My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRICAL WORK, GENERAL <br />REQUIREMENTS <br />Section 16000 <br />15-1207 <br />a. Specifically show, by drawn detail or note, that equipment complies with each <br />specified requirements of the Contract Documents. <br />b. Drawings shall be to scale and dimensioned (except wiring diagrams need not be <br />to scale), and may be prepared by a vendor but shall be submitted as instruments <br />of Contractor, thoroughly checked and stamped by Contractor before submission <br />to Architect for review. <br />C. Catalog cuts and published material may be included to supplement scale <br />drawings. <br />9. Internal wiring diagrams of equipment shall show wiring as actually furnished for this <br />project, with all optional items clearly identified as included or excluded. Clearly identify <br />external wiring connections. Identify and obliterate superfluous material. <br />10. External system wiring diagrams shall show wiring as actually installed, connected and <br />identified for this project. Include identification of cables, cable conductors, terminals in <br />terminal cabinets, and connections to the identified external wiring connection points on <br />equipment. Prepare Drawings on twenty-two inches (22") by thirty-four inches (34") <br />tracing sheets bearing title block of equipment manufacturer, manufacturer's local <br />engineering distributor, or Contractor, prepared to accepted drafting standards and <br />bearing Contractor's approved stamp. <br />11. Acceptance of a substitute is not to be considered a release from the Specifications. <br />Correct any deficiencies in an item, even though approved, at Contractor's expense. <br />12. Be response for installation of approved substitution. Make any changes required for <br />installation of approved substituted equipment at no increase in Contract Sum. <br />13. Provide design and details of anchorages and/or restraints conforming to 2013 California <br />Building Code. <br />B. Operating and Maintenance Instructions and Materials: <br />1. Subsequent to final completion and testing operations, part of the Work of this Division shall be <br />responsible for instructing the Owner's authorized representatives in operation, adjustment <br />and maintenance of electrical plant. Submit three (3) copies of certificate, signed by Owner's <br />representatives, attesting to their having been instructed. <br />2. Before Owner's personnel assume operation of systems, submit three (3) bound sets of <br />Operating and Maintenance Instructions, Manuals, and Parts Lists on the electrical plant and <br />its component parts, including all major equipment and that which requires or for which <br />manufacturer recommends, maintenance in a specified manner. Provide names, addresses <br />and telephone numbers of source of supply for parts. <br />1.7 ELECTRONIC MEDIA: <br />A. Computer aided design (CAD) working copy shall be available to Contractor for preparation of <br />shop or record drawing submittals. Each CAD drawing as shown on Contract Documents will be <br />released in AutoCAD format by means of electronic mail. CAD drawings will be released upon <br />receiving signature of Electronic Data Transfer Agreement. Release of CAD drawings shall be <br />subject to approval of Architect and Engineer. <br />1.8 PROJECT RECORD DOCUMENTS: <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.