALL CAPACITIES MUST BE SET TO AMOUNT INDICATED ON THE FLOOR PLANS AND SCHEDULES. PORTLAND, OR 97214 <br /> Q <br /> V. 503.552.9079 <br /> 13. THE HVAC CONTRACTOR IS TO MAKE ALL LOW-VOLTAGE WIRING FINAL CONNECTIONS FOR ALL F. 503.241.7055 <br /> HVAC EQUIPMENT INCLUDING TEMPERATURE CONTROLS, RTUS, AND SMOKE DETECTORS. WWW.GNICHARCH.COM <br /> G <br /> GENERAL CONTRACTOR <br /> H 01.13.21 <br /> Cli 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO RECEIVE, OFFLOAD, AND STORE ALL F H HVAC EQUIPMENT q <br /> HVAC MATERIALS WHICH ARRIVE AT THE JOB SITE. ALL MATERIAL MUST BE STORED INSIDE THE <br /> BUILDING. <br /> CO �( FE55►C��y,_ <br /> 2. RTU ROOF OPENING SIZES AND ROOF CURBS ARE BASED ON EQUIPMENT SHOWN. IF OTHER PIPE TO GUTTER �� ��L�°y s <br /> EQUIPMENT IS USED, VERIFY ROOF OPENING REQUIREMENTS. MAKE PENETRATIONS AS NEEDED DIRT <br /> ' FOR INSTALLATION OF NEW CURB AND EQUIPMENT. COORDINATE ON SITE WITH HVAC N L LEG $Q31 <br /> R CONTRACTOR. ENSURE THAT ROOFING MATERIAL DOES NOT COVER THE TOP OF ANY HVAC B `"J ROOF +� ?Ui ? <br /> 0 <br /> EQUIPMENT CURB. <br /> `-DRAIN E D 0 C �r��a_ <br /> -.0 <br /> ' * <br /> 3. ALL ROOF, CEILING, WALL, AND STRUCTURAL FRAMING FOR UNIT, FAN, DUCT, DIFFUSER, AND ALL I <br /> F- OTHER HVAC WORK SHALL BE BY THE G.C. COORDINATE ON SITE WITH HVAC CONTRACTOR. NOTES: <br /> X GENERAL CONTRACTOR IS TO PROVIDE ANY SCREENING, GUARD RAILS, ETC. FOR ROOF-MOUNTED OA OMIT COUNTER FLASHING FOR EQUIPMENT WITH BUILT-IN <br /> ' HVAC EQUIPMENT PER LOCAL ADOPTED CODES. ANY REQUIRED PAINTING OF HVAC WORK IS TO COUNTER FLASHING. <br /> BE BY THE GENERAL CONTRACTOR. © PITCH DOWN TOWARD DRAIN, MIN. 1/8" PER ft. <br /> o © MEMBRANE FLASHING TO MATCH MFG. SPECS. FOR ROOF SYSTEM, <br /> 4. IF NECESSARY, THE GENERAL CONTRACTOR IS TO REMOVE, REPLACE, AND/OR REPAIR CEILING 2 WIDE MIN. DUCT STRAP COVER ENTIRE CURB <br /> GRID AND TILES IN ORDER FOR THE HVAC WORK TO BE PERFORMED.. 48" O.C. MAX. OD 3 LAYERS EXTERIOR DRYWALL AND INSULATION FOR SOUND <br /> O <br /> ELECTRICAL CONTRACTOR <br /> INSULATED FLEXIBLE DUCT ATTENUATION.E FACTORY CURB BY HVAC. <br /> Ln <br /> 1. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL PITCH POCKETS FOR POWER AND OF OPEN TO ATMOSPHERE. Q <br /> CONTROL WIRING, AND IS TO MAINTAIN 12" MINIMUM CLEARANCE FROM BACK PANEL OF AIR O <br /> CONDITIONING UNITS. DO NOT PENETRATE BOTTOM OF RTU CURB. FLEXIBLE ELBOW © GAS COCK <br /> O <br /> 2. THE ELECTRICAL CONTRACTOR SHALL INSTALL LOW-VOLTAGE CONTROL WIRING FOR ALL AIR INSULATED FLEXIBLE DUCT OH UNION O m <br /> CONDITIONING CONTROLS. D <br /> Y OI POUNDS TO INCHES GAS PRESSURE REGULATOR <br /> 3. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL DISCONNECTS FOR RTUS AND <br /> INTERLOCK RESTROOM FAN TO RUN CONTINUOUSLY WHILE WORK AREA LIGHTS ARE ON. - _ _ __ __-_ -_ O FULL DIAMETER DRIP LEGS, MIN. 6" LONG <br /> SPIN-IN FITTING <br /> 4. FOR EACH AIR CONDITIONING UNIT, THE ELECTRICAL CONTRACTOR IS TO PROVIDE ONE WITH BALANCING DAMPER O DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE NIPPLE O <br /> � <br /> SINGLE-GANG RECEPTACLE TEST STATION FOR THE REMOTE SENSOR AND/OR T-STAT, AND ONE METAL SUPPLY DUCT ON THE DRAIN PAN. ��yy�� <br /> © CONDENSATE DRAIN TRAP WITH SUFFICIENT TRAP SEAL TO W <br /> '7- DOUBLE-GANG RECEPTACLE REST STATION FOR THE ANNUNCIATOR, WITH GREEN AND RED LIGHT EXTERNALLY INSULATED OFFSET PRESSURE AT DRAIN PAN. O <br /> INDICATORS. THE FIRE AND MECHANICAL INSPECTORS WILL DETERMINE SUITABLE LOCATION FOR O T.S.P. OF FAN PLUS 1" OF WATER. <br /> TEST STATIONS. ANNUNCIATORS AND TEST STATION WILL BE LOOPED IN THE CIRCUITRY OF THE - <br /> SMOKE DETECTION DEVICES. WIRING WILL BE INSTALLED BY ELECTRICAL CONTRACTOR. " �� ON C.O. AT EVERY CHANGE IN DIRECTION GREATER THAN 45' AND <br /> 3-1/2 BATT DIFFUSER CEILING AT MAX OF 50 INTERVALS <br /> INSULATION <br /> In <br /> m OO 2" LAYER OF 6" INSULATION ALTERNATE WITH 1/2 MIN DRYWALL r <br /> PLUMBING CONTRACTOR * REFER TO THE MECHANICAL EQUIPMENT SCHEDULE FOR COMPONENT AND DEVICE SPECIFICATIONS. TO FILL ALL CURB VOID. v <br /> L <br /> U ZL <br /> 1. THE PLUMBING CONTRACTOR TO PROVIDE AND INSTALL CONDENSATE DRAINS/GAS PIPING FOR ALL N No <br /> A/C UNITS, AND PITCH POCKETS FOR RTU CONNECTIONS. DO NOT PENETRATE BOTTOM OF RTU <br /> CURB. HVAC DUCTWORK DETAIL RTU CURB AND PIPING DETAIL 7 Q) oLO rll <br /> 0 2. THE PLUMBING CONTRACTOR IS TO COORDINATE PLUMBING VENT STACKS AND WATER HEATER CU <br /> NOT TO SCALE NOT TO SCALE Z p 0 -,0 U <br /> FLUES WITH OUTSIDE AIR INTAKES OF A/C UNITS. 10'-0" MINIMUM CLEARANCE REQUIRED OR U V) <br /> PER LOCAL CODE. TRANSITION U Ln >. LO O c <br /> FD TO BRANCH O °� V) <br /> Cn <br /> 3. THE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL FLUE GAS EXHAUST VENT FOR WATER SIZE VENT m O Q - O <br /> HEATER. MAINTAIN 10'-0" MINIMUM CLEARANCE TO AIR INTAKES, OR PER LOCAL CODE. O U <br /> COORDINATE ON SITE WITH G.C. AND HVAC CONTRACTOR. RADIUS ELBOW •O U U 0 <br /> I L 0 QL_: O <br /> oCL 0CV E^' O <br /> U <br /> T � <br /> Q I.. �� <br /> Ln <br /> _ o <br /> 1.5D <br /> FULL DEPTH <br /> D MAIN DUCT OF 15 DEG ISSUED FOR PERMIT: <br /> N BRANCH COMBUSTION AIR <br /> .� DUCT ROOF BOOT/ <br /> TRANSITION 0] . 3.2021 <br /> 3 16 X 1 1 2 LONG FLASHING BY <br /> a TO BRANCH SQUARE VANED f EMBEDDED IN/ <br /> OTHERS, SEE <br /> SIZEELBOW FLEXIBLE CONNECTIO STRUCTURE ARCH. DRWG. <br /> TO REDUCE NOISE <br /> D <br /> TURNING VANES <br /> SUPPORT BY M.C.2 GALVANIZED SHEET METALA 0 000 00m 0 <br /> EXH. DUCT DISCHARGE. EV: DATE: DESCRIPTION: <br /> 1-1/2" 22 GAGE CONTINUOUS <br /> 30 DEG GALV SHEET METAL <br /> BRANCH FULL STRAP (TYP ALL) <br /> DUCT DEPTH OF <br /> MAIN DUCT PROVIDE <br /> a OLTOR KELBOW BY M.C. <br /> TRANSITIONS EXAUST FAN <br /> N COMBUSTION SHEET NAME: <br /> » 3/4" / AIR CA <br /> `0 IV LO <br /> o NOTES: S�REWS AND WASHER. VENT DA <br /> 1. DETAIL IS APPLICABLE TO SUPPLY <br /> AIR BRANCH DUCT TAKE-OFFS. <br /> MECHANICAL DETAILS <br /> BRANCH DUCT <br /> cmu <br /> c <br /> SIDE TAP <br /> cmu <br /> BRANCH DUCT TAKEOFFS BATHROOM FAN INSTALLATION DETAIL. CONCENTRIC VENT DETAIL <br /> SHEET NUMBER: <br /> co <br /> NOT TO SCALE NOT TO SCALE NUI IU SCALE <br /> Engineering Inc. M2 . 0 <br /> E <br /> m <br /> 796 Merus Court T 636.349.1600 <br /> St.Louis,MO 63026 F 636.349.1730 <br /> 02020 DB Franchising USA,LLC <br />