Laserfiche WebLink
RFB R-22.1 EXHAUST HOOD VENTILATION NOTES <br /> I - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> - - - - - - - - - - 1. EXHAUST HOODS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH <br /> 1177777779�11 _X --------------- -- "" I _-_- PREVAILING CODES. <br /> 2xs - - - - - - - - - - - 2xs 2xs _ _ _ - - 2xs 2 . Architecture / Development <br /> - ri <br /> 2. ALL EXTERNAL JOINTS AND SEAMS ON EXHAUST HOODS SHALL BE WELDED LIQUID-TIGHT. <br /> 0 3. ALL EXPOSED WELDS ON EXHAUST HOODS SHALL BE GROUND AND POLISHED. 14901 Quorum Drive <br /> Suite 300 <br /> 4. KITCHEN EQUIPMENT CONTRACTOR SHALL PROVIDE AND INSTALL #18 GA. S/S CLOSURE Dallas Texas 75254 <br /> PANELS FROM TOP OF HOODS TO FINISHED CEILING AND BETWEEN BACK-TO-BACK Ph: (972)239-8884 <br /> I SECTIONS, ALONG EXPOSED EDGES. Fax: (972)239-5054 <br /> I <br /> 5. HANGING RODS TO SUPPORT EXHAUST HOODS FROM STRUCTURAL CEILING, SHALL BE ISSUE RECORD <br /> _ / I I PROVIDED BY KITCHEN EQUIPMENT CONTRACTOR. LOCATION OF HANGING RODS SHALL BE DATE DESCRIPTION <br /> I ❑o I I I COORDINATED BETWEEN KITCHEN EQUIPMENT CONTRACTOR, STRUCTURAL ENGINEER, HVAC URBAN PROTOTYPE <br /> CONTRACTOR, GENERAL CONTRACTOR AND ARCHITECT. 7-7-2020 ISSUED FOR PERMIT <br /> I ❑ I v I <br /> \ _ I 6. ALL DUCTWORK BEYOND EXHAUST HOOD COLLARS SHALL BE PROVIDED BY OTHERS, IN <br /> ACCORDANCE WITH JURISDICTIONAL CODES. ALL DUCTWORK MUST BE MECHANICALLY <br /> STRONG, GREASE AND WATER-TIGHT. <br /> -92 1 7. SURFACE FIRE SUPPRESSION SYSTEM FOR EXHAUST HOODS AND ASSOCIATED COOKING <br /> o i I <br /> EQUIPMENT SHALL BE PROVIDED BY KITCHEN EQUIPMENT CONTRACTOR. <br /> 8. FIRE SUPPRESSION SYSTEM SHALL BE FACTORY INSTALLED AND PRE-PIPED INTO EXHAUST <br /> HOODS. APPLICABLE TRADES SHALL CONNECT UTILITY ROUGH-INS BETWEEN FIRE <br /> SUPPRESSION SYSTEM CABINET AND HOODS, THEN MAKE NECESSARY INTERCONNECTIONS <br /> IZ 0 �= BETWEEN FIRE SUPPRESSION SYSTEM CABINET, HOODS, FAN SYSTEMS AND LIGHTS. <br /> s_167-71 9. KITCHEN EQUIPMENT CONTRACTOR SHALL VERIFY THAT FIRE SUPPRESSION SYSTEMS ARE <br /> --- PROVIDED SO AS TO PROPERLY INTERRUPT FUEL SUPPLY TO COOKING EQUIPMENT WHEN REVISION RECORD <br /> M-46 f I SYSTEM IS ACTIVATED. <br /> W I 10. NFPA 96 REQUIRES THAT ALL GAS AND ELECTRIC COOKING EQUIPMENT, WHICH IS <br /> PROTECTED BY SURFACE FIRE SUPPRESSION SYSTEM MUST AUTOMATICALLY SHUT-OFF UPON <br /> LI ACTIVATION OF FIRE SUPPRESSION SYSTEM. <br /> � <br /> R-22.1 R-22.1 L I 11. GENERAL CONTRACTOR AND KITCHEN EQUIPMENT CONTRACTOR SHALL COORDINATE ACCESS <br /> - ❑° I i INTO BUILDING AND INTO SPECIFIC FOODSERVICE AREA(S). KITCHEN EQUIPMENT <br /> 771 ' _ M-66 O I CONTRACTOR SHALL INDICATE FIELD JOINTS ON SHOP DRAWINGS WHEN EXHAUST HOODS ARE <br /> - j I TO BE SHIPPED AND ASSEMBLED IN MORE THAN ONE SECTION. <br /> I I 12. KITCHEN EQUIPMENT CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPACE AVAILABLE <br /> IN FOODSERVICE AREA(S). KITCHEN EQUIPMENT CONTRACTOR SHALL COORDINATE EXHAUST <br /> ❑ ��� I 0 = HOODS AND ASSOCIATED EQUIPMENT TO INTERFACE PROPERLY WITH WALLS, COLUMNS, <br /> 2xs 2xs / 0 DOORS, CHASES, WINDOWS, CEILINGS AND COOKING EQUIPMENT, AND ADJUST ACCORDINGLY. <br /> 0 <br /> M SOT I 0 <br /> ® ° I ❑° C-4 <br /> 13. KITCHEN EQUIPMENT CONTRACTOR TO COORDINATE FINAL EXHAUST HOOD DESIGN WITH <br /> cn iLOii \ va <br /> _ STRUCTURAL AND HVAC ENGINEERS AND CONTRACTORS TO INSURE ADEQUATE SPACE <br /> ALLOCATION FOR INSTALLING HOODS AND CONNECTING TO DUCTWORK. <br /> ---- <br /> ❑ \ \ <br /> M-66 I I <br /> / A / <br /> N / F-STORACE / --- I <br /> CABINET I REFRIGERATION ROUGH-IN LEGEND <br /> / A / <br /> ABOVE ��� ❑O I PROFESSIONAL SEAL <br /> - ❑ \ i I I R-22.1 3 P.V.C. CONDUIT ® 90 A.F.F., FOR REFRIGERATION LINES. <br /> / AND 22 o I I I ICE MAKER REFRIGERATION, CONNECT BETWEEN ITEM 22.1 <br /> - <br /> F ❑D # # <br /> ❑ 1 I <br /> 2x6 �ti��� ►jj, <br /> � rrr I � <br /> - zxs / _ �� 2xs i i 0 I I <br /> ON ROOF (3) LOCATIONS. <br /> T - T / �wABB MAT L L J i I R-42 2" P.V.C. CONDUIT @ 18" A.F.F., FOR REFRIGERATION LINES. '� ,.+► <br /> I n V cV CHEM CABINETIII -- L I REFRIGERATION SYSTEM B, CONNECT BETWEEN ITEM #42 AND #84 ON ROOF G <br /> II - -- - - + _ _ x sroRA <br /> Do LqCEMoIu�IJ - - - - J _ <br /> I 2xs L TANK�on M-66 M-58 0 <br /> R-43 2" P.V.C. CONDUIT ® 18" A.F.F., FOR REFRIGERATION LINES. SE 30 21 <br /> I i � ' 0 REFRIGERATION SYSTEM C, CONNECT BETWEEN ITEM #43 AND #84 ON ROOF. <br /> �\ o ❑ ❑ va OF <br /> V \ \ _ co-2 _ - - - - - - - - <br /> I o I \ ,' - - - - - - - - - - - - - - - - - - - - R-43A 2" P.V.C. CONDUIT @ 18" A.F.F., FOR REFRIGERATION LINES. <br /> RACK RACK <br /> BUN BUN BUN BUN R_42 \ - - REFRIGERATION SYSTEM D, CONNECT BETWEEN ITEM #43 AND #84 ON ROOF. <br /> RACK RACK / <br /> - - - - - - - - - <br /> CO2V ICBEM R-53 REFRIGERATION SYSTEM A, CONNECT BETWEEN ITEM #53 AND #83 ON ROOF. <br /> CABINET 1 <br /> 31 <br /> P.V.C. CONDUIT 16" A.F.F., FOR REFRIGERATION LINES. <br /> REFRIGERATION SYSTEM E, CONNECT BETWEEN ITEM #92 AND #84 ON ROOF. <br /> Lei R-53 �+ SEE K5.0 FOR UNDERGROUND SECTION OF CONDUIT. <br /> CO-1 0 <br /> N CO-2 RFB CO2 FILL LOCATION PROVIDE 2" CONDUIT ® 60" A.F.F., FOR MAIN CO2 FILL, PROTOTYPE VERSION <br /> �- - - - - - - - - -❑�; CONNECT BETWEEN THIS LOCATION AND CO2 ABOVE IN TOWER. 7 6U.2.61 <br /> NOTE: CONNECTION SCREWS HAVE TO BE STAINLESS STEEL ON BOX FOR CO2. <br /> - <br /> CL_ - CO-1 2" P.V.C. CONDUIT @ 60" A.F.F., FOR MAIN CO2 LINES. PROJECT NAME <br /> - - - - - - - 2x6 DQ CONNECT BETWEEN THIS LOCATION AND ROOF TOWER LOCATION. <br /> TELEPHONE L J RUN OVERHEAD, INSTALL WITH SWEEP AT STUB OUT. I N N O U T <br /> 2xs 2xs I I I <br /> I - - <br /> 2xs I III I �� ----- CO-2 2" P.V.C. CONDUIT @ 60" A.F.F., FOR SPARE CO2 LINES. BURGER <br /> CON- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> ECT ETWEN THIS BAG-IN-BOX AREA AND B <br /> NHE INSTALL W/ SWEEP AT STUB OUT.ACK DOOR LOCATION. <br /> RUN OVERE D <br /> I III III I <br /> 1 MECHANICAL PLAN I III III STOCKTON <br /> K 6.0 SCALE: 1/4"=11-0" I III III I <br /> I, I CALIFORNIA <br /> 5202 PACIFIC AVE <br /> HOOD INFORMATION <br /> GENERAL NOTES STOCKTION, CA 95207 <br /> MAX. EXHAUST PLENUM SUPPLY PLENUM HOOD HOOD CONFIG. SWITCHES <br /> HOOD MODEL LENGTH COOKING TOTAL RISERS TOTAL RISERS END TO ON HOOD 1. ALL SODA, REFRIGERATION AND FILTERED WATER CHASES SHALL BE INSTALLED WITH FULL SWEEP <br /> NO. CONSTRUCTION ROW ELBOWS NO 45 DEGREE OR 22.5 DEGREE (1/8TH OF 1/16TH BENDS) WILL BE ALLOWED - NO EXCEPTIONS. <br /> TEMP. EXH. CFM WIDTH LENG. DIA. CFM S.P. SUP. CFM WIDTH LENG. DIA. CFM S.P. END QUANTITY LOCATION <br /> 78.75" 600 RE: MECH 10.5" 10.5" 1,300 VER. 304 SS 2. SECURE CHASE INSIDE WALLS WITH BLOCKING AND FORMED STRAPS. NO PLUMBING METAL TAPE <br /> M-46 OD Deg. DRAWINGS ALONE Remote <br /> 100% 1 Fan (remote) ILLALLOWED. <br /> VER 600 RE: MECH 9" 6" VER. VER. 304 SS 3. ALL REFRIGERATION SWEEPS THAT PENETRATE WALLS SHALL BE CUT OFF 1/4" BEYOND SCHEDULED <br /> M-58 ___ VE Deg. DRAWINGS 100% ALONE 1 Fan WALL FINISH PRIOR TO INSTALLATION OF REFRIGERANT LINES. <br /> 42" 600 RE: MECH 7.5" 7.5" 585 VER. 304 SS 4. ALL REFRIGERATION CHASES SHALL BE SECURED WITH THE OPENINGS 90 DEGREES TO THE WALL FINISH. NoNmOUT <br /> M-66 ___ OD Deg. DRAWINGS 100% ALONE 1 Fan (remote) Remote <br /> 5. CONTRACTOR SHALL FINISH DRYWALL OR OTHER SURFACE TIGHT TO PVC CHASE AND CAULKED WITH SILICONE. <br /> 6. REFRIGERATION LINES SETS ARE GENERALLY LOCATED AT 22" ABOVE HOUSEKEEPING PAD TO CENTERLINE `BURGER® <br /> OF LINE-SET ON EQUIPMENT. CONTRACTOR SHALL VERIFY WITH KITCHEN PLANS AND EQUIPMENT CUTS SHEETS <br /> PRIOR TO ROUGH-IN. GOD BLESS AMERICA <br /> 7. SEE SHEET K5.0 FOR ALL UNDERGROUND ROUGH-IN PLUMBING REQUIREMENTS. <br /> PROJECT NUMBER <br /> 190955 <br /> SHEET TITLE <br /> KITCHEN EQUIPMENT <br /> E MECHANICAL PLAN <br /> Q <br /> cp <br /> N <br /> O <br /> N <br /> CD <br /> SHEET NUMBER <br /> LLJ <br /> OU <br /> cc: <br /> O <br /> m W <br /> Q <br /> D D K6mO <br /> Z Z <br />