My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUCTWORK <br />Section 15890 <br />15-1207 <br />C. Bends in flexible ductwork shall be kept to a minimum. When required, the minimum bend <br />radius shall be 1.5 times the duct diameter. Duct offsets to be limited to 45 degree turns. <br />3.04 CLEANING AND PROTECTION <br />A. Ductwork being stored on site to be covered and protected from elements. Internally lined <br />ductwork to be stored on jobsite in clean / dry location. Any insulation exposed to water <br />must be discarded immediately and removed from jobsite. <br />B. Clean ductwork internally, unit by unit as it is installed, of dust, dirt, and debris. <br />C. Clean external surfaces of dirt and foreign substances that might cause corrosive <br />deterioration of metal or where ductwork is to be painted. <br />D. Strip protective paper from stainless ductwork surfaces, and repair finish wherever it has <br />been damaged. <br />E. Temporary Closure: At ends of ducts which are not connected to equipment or air <br />distribution devices at time of ductwork installation, provide temporary closure of <br />polyethylene film or other covering which will prevent entrance of dust and debris until time <br />connections are to be completed. <br />F. If HVAC System is operated prior to the completion of construction, Contractor to provide <br />temporary filters at all return air and exhaust air grilles. Filters to be 2" thick, MERV 8 filters. <br />Contractor to secure filters in place with tape or wiring. Filters to completely cover grille <br />opening. <br />3.05 OPERATION TEST: <br />A. Test each piece of equipment to show that it will operate in accordance with indicated <br />requirements. <br />3.06 CLEANING UP: <br />A. Upon completion of Work remove materials, equipment, apparatus, and tools, and leave <br />premises clean, neat, and orderly. <br />END OF SECTION <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.