My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DUCT ACCESSORIES <br />Section 15910 <br />15-1207 <br />A. Install flexible connection in accordance with manufacturer's installation instructions. <br />B. Furnish and install flexible connections at following locations: <br />1. Duct connection of supply fan. <br />2. Duct connection of return fan. <br />3. Duct connection of exhaust fan <br />4. Duct connection of factory -built fan unit <br />5. Elsewhere as shown on Drawings <br />a. Flexible connections will not be required for curb -mounted, roof- type exhaust <br />fans or downflow packaged AC Units. <br />C. Provide ceiling access and service clearance to units, coils and controls. Provide access <br />doors to unit above gypsum board ceiling or locate above easily removable ceiling <br />components. <br />D. Support units individually from the structure. Do not support from adjacent ductwork. <br />E. Seismically brace unit as shown on drawings. <br />3.08 CARE AND CLEANING: <br />A. Repair or replace broken, damaged, or otherwise defective parts, materials, and work. <br />Leave entire work in condition satisfactory to Architect. At completion, carefully clean and <br />adjust equipment, fixtures, and trim installed as part of this work. Leave systems and <br />equipment in satisfactory operating condition. <br />3.09 CLEANING UP: <br />A. Upon completion of Work remove materials, equipment, apparatus, tools, and the like, and <br />leave premises clean, neat, and orderly. <br />END OF SECTION <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.