Laserfiche WebLink
SITE ELECTRICAL WORK, GENERAL <br />REQUIREMENTS <br />Section 16000 <br />15-1207 <br />A. Provide full size copies of "As Built" One Line Diagrams, in metal frames with glass front. Have <br />"As Built" prints framed by a firm normally engaged in this work. Locate diagrams in vicinity of <br />switchboard. <br />B. Upon completion of Work, furnish Architect with complete sets of plans (not marked blueprints) <br />upon which shall be shown all Work installed under Contract which are not in accordance with <br />original Contract Drawings. Refer also to requirements of Division 1. <br />C. All symbols and designations used in preparing Record Drawings shall match those used in <br />Contract Drawings. <br />1.9 PRODUCT DELIVERY, STORAGE, AND HANDLING: <br />A. Identify materials and equipment delivered to site to permit check against materials list and Shop <br />Drawings. <br />B. Protect from loss or damage. Replace lost or damaged materials and equipment with new at no <br />increase in Contract Sum. <br />1.10 SITE EXAMINATION AND CONDITIONS: <br />A. Examine site; verify dimensions and locations against Drawings and become informed of all <br />conditions under which Work is to be done before submitting proposals. <br />B. Information shown relative to services is based upon available records and data but shall be <br />regarded as approximate only. Make deviations found necessary to conform with actual <br />locations and conditions with no increase in Contract Sum. Verify locations and elevation of <br />utilities prior to commencement of excavation for new underground installations. <br />C. Exercise extreme care in excavating near existing utilities to avoid any damage thereto; be <br />responsible for any damage caused by such operations. <br />1.11 DRAWINGS AND COORDINATION WITH OTHER WORK: <br />A. Drawings: <br />1. For purposes of clarity and legibility, Drawings are essentially diagrammatic to the extent that <br />many offsets, bends, special fittings, and the exact locations of items are not shown, unless <br />specifically dimensioned. <br />2. Exact routing of wiring and locations of outlets, panels, and other items, shall be governed by <br />structural conditions, and materials and equipment already in place. Use data in the Contract <br />Documents. In addition, the Architect reserves the right, at no increase in Contract Sum, to <br />make any reasonable change in locations of exposed electrical items, to group them into <br />orderly relationship and/or increase their utility. Verify the Architect's requirements in this <br />regard prior to roughing -in. <br />0 <br />