My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUCTWORK <br />Section 15890 <br />15-1207 <br />Support ductwork in manner complying with SMACNA "HVAC Duct Construction <br />Standards," latest edition, hangers and supports sections. Where special hanging of <br />ductwork is detailed or shown on Drawings, Drawings shall be followed. <br />a. Except where modified in individual paragraphs in this section or detailed on <br />drawings, provide hanger support with minimum 18 gauge straps, 1 inch <br />wide. Fold duct strap under bottom of duct. <br />b. Install duct supports to rectangular ducts with sheet metal screws. Provide <br />one screw through strap at top of duct and one screw through strap at bottom <br />of duct. <br />2. Upper Connection of support to wood structure shall be with wood screws or lag <br />screws in shear fastened in the upper one half of the wood structural member. <br />Fasteners shall conform to the followina schedule: <br />Duct Size <br />Fastener Size/Type <br />P/2 < 30" <br />Two #10 x 1 '/2"wood screw <br />31 " < P/2 < 72" <br />1/4" x 1 '/2" lag screw <br />P/2 > 73" <br />3/8" x 1 '/2" lag screw <br />3. Upper connection in tension shall not be used unless absolutely necessary. Where <br />deemed necessary, the Contractor shall submit calculations to show the size <br />fastener and penetration required to support loads in tension from wood in <br />accordance with the followina schedule: <br />E. Where ducts pass through interior partitions and exterior walls, conceal space between <br />construction opening and duct or duct -plus- insulation with sheet metal flanges of same <br />gauge as duct. Overlap opening on four sides by at least 1-1/2 inches. <br />F. Where ductwork is exposed, Contractor to paint ductwork, supports, and air inlets and <br />outlets to match adjacent architectural surfaces, or as directed by Architect. <br />3.02 INSTALLATION OF FABRIC DUCTWORK: <br />A. Install fabric ductwork per manufacturer's written instructions. Manufacturer's written <br />instruction shall be on site for IOR and/or Engineers review upon request. <br />3.03 INSTALLATION OF FLEXIBLE DUCTWORK <br />A. Provide flexible ducts with supports at or near mid -length with 2 -inch wide, 26 -gauge steel <br />hanger collar attached to the structure with an approved duct hanger. Installation shall <br />minimize sharp radius turns or offsets. <br />B. Make connections to rigid ductwork with Panduit style draw band. Provide one draw -band <br />at inner liner and a second draw band over the outer vapor barrier material. <br />11 <br />Duct Size Load per hanger <br />P/2 < 30" 260 pounds per hanger <br />31" < P/2 < 72" 320 pounds per hanger <br />73" < P/2 <96" 460 pounds per hanger <br />P/2 > 96" Not Allowed <br />E. Where ducts pass through interior partitions and exterior walls, conceal space between <br />construction opening and duct or duct -plus- insulation with sheet metal flanges of same <br />gauge as duct. Overlap opening on four sides by at least 1-1/2 inches. <br />F. Where ductwork is exposed, Contractor to paint ductwork, supports, and air inlets and <br />outlets to match adjacent architectural surfaces, or as directed by Architect. <br />3.02 INSTALLATION OF FABRIC DUCTWORK: <br />A. Install fabric ductwork per manufacturer's written instructions. Manufacturer's written <br />instruction shall be on site for IOR and/or Engineers review upon request. <br />3.03 INSTALLATION OF FLEXIBLE DUCTWORK <br />A. Provide flexible ducts with supports at or near mid -length with 2 -inch wide, 26 -gauge steel <br />hanger collar attached to the structure with an approved duct hanger. Installation shall <br />minimize sharp radius turns or offsets. <br />B. Make connections to rigid ductwork with Panduit style draw band. Provide one draw -band <br />at inner liner and a second draw band over the outer vapor barrier material. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.