Laserfiche WebLink
PLUMBING EQUIPMENT <br />Section 15450 <br />15-1207 <br />B. Provide a minimum of 3 hours of training and orientation of Owners staff in proper care <br />and operation of electric heat trace. <br />3.05 CARE AND CLEANING: <br />A. Repair or replace broken, damaged, or otherwise defective parts, materials, and work. <br />Leave entire work in condition satisfactory to Architect. At completion, carefully clean <br />and adjust equipment, fixtures, and trim that are installed as part of this work. Leave <br />systems and equipment in satisfactory operating condition. <br />3.06 OPERATION TEST: <br />Test each piece of equipment to show that it will operate in accordance with <br />indicated requirements. <br />3.07 CLEANING UP: <br />A. Upon completion of Work remove materials, equipment, apparatus, tools, and the like, <br />and leave premises clean, neat, and orderly. <br />END OF SECTION <br />5 <br />