My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLUMBING SYSTEM ACCESSORIES <br />Section 15410 <br />15-1207 <br />(1) For Sizes 2 Y2" and smaller - Ball Valve <br />(2) For Sizes 3" and larger — Plug Valve <br />b. At connection to equipment: Lever handle Gas Cock <br />3. Check Valves: <br />a. Piping in horizontal orientation: Swing Check Valve <br />b. Piping in vertical orientation: Lift Check Valve <br />B. General: <br />Install valves with stems upright or horizontal. Valves stem position to be arranged <br />to allow access for maintenance. <br />2. Do not install swing check valves in vertical position. <br />3. Provide gas cocks for gas service. <br />4. Provide lubricated plug valve at gas entrance to building. <br />5. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. <br />Remove special packing materials, such as blocks, used to prevent disc movement <br />during shipping and handling. <br />6. Operate valves in positions from fully open to fully closed prior to installing within <br />system. <br />7. Install valves with unions or flanges at each piece of equipment arranged to allow <br />service, maintenance, and equipment removal without system shutdown. <br />8. Locate valves for easy access and provide separate support where necessary. <br />9. Install valves in horizontal piping with stem at or above center of pipe. <br />10. Install valves in position to allow full stem movement. <br />11. Install check valves for proper direction of flow and as follows: <br />a. Swing Check Valves: In horizontal position with hinge pin level. <br />b. Lift Check Valves: With stem upright and plumb. <br />12. Install valves where required for proper operation of piping and equipment, including <br />valves in branch lines where necessary to isolate sections of piping. Locate valves <br />so as to be accessible and so that separate support can be provided when <br />necessary. <br />13. Provide union at each connection to equipment and downstream of each valve. <br />Provide unions at both ends of valves when valves cannot be turned due to an <br />obstruction. <br />14. Install seismic gas valve downstream of gas meter. <br />15. Tag each valve and provide a complete listing of valve locations and functions. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.