Laserfiche WebLink
ELECTRICAL WORK, GENERAL <br />REQUIREMENTS <br />Section 16000 <br />15-1207 <br />PART 1 - GENERAL <br />1.1 CONDITIONS: <br />A. The Requirements of General Conditions and Special Conditions apply to Work of this Section <br />as if fully repeated herein. <br />B. The Requirements of this Section apply to all Work of Division 16. <br />C. Where items specified in other Sections of Division 16, conflict with requirements of this Section, <br />the most stringent requirements shall govern. <br />1.2 WORK INCLUDED: <br />A. Provide a complete working installation with all material and equipment as shown and specified. <br />The Contract Documents do not undertake to show or specify every item to be provided. When <br />an item not shown or specified is necessary for proper operation of equipment shown or <br />specified, provide the item, which will allow the system to function properly, at no increase in <br />Contract Price. <br />B. Make electrical connections for equipment furnished as part of Work of other Sections. <br />1. Wherever term "electrical connections" is used, it shall be taken to include all operations and <br />materials associated with completing electrical connection starting with pulled -in wire or <br />cable including, but not limited to, the following: <br />a. Stripping of jacket(s). <br />b. Checking for continuity. <br />C. Meggering. <br />d. Tracing or wire and cables. <br />e. Fanning. <br />f. Measuring and cutting to final termination lengths. <br />g. Permanent identification of conductors in manner specified. <br />h. Stripping of insulation. <br />i. Installation of lugs, connectors or terminals. <br />j. Fastening wire or cable to designated terminal point, motor leads, or other <br />designated points. <br />k. Taping as required. <br />1. Installing wire markers. <br />C. Seismic Requirements: Provide all equipment to resist forces produced by lateral loads <br />specified for Seismic zone No. 3 in the 2013 California Building Code. For all seismic bracing <br />systems, submit structural calculations and details prepared and signed by the Contractors <br />licensed structural engineer which include all resultant forces applied to the building structure. <br />Do not overstress building structure. Calculations will be reviewed for compliance with design <br />criteria, not for arithmetic. <br />