My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECURITY CAMERA <br />Section 16750 <br />15-1207 <br />maintenance. A copy of this listing of devices and their functions shall be provide on a <br />computer thumb drive, zip drive or cd in Microsoft Word format. As -built drawings shall be <br />provided on a zip drive or cd. <br />3.04 PROCEDURE <br />A. Upon completion of IT related services performed by contractor shall be reviewed by IT <br />personnel. <br />B. IT personnel shall be accompanied by contractor to review work performed and to ensure <br />work has been completed according to scope or specification. <br />C. If work has not been completed to the satisfaction of the scope or specification, the contractor <br />shall develop a punch list detailing those items that did not meet the requirements of Manteca <br />Unified School District IT Department. The punch list shall be in an electronic format and <br />shared with the IT Department. <br />D. Contractor shall complete all punch list items identified during IT and contractor's walk <br />through. The contractor shall update the electronic version of the completed items and share <br />with the IT department. <br />E. IT personnel shall be accompanied by contractor to review that the outstanding punch list <br />items have been documented as complete. <br />F. IT will not sign -off on any IT related services until all punch list items are complete. The <br />contractor will be responsible for ensuring the punch list items are complete to the scope's <br />satisfaction. <br />G. IT related services are but not limited to: <br />1. Demolition of Wireless Radio Frequency WAN Towers <br />2. Fiber Cabling Infrastructure <br />3. Copper Cabling Infrastructure <br />4. Cisco Network Switches <br />5. Cisco Network Routers <br />6. Cisco Wireless Access Points <br />7. Cisco VolP Phones <br />8. Network Configurations (Access, Distribution, Core, VRF, MPLS, Call Manager) <br />9. Network Wireless Configurations (WLAN Controller, MSE) <br />10. Network Security Configurations (Cisco Firewalls, ISE) <br />11. Network Management Configurations (Prime Infrastructure) <br />12. Arecont Security Cameras <br />13. Exacqvision Enterprise <br />14. Dell Servers <br />15. DMAC Cabinet/Enclosures <br />16. APC Uninterruptable Power Supply <br />3.05 SPARE PARTS <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.