My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUCT ACCESSORIES <br />Section 15910 <br />15-1207 <br />PART 1 —GENERAL <br />1.01 SUMMARY <br />A. This Section includes requirements for the following duct accessories: <br />1. <br />Volume Control Dampers <br />2. <br />Air Inlets and Outlets <br />3. <br />Fire/Smoke Dampers <br />4. <br />Fire Dampers <br />5. <br />Turning Vanes <br />6. <br />Duct Access Doors <br />7. <br />Flexible Connections <br />B. For additional requirements, reference Section 01810 — Systems Commissioning. <br />1.02 QUALITY ASSURANCE <br />A. SMACNA Compliance: Comply with applicable portions of Sheet Metal and Air Conditioning <br />Contractor's National Association (SMACNA) HVAC Duct Construction Standards (Metal <br />and Flexible), latest edition, for all work in this section. <br />B. ASHRAE Standards: Comply with American Society of Heating, Refrigerating, and Air <br />Conditioning Engineers, Inc. (ASHRAE) recommendations, latest edition, for all work in this <br />section. <br />C. NFPA Compliance: Comply with ANSI/NFPA 90A, "Standard for the Installation of Air <br />Conditioning and Ventilating Systems," and ANSI/NFPA 9013, "Standard for the Installation <br />of Warm Air Heating and Air Conditioning Systems." <br />D. Compliance: Construct, test, install and label fire dampers and fire doors in accordance with <br />Underwriters Laboratories (U.L.) Standard 555, "Fire Dampers and Ceiling Dampers." <br />E. The Diffuser, Register, Grille manufacturer shall provide published performance data for all <br />air inlets/outlets. Performance tests shall be tested in accordance with ANSI/ASHRAE <br />Standard 70-1991. <br />F. Combination Fire smoke Dampers: <br />1. Manufacturer: Test and qualify with UL a complete range of damper sizes covering <br />dampers specified. Testing 1 size only is not acceptable. <br />2. Damper Capacity: Demonstrate damper capacity to open and close under HVAC <br />system operating conditions in accordance with UL 555S. <br />a. Closed Position: Maximum pressure of 4" w.g. <br />b. Open Position: Maximum air velocity of 3,000 feet per minute. <br />1.03 SUBMITTALS <br />A. Product data: submit complete data of materials proposed including: <br />1. Manufacturer and model number <br />2. Clearly indicate all options, trim, and accessories. <br />3. Cross reference manufacturer's cut sheet to fixture callout ID on submittal sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.