My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIR & WATER SYSTEM BALANCING <br />AND ACCOUSTICAL TESTING <br />Section 15990 <br />15-1207 <br />locations. <br />a. Hand drawn/numbered drawings shall not be accepted. <br />4. Reports to be stamped and signed licensed TAB Contractor. <br />5. Submit three copies of complete test report prior to final acceptance of project. <br />D. Balance agency shall submit the results of tests in this SECTION for review by the Architect. <br />PART 2 - PRODUCTS <br />2.01 PATCHING MATERIALS: <br />A. Except as otherwise indicated, use same products as used by original installer for patching <br />holes in insulation, ductwork and housings which have been cut or drilled for test purposes, <br />including access for test instruments, attaching jigs, and similar purposes. <br />1. At tester's option, plastic plugs with retainers may be used to patch drilled holes in ductwork <br />and housings. <br />2.02 TEST INSTRUMENTS: <br />A. Utilize test instruments and equipment for test and balance work required, of type, precision, <br />and capacity as recommended in the following test and balance standards: <br />1. Comply with AABC's Manual "AABC National Standards," Volume 1. <br />PART 3 - EXECUTION <br />3.01 BALANCING: <br />A. Upon completion of hydronic and air handling systems, balance agency shall complete <br />tests, analysis, and balance of hydropic and air handling systems for heating -cooling <br />equipment. <br />B. Balancing to be completed prior to test and acceptance of fire alarm/detection systems. <br />C. This report shall include as minimum, but not be limited to, following design and actual <br />information: <br />Air -Moving Equipment Data: <br />a. Fan or unit number. <br />b. Location. <br />C. Area served. <br />d. Manufacturer. <br />e. Model number and serial number. <br />f. Design and actual air -flow measurements: <br />(1) Total CFM. <br />(2) Return air CFM <br />(3) Outdoor air CFM <br />(4) Relief air CFM <br />(5) Total/external static pressure in w.g. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.